Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 8

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  assembly scheduling
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
The method presented herein is used to build new schedules, particularly when it is necessary to modify previous schedules for assembly operations. It is used to include new, urgent orders in a schedule, as well as if at least one machine malfunctions. This method applies to assembly of electrical equipment in a one-way assembly line without parallel machines and without local storages. Due to lack of intermediate buffers in the assembly line setup, two cases were taken into account: possibility of the machines being blocked by products awaiting further operations and nowait scheduling. The assembly schedules concerning these cases were compared by conducting computational experiments. These experiments were conducted on constructed integer programming task models.
PL
Przedstawiona metoda służy do budowy nowych harmonogramów, zwłaszcza gdy jest konieczne dokonanie zmian w uprzednich uszeregowaniach operacji montażowych. Jest ona stosowana w celu uwzględnienia w harmonogramie nowych, pilnych zleceń, a także w przypadku awarii co najmniej jednej maszyny. Metoda dotyczy montażu sprzętu elektrycznego w jednokierunkowej linii montażowej bez maszyn równoległych oraz bez lokalnych magazynów. W związku z brakiem buforów międzyoperacyjnych w konfiguracji linii montażowej uwzględniono dwa przypadki: możliwość blokowania maszyn przez produkty oczekujące na wykonanie kolejnych operacji oraz szeregowanie „bez czekania”. Harmonogramy montażu dotyczące tych przypadków zostały porównane za pomocą przeprowadzonych eksperymentów obliczeniowych. Eksperymenty te przeprowadzono na zbudowanych modelach zadań programowania całkowitoliczbowego.
PL
W artykule porównano dwie metody przeznaczone do budowy najkrótszych harmonogramów montażu. Dotyczą one linii montażowych z maszynami równoległymi, wyposażonymi w bufory między operacyjne o ograniczonych pojemnościach. Uwzględniono sztywne, a także alternatywne marszruty montażu. Metody przeznaczone są dla produktów wielowariantowych – każdy z produktów określonego typu może posiadać wyróżniające go cechy, uwzględniające wymagania odbiorców. W przypadku przedstawionej w artykule metody hierarchicznej najpierw dokonywany jest przydział operacji do maszyn, a następnie wyznaczane są czasy rozpoczęcia danych operacji. Zastosowano programowanie całkowitoliczbowe – poszczególnym poziomom metody przyporządkowano liniowe modele matematyczne zadań programowania całkowitoliczbowego. Zaprezentowaną w pracy metodę hierarchiczną porównano z metodą monolityczną, dzięki której operacje równocześnie rozdzielane są w przestrzeni i w czasie. W rezultacie zastosowaniu programowania całkowitoliczbowego metoda monolityczna umożliwia wyznaczanie optymalnych harmonogramów montażu. Przedstawiono wyniki eksperymentów obliczeniowych, których celem było porównanie obu koncepcji wyznaczania harmonogramu montażu.
EN
The monolithic and the hierarchical method are compared in the paper. They are intended to build as short assembly schedules as possible. The methods are constructed for assembly lines with parallel machines and with intermediate buffers. A fixed and an alternative assembly routes are regarded. The most important, distinctive feature of these methods, is that they are provided for multi-option products. Assembly of various products in different variants is the reply to the contemporary challenges faced by the manufacturers, who try to satisfy the demands of individual customers. The hierarchical method consists of two levels. The first level of the hierarchical method is connected with balancing machine workloads. The task scheduling is accomplished on the second level of the method. The mathematical models of integer programming tasks were built for its specific levels. The presented in the paper hierarchical method was compared with the monolithic method. The problems of balancing machine workloads and scheduling are solved simultaneously using the monolithic method. Using integer programming and the monolithic concept allowed to determine optimum solutions. The results of computational experiments with the proposed approaches for scheduling for assembly of multi-option products are presented.
EN
The monolithic method of no-wait scheduling is presented. The individual requirements of recipients of the electric devices are regarded. The method is for assembly lines with parallel machines, without intermediate buffers. The mathematical models of integer programming are constructed for this configuration of assembly lines – for no-wait scheduling. The results of computational experiments with the proposed method are presented – fixed and alternative assembly routes are compared, among others.
PL
Przedstawiono monolityczną metodę szeregowania operacji montażowych dotyczących sprzętu elektrycznego uwzgledniającego indywidualne wymagania odbiorców. Metodę zbudowano dla linii montażowych z maszynami równoległymi, bez buforów międzyoperacyjnych. Skonstruowane modele matematyczne zadań programowania całkowitoliczbowego, w których uwzględniono opisane konfiguracje linii montażowych, przeznaczone są do budowy harmonogramów montażu zgodnie z ideą szeregowania „bez czekania”. Zamieszczono wyniki eksperymentów obliczeniowych – porównano m.in. dwie różne organizacje przepływów produktów dotyczące sztywnych i alternatywnych marszrut montażu.
PL
Zaprezentowana metoda służy do budowy najkrótszych harmonogramów montażu produktów wielowariantowych. Uwzględniono specyficzne cechy montowanych produktów, wyróżniające te pro dukty (różne ich warianty), np. dodatkowe elementy (uchwyt), odmienność parametrów (sil ni ki o różnych mocach), czy inne właściwości określające wygląd produktu (kolor obudowy). Wyznaczane harmonogramy dotyczą hybrydowych systemów przepływowych, które stanowią linie montażowe z równoległymi stanowiskami montażowymi. Pomiędzy poszczególnymi stadia mi umieszczone są bufory międzyoperacyjne o ograniczonych pojemnościach, w których na wykonanie kolejnych operacji mogą oczekiwać montowane produkty. Przepływ wielowariantowych produktów odbywa się jednokierunkowo z uwzględnieniem sztywnych lub alternatywnych marszrut montażu. Zastosowano monolityczne, czyli jednopoziomowe podejście do budowy harmonogramu montażu. Równocześnie rozwiązywane jest zadanie rozdziału operacji montażowych pomiędzy ma szyny i rozdział tych operacji w czasie celem zbudowania jak najkrótszego harmonogramu montażu. Zbudowano liniowe modele matematyczne zadań programowania całkowitoliczbowego, przeznaczone do rozwiązywania tych zadań – w przypadku sztywnych lub alternatywnych marszrut montażu. Zastosowanie podejścia monolitycznego oraz programowania całkowito liczbowego gwarantuje wyznaczenie optymalnego harmonogramu. Zbudowana struktura danych i zmiennych oraz relacje matematyczne uwzględniają produkty wielowariantowe. Wyróżniono operacje podstawowe (jednakowe dla danego typu produktów) oraz dodatkowe (różnicujące produkty określonego typu). Struktura danych i zmiennych oraz ograniczeń dotyczących zbudowanych modeli matematycznych korzystnie wpływają na złożoność obliczeniową. Zaprezentowano wyniki eksperymentów obliczeniowych, których dokonano nie tylko w celu weryfikacji metody, ale również umożliwiły porównanie długości harmonogramów w przypadku sztywnych oraz alternatywnych marszrut.
EN
The presented method is used to construction of the shortest assembly schedules of multi-option products. The specific characteristics of assembled products are regarded, for example additional elements (e.g. a handle), different parameters (e.g. a power of the engine), and other properties that determine appearance of a product (e.g. a color of a casing). Schedules are constructed for hybrid flow shop systems. This systems consist of assembly lines with parallel assembly machines. The intermediate buffers with limited capacity are located between assembly stages. In these buffers products are waiting to perform the next assembly operations. The unidirectional flow of multi-option products is regarded – for a fixed or an alternative assembly routes. The monolithic (an one level) approach to construction of assembly schedule is used. The task of assignment of assembly operations to machines and task of scheduling are simultaneously solved. The shortest schedule is fixed. The mathematical models of integer programming are constructed. A fixed assembly routes and an alternative assembly routes are regarded in the mathematical models. The monolithic approach and the integer programming ensure the construction of an optimal schedule. The constructed structure of input parameters and variables and formulated mathematical relationships (constraints) regard multi-option products. There are basic operations (the same for the type of product) and additional operations (differentiating products of a specified type). The structure of input parameters and constraints, and structure of constraints formulated for mathematical models favourably affect the complexity of computing. The results of computational experiments with the proposed method are presented. These experiments have been carried out not only in order to verify the method, but also to make it possible to compare the length of schedules for the fixed and the alternative routes.
PL
Skonstruowane matematyczne modele zadań programowania całkowitoliczbowego dotyczą harmonogramowania montażu wielowariantowych produktów w liniach montażowych bez maszyn równoległych. Uwzględniono linie montażowe z buforami międzyoperacyjnymi, a także bez tych magazynów lokalnych, w przypadku których operacje szeregowane są „bez czekania”. Wzięto pod uwagę planowane przestoje maszyn – w tym celu opracowano procedurę oszacowania długości uszeregowania. Zamieszczone wyniki eksperymentów obliczeniowych pokazują wpływ konfiguracji linii montażowej oraz rodzaju marszrut montażu (sztywnych lub alternatywnych) na wyznaczane harmonogramy.
EN
The constructed mathematical models of integer programming apply to assembly scheduling of multi-option products for assembly lines without parallel machines. The assembly lines with intermediate buffers with limited capacity and the lines without buffers – for “no-waiting scheduling” are regarded. The planned downtime of machines are provided and that’s why the procedure of estimate of length of schedule is constructed. The results of computational experiments show the influence of the configuration of the assembly line and the kind of routes (a fixed or an alternative) on constructed schedules.
