Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 6

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  bank erosion
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
One of the natural disasters caused by river meandering is riverbank erosion, which creates social, economic, and environmental problems in the riparian zone and serves as a source of increasing sedimentation levels in the river. Riverbank erosion and bank failure create a complex cyclical process, such as riverbank retreat, which cannot be easily measured and predicted by any model. The meandering flow along the Bhagirathi-Hooghly river has created riverbank erosion and riverbank retreat conditions in several areas, through which measuring bank stability and erosion is quite complex. As a result, the BSTEM model, integrating with HEC-RAS, has been used in this article to measure riverbank erosion and retreat accurately. Riverbank erosion and retreat data for 2019–2020 have been simulated based on data observed from 2016 to 2018 for accurate measurement. In addition, the total sediment yielded from the river bank has been calibrated and simulated with the help of sediment transport formulation in HEC-RAS, which indicates a gradual increase in river erosion at present (2019–2020). This model is expected to help formulate government policy on protecting riverbank erosion and river restoration in the future.
2
Content available remote Posadowienie wysokiego budynku na prefabrykowanych palach wbijanych
PL
Wybrany przypadek dotyczy budynku wielokondygnacyjnego, posadowionego bezpośrednio przy erozyjnym brzegu rzeki. Wykonawca fundamentów zrealizował zamienny, własny projekt: posadowienie na 230 wbijanych prefabrykowanych palach żelbetowych. Płytę ułożono na głębokości 0,7 m p.p.t. Po wbiciu 76 pali stwierdzono w trzech rzędach przemieszczenia poziome głowic pali w kierunku rzeki, które początkowo wynosiły ok. 20 cm i zwiększyły się do 50 cm. Przedstawiony przykład posadowienia na palach wbijanych, mimo dobrego geotechnicznego i geologiczno-inżynierskiego rozpoznania podłoża [3, 7], wskazuje, że w złożonych warunkach gruntowych należy analizować ostateczny projekt w zespole profesjonalistów, w tym doświadczonego geotechnika [1].
EN
The many-tiered building is located on the low terrace, directly next to the erosive bank of the river. Nonetheless, the constructor of the foundations realized a different project: deep foundation on prefabricated 230 concrete pales. The plate was placed at the depth of 0,7 m. After driving the first 76 pales, horizontal displacements of the pale head towards the river in first three rows were observed. The shifts increased from initially 20 cm to 50 cm. Geotechnical analysis [3, 7] revealed that the reason for the displacements may be disturbance of steady state, caused by activation of quasi soil wedge and its displacement along with the pales in the direction of the river [1].
PL
Na potoku Trzebuńka w miejscowości Stróża podjęto i zrealizowano projekt polegający na obniżeniu o 4.0 m i rewitalizacji istniejącej zapory przeciwrumowiskowej, przebudowując jej konstrukcję poniżej tworząc bystrza z głazów osadzonych w konstrukcji betonowej (tzw. „grouted rock”). Całość konstrukcji tworząca 12 małych zbiorniczków na wodę stanowi obecnie rodzaj przepławki dla ryb. W artykule przedstawiono wstępne wyniki analizy przebiegu procesów korytowych na potoku Trzebuńka powyżej przebudowanej zapory. W literaturze światowej opisane są lokalne przypadki zlikwidowanych lub obniżonych i przebudowanych wielu zapór różnej wielkości. Wciąż brakuje jednak odpowiedzi na wiele pytań dotyczących reakcji koryta na taką interwencję. Dyskutowany jest problem tempa przemieszczenia materiału zdeponowanego w zbiorniku i konsekwencji obniżenia bazy erozyjnej dla odcinka koryta powyżej zapory. Po dwóch latach od przebudowy zapory i uwolnieniu rumowiska z czaszy zbiornika, przeobrażenia nowo ukształtowanego koryta powyżej nowej konstrukcji mają przebieg dynamiczny. Wyniki pomiarów koryta Trzebuńki na odcinku o długości 180.0 m powyżej nowej zapory wskazują na zdecydowane migracje boczne koryta (erozja boczna). Dopiero powyżej 200.0 m od korony nowej konstrukcji koryto wykazuje stabilność.
