Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 5

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  assembly sequence planning
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
This paper presents a new approach for searching the most favourable mechanical assembly sequence. The proposed method is described and its basic modules are presented. The concept is based on the assumption that the method should help the engineer in specifying the best assembly sequence with the short possible time calculation, taking into account the principles of design for assembly at an early stage of development of the product design. The algorithm for generating an accurate assembly sequence was described in detail and its application on real-life example was presented.
EN
The article characterises the sea-going vessel hull assembly processes and then reviews the existing assembly methods of mechanisms and welded ship structures. Classification of these methods is done with respect to selected criteria of their applicability to hull assembly. Selected methods are used for calculations performed on a model structure and exemplary database. The analysed aspects include the performance of calculation algorithms and the quality of the obtained solutions. Particular attention is paid to the need for reduction of experts’ participation in the planning process due to strong search space explosion effect. The performed analyses have enabled the authors to formulate assumptions for models which would be applicable in real assembly planning in shipyards, as well as to indicate areas of further research which would make it possible to better consider the specificity of production of large-size welded structures.
EN
The specificity of the yard work requires the particularly careful treatment of the issues of scheduling and budgeting in the production planning processes. The article presents the method of analysis of the assembly sequence taking into account the duration of individual activities and the demand for resources. A method of the critical path and resource budgeting were used. Modelling of the assembly was performed using the acyclic graphs. It has been shown that the assembly sequences can have very different feasible budget regions. The proposed model is applied to the assembly processes of large-scale welded structures, including the hulls of ships. The presented computational examples have a simulation character. They show the usefulness of the model and the possibility to use it in a variety of analyses.
4
Content available remote Projektowanie dla montażu – ocena połączeń elementów i zespołów maszyn
PL
W artykule przedstawiono ocenę połączeń montażowych zgodną z ogólnie przyjętymi zasadami projektowania dla montażu. Szczegółowo opisano wskaźnik charakteryzujący stopień skomplikowania połączenia dwóch części oraz przedstawiono jego zastosowanie do oceny i wyboru najkorzystniejszej sekwencji montażu.
EN
This paper presents an evaluation of the assembly connections in accordance with generally accepted principles of design for assembly. A detailed description of the indicator characterizing the complexity of the two parts connection and its application to the evaluation and selection of the best assembly sequence are presented.
5
Content available remote Projektowanie wyrobów i planowanie sekwencji montażu z uwzględnieniem zasad DFA
EN
In this paper a method of planning and selection of assembly sequences is described. This method is assigned to designers, who create new mechanical sets and is oriented at designing parts which should be assembled easily and cheaply. The application of the method and its computer implementation are shown on the real life examples.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.