PL
Skonstruowane matematyczne modele zadań programowania całkowitoliczbowego dotyczą harmonogramowania montażu wielowariantowych produktów w liniach montażowych bez maszyn równoległych. Uwzględniono linie montażowe z buforami międzyoperacyjnymi, a także bez tych magazynów lokalnych, w przypadku których operacje szeregowane są „bez czekania”. Wzięto pod uwagę planowane przestoje maszyn – w tym celu opracowano procedurę oszacowania długości uszeregowania. Zamieszczone wyniki eksperymentów obliczeniowych pokazują wpływ konfiguracji linii montażowej oraz rodzaju marszrut montażu (sztywnych lub alternatywnych) na wyznaczane harmonogramy.
EN
The constructed mathematical models of integer programming apply to assembly scheduling of multi-option products for assembly lines without parallel machines. The assembly lines with intermediate buffers with limited capacity and the lines without buffers – for “no-waiting scheduling” are regarded. The planned downtime of machines are provided and that’s why the procedure of estimate of length of schedule is constructed. The results of computational experiments show the influence of the configuration of the assembly line and the kind of routes (a fixed or an alternative) on constructed schedules.
PL
We wprowadzeniu opisano wykorzystywane w montażu systemy przepływowe. Następnie przedstawio no metodę przeznaczoną do rozwiązywania zadań dotyczących planowania taktycznego (średnio- i krótkookresowego) dla elastycznych systemów montażowych. Do zadań tych należy planowanie zapotrzebowania na zasoby oraz optymalizacja obciążeń maszyn w celu wykonania zleceń produkcyjnych. Pierwsze z wymienionych zadań dotyczy rozdziału podajników części pomiędzy stadia jednokierunkowej linii montażowej z maszynami równoległymi, czyli hybrydowego systemu przepływowego. Drugie zadanie związane jest z równoważeniem obciążeń stadiów. Opisano parametry i zdefiniowano zmienne, służące rozwiązywaniu zadań planowania taktycznego. Opracowano procedurę przeznaczoną do oszacowania obciążenia stadium, stanowiącego wąskie gardło w systemie. W procedurze tej wzięto pod uwagę planowane przestoje maszyn montażowych, przeznaczone m.in. na remonty i konserwacje. Metoda charakteryzuje się również uwzględ nieniem losowych przestojów maszyn montażowych, np. awarii. W celu rozwiązywania problemów dotyczących planowania taktycznego, zbudowane zostały liniowe modele zadań programowania całkowitoliczbowego. Jeden z modeli matematycznych dotyczy sztywnych marszrut montażu, a drugi model zbudowano do wykorzystania w przypadku alternatywnych marszrut montażu. W funkcji celu, której wartość jest minimalizowana, uwzględniono dwa kryteria. Pierwsze z nich dotyczy równoważenia obciążeń stadiów. Drugie kryterium służy minimali zacji przepływów międzystadialnych. Rozwiązaniem opisanych w artykule zadań są przydziały operacji do stadiów. Wyznaczane jest również rozmieszczenie podajników części składowych montowanych pro duktów, wykorzystywanych do wykonywania tych operacji, w przypadku których części pobierane są z podajników. Zaprezentowano wyniki eksperymentów obliczeniowych, służących do weryfikacji metody i porównania rozwiązań, dotyczących różnych wag przy uwzględnieniu sztywnych lub alter natywnych marszrut montażu.
EN
A flow shop systems connected with assembly are described in the introduction. The method of tactical planning (mediumterm and short-term) for a flexible assembly systems is presented in the next chapters. Demand for planning resources and optimization of stage workloads are regarded tasks of tactical planning. The first of tasks is connected with allocation of part feeders among the stages (the stage is set of parallel machines) – for an unidirectional assembly line with parallel machines (a hybrid flow shop). The second of tasks is related to balancing stage workloads. A parameters and variables are defined for solving of tactical planning problems. A procedure was constructed to estimate the workload of stadium which is a bottleneck in the system. This procedure was taken into consideration planned downtime of assembly machines, among others for repairs and maintenance of the machines. The method is also characterized by taking into account the random downtime of machines, for example connected with failures. The mathematical models of integer programming are constructed for the solving of described tasks of tactical planning. The first model is formulated for a fixed assembly routes and the second model is used for an alternative assembly routes. Two criteria are regarded in an objective function. The first of these concerns the balancing stages workloads. The second criterion is the minimization of flows between stages. The solution of tasks described in article are assignments of assembly operations to stages. The part feeders are also assigned to the stages. The results of computational experiments with the proposed method are presented. The results obtained for the different criterion weights and for a fixed and for an alternative assembly routes are compared.
8
Content available remote Metoda harmonogramowania montażu dla systemów wytwarzania dokładnie na czas
EN
The monolithic method of assembly scheduling for multistage assembly systems is presented. The mathematical linear models with binary decision variables are constructed for the method. The cost criterion is used in the minimization function. The proposed models are used to a fixed assembly schedule with minimal differences between the operation time and the preferred producing term for all products. The models are constructed for two different assembly systems configurations: with intermediate buffers and without buffers (scheduling problem with blocking). The two types of flow are regarded: unidirectional and flow with return abilities. The schedule is divided into time intervals in the method. Results of computational experiments with proposed method are presented.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.