Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 2

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  Kłodawa salt dome
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
The possible occurrence of the Oldest Halite (Na1) unit of the Zechstein PZ1 cyclothem in the Kłodawa salt dome was a discussed matter for many years. Profiling and sampling of the evaporite Zechstein succession (a transition of PZ1 to PZ2 cyclothems) visible in a corridor of the "Kłodawa” Salt Mine at the mining level -650 m, located near the NE marginal pillar of the dome, were done in 2011. The studied section includes rock salt, shale, sulphate and carbonate rocks inclined at 60-90o to the NE and represents a normal succession of the PZ1 and PZ2 cyclothems. The normal succession of the top part of the PZ1 cyclothem consists of two lithological units: 1) rock salt complex (extending over a distance of ca. 5.8 m), defined as the Oldest Halite (Na1) lithostratigraphic unit, and 2) anhydrite bed, c.a. 1.3 m thick, distinguished as the Upper Anhydrite (A1g). These deposits are overlain by 4 lithological units, considered as those creating the normal sequence of the lower part of the younger PZ2 cyclothem. The first one is a dolomitic shale bed, ca. 3.7 m thick, defined as the Stink Shale (T2). It is overlain by a dolomite layer, 0.3-0.5 m thick, representing the Main Dolomite (Ca2), and by an anhydrite series, over 17 m thick, attributed to the Basal Anhydrite (A2). The studied section ends with a rock salt complex, ca. 4 m thick, interpreted as the Older Halite (Na2). The bromine (Br) content in both salt units is relatively low: 81-86 ppm (7 samples) in the Na1 unit and 54-77 ppm (4 samples) in the Na2 unit, with a distinct upward-increasing trend in the latter. Similar low Br values and their distribution trends were characteristic for the top of the Na1 standard bromine curve in Poland and for the lower part of such curve for the Na2 salts. This geochemical similarity could support a proper stratigraphic position of both units. The analysed section was interpreted as a tectonic slice or intrusion, composed of Na1 rock salt overlain with the younger A1g sulphate, incorporated within the folded complex of Na2 rock salt. Such image confirms the current opinion of a more complicated internal structure of the so-called "marginal anticlines” within the Kłodawa dome, composed of intensively folded both salt units. It also documents that the oldest Zechstein evaporites (chlorides and sulphates) could occur above within the dome section than was stated earlier.
EN
Located in central Poland, the Kłodawa salt dome is 26 km long and about 2 km wide. Exploitation of the dome started in 1956, currently rock salt extraction is carried out in 7 mining fields and the 12 mining levels at the depth from 322 to 625 meters below sea level (m.b.s.l.). It is planned to maintain the mining activity till 2052 and extend rock salt extraction to deeper levels. The dome is characterised by complex geological structure resulted from halokinetic and tectonic processes. Projection of the 3D numerical analysis took into account the following factors: mine working distribution within the Kłodawa mine (about 1000 rooms, 350 km of galleries), complex geological structure of the salt dome, complicated structure and geometry of mine workings and distinction in rocks mechanical properties e.g. rock salt and anhydrite. Analysis of past mine workings deformation and prediction of future rock mass behaviour was divided into four stages: building of the 3D model (state of mine workings in year 2014), model extension of the future mine workings planned for extraction in years 2015-2052, the 3D model calibration and stability analysis of all mine workings. The 3D numerical model of Kłodawa salt mine included extracted and planned mine workings in 7 mining fields and 14 mining levels (about 2000 mine workings). The dimensions of the model were 4200 m × 4700 m × 1200 m what was simulated by 33 million elements. The 3D model was calibrated on the grounds of convergence measurements and laboratory tests. Stability assessment of mine workings was based on analysis of the strength/stress ratio and vertical stress. The strength/stress ratio analysis enabled to indicate endangered area in mine workings and can be defined as the factor of safety. Mine workings in state close to collapse are indicated by the strength/stress ratio equals 1. Analysis of the vertical stress in mine workings produced the estimation of current state of stress in comparison to initial (pre-mining) conditions. The long-term deformation analysis of the Kłodawa salt mine for year 2014 revealed that stability conditions were fulfilled. Local disturbances indicated in the numerical analysis were connected with high chambers included in the mining field no 1 and complex geological structure in the vicinity of mine workings located in the mining fields no 2 and 3. Moreover, numerical simulations that projected the future extraction progress (till year 2052) showed positive performance. Local weakness zones in the mining field no 7 are associated with occurrence of carnallite layers and intensive mining which are planned in the mining field no 6 at the end of rock salt extraction.
PL
Wydobycie soli kamiennej w Kopalni Soli Kłodawa prowadzone jest obecnie w 7 polach eksploatacyjnych na 12 poziomach kopalniach (głębokość 322 - 625 m p.p.m.). Planowane przedłużenie eksploatacji do roku 2052, wiąże się z udostępnieniem zasobów na kolejnych (niższych) poziomach kopalnianych. Kopalnia Soli Kłodawa eksploatuje sól kamienną w wysadzie solnym, który charakteryzuje się skomplikowaną budową geologiczną. W modelu numerycznym Kopalni Soli Kłodawa odwzorowano przestrzenny układ wyrobisk kopalnianych (około 1000 komór i 350 km wyrobisk chodnikowych), złożoną geometrię wyrobisk, skomplikowaną budowę geologiczną wysadu oraz uwzględniono zróżnicