Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 2

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  Państwowe Muzeum Auschwitz-Birkenau
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
The conservation of brick barracks with historical numbers 7 and 8 (B-124 and B-123) was one of the key tasks carried out as part of the Master Plan for Preservation for the former Auschwitz-Birkenau Concentration Camp. The aim of the preliminary project completed in 2019 was to show whether and to what extent it was possible to fulfil the conservation objectives adopted in the MPP: minimum interference in the preserved substance, preserving it in a possibly intact form for decades to come, and at the same time making the buildings accessible to visitors, which had not been possible before due to their technical condition. All works in the BI sector, both completed and planned, are based on research results and methods developed over the course of a long-term, interdisciplinary research project. This article presents the most important results of research carried out at the Faculty of Architecture of the Cracow University of Technology and selected methods of protection and strengthening developed by the team for this vulnerable heritage.
PL
Konserwacja baraków murowanych o historycznych numerach 7 i 8 (B-124 i B-123) była jednym z kluczowych zadań realizowanych w ramach Globalnego Planu Konserwacji byłego obozu Birkenau. Celem zakończonego w roku 2019 projektu pilotażowego było sprawdzenie, czy i w jakim stopniu możliwe jest spełnienie przyjętych w GPK założeń konserwatorskich: minimalnej ingerencji w zachowaną substancję, jej zachowanie w możliwie nietkniętej formie na kolejne dziesięciolecia i równocześnie udostępnienie tych obiektów zwiedzającym, co wcześniej, ze względu na ich stan techniczny, nie było możliwe. Wszystkie działania w sektorze BI – zakończone, trwające i planowane – oparte są na wynikach badań i metodach opracowanych w ramach wieloletniego, interdyscyplinarnego projektu badawczego. Artykuł przedstawia najważniejsze wyniki badań realizowanych na Wydziale Architektury Politechniki Krakowskiej oraz wybrane metody zabezpieczenia i wzmocnienia opracowane przez zespół na potrzeby tego wrażliwego dziedzictwa.
EN
The results presented in this article consider the means of assessing the technical condition of two selected buildings, i.e. prisoner barracks number 123 and 124, located at the Auschwitz-Birkenau State Museum in Oświęcim. The work was carried out within the framework of a research project involving the development of methods for preserving, securing and strengthening the structure of buildings, along with their substrate and finishes. The aim of the project was to gain a knowledge base reflecting the actual state of the existing facilities and, on that basis, develop preservation methods and ways to protect the existing facilities against further damage, while maintaining the current character.
PL
Przedstawione w artykule wyniki badań dotyczą metody oceny stanu technicznego wybranych dwóch obiektów kubaturowych tj. baraków więźniarskich o numerach B-123 i B-124, które znajdują się na terenie Państwowego Muzeum Auschwitz-Birkenau w Oświęcimiu. Prace były prowadzone w ramach projektu badawczego obejmującego opracowanie metod konserwacji, zabezpieczenia i wzmocnienia konstrukcji obiektów oraz ich podłoża i elementów wykończenia. Celem projektu było pozyskanie bazy informacji odzwierciedlających rzeczywisty stan techniczny istniejących obiektów oraz opracowanie na ich podstawie metod konserwacji i sposobów zabezpieczenia przed dalszym degradacją pełnym zachowaniu cech odzwierciedlających charakter i pełnioną funkcję obiektu w obozie koncentracyjnym.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.