EN
On Trzebuńka stream, in Stróża village, the project of lowering of 4.0 m and restoring the check dam has been executed. The structure downstream was redesigned to form rapids, made of stones embedded in the “grouted rock” construction. Now, the whole construction of 12 small water reservoirs forms a kind of long fish pass. The preliminary results of stream channel evolution on Trzebuńka stream above the restored check dam are presented in the paper. There are described the local cases of check dam liquidation or restoration in the World. However, there are still many questions concerning the response of stream channel to such technical intervention. The problem of rate of sediment displacement in the reservoir and the consequent erosion base reduction for the channel above is discussed. The field measurements and observation show that two years after check dam lowering and emptying the sediment reservoir on Trzebuńka stream the transformation of new formed channel upstream the new structure is dynamic. At the length of 180.0 m upstream the new dam the bank erosion is significant. Just above 200.0 m upstream from the structure the channel is stable.
PL
W artykule podjęto próbę analizy wpływu zjawisk lodowych na erozję brzegów koryta rzeki pojeziernej na przykładzie rzeki Łyny (północno-wschodnia Polska). Do analizy wytypowano przekrój Smolajny, położony w jej środkowym biegu. Badania przeprowadzono w latach hydrologicznych 2005-2012. W badanym okresie obserwowano występowanie, rozwój i intensywność zjawisk lodowych, takich jak: lód brzegowy, pokrywa lodowa, spływ wody na lodzie na tle zmian cech morfologicznych koryta rzecznego. W wyniku obserwacji stwierdzono skokowe zwiększenie się szerokości koryta w badanym profilu poprzecznym (dwukrotnie po 0,5 m). Związane było to z długim czasem zalegania grubej pokrywy lodowej. W latach 2005-2012 zaobserwowano fluktuacje wielkości cech morfometrycznych, zarówno dodatnie jak i ujemne. Czynnikiem kształtującym brzegi koryta są ponadto gwałtowne roztopy pokrywy śnieżnej przy jednoczesnym utrzymywaniu się pokrywy lodowej. Wpływa to na zwiększone podmywanie brzegów koryta. Wykazano, że w badanym okresie nastąpiło zwiększenie szerokości koryta w badanym przekroju o jeden metr, zwiększenie powierzchni przekroju poprzecznego oraz głębokości maksymalnej i średniej.
EN
The aim of the paper is attempt to analysis influence on bank erosion on example Łyna river (NE Poland). The analysis has been performed at the cross section of Smolajny during hydrological years 2005-2012. In that period we observed occurrence, evolution and intensity of ice phenomena, such as: border ice, ice cover, water runoff on ice cover. Simultaneously, hydrological and morphological measurements of bed channel have been done. Results showed that width of river bed had increase, bit by bit (twice by 0,5 m), in observed cross section. There was observed fluctuation attributes of morphology in years 2005-2012, both positive and negative. Sudden snowmelt has a great impact on bank erosion, with prolonged ice cover. That situation has influence on sapping of banks. It was stated that, in spite of fluctuations of channel morphological parameters, the overall increase in the channel width was at about 1m in 2005-2012. Similarly other parameters, as wetted area, maximal and average depths have increased in those years.
5
Content available remote Zależność stabilności brzegów Półwyspu Helskiego od sztucznego zasilania
PL
Znaczenie sztucznego zasilania brzegu rumowiskiem piaszczystym w procesie utrzymania plaż i wydm Półwyspu Helskiego od strony otwartego morza. Kubatura osadów zakumulowanych w lądowo-morskiej strefie przybrzeżnej jako wskaźnik odporności brzegu na erozję. Przestrzenna zmienność podatności na erozję brzegów Półwyspu Helskiego.
EN
Importance of artificial shore nourishment using sandy sediments for maintenance of Hel Peninsula beaches and dunes at the open sea side. Volume of sediments accumulated in the coast transitional zone as the factor of the resistance to erosion processes. Spatial variability of erosion vulnerability of Hel Peninsula coast.
6
Content available remote Appraise of consequences of erosive processes occurring in the Skawa river sector
EN
Erosive processes have been evaluated in a sector of the Skawa river characterized by high pliability to erosion (proportion between the bend radius and the river channel width equals on the average 6.5). Within two years, channel erosion caused by 6 freshets was investigated with flows Q within the range of probability of waters from 20% to 50%. Bank and bottom erosion as well as transportation of the bed material and material from falls of bank slopes were found to occur. Intensity of this transportation was calculated based on Bagnold's equation. The calculated value of transported bed load was comparable with that obtained from direct measurements. The effects of transportation were also reflected by changes of the grain size distributions after passage of a freshet wave. Bank erosion was the dominating process that changed the river channel shape. It was found that in the examined sector the retreat of the bank slope proceeded at the rate of 1.20 m/year.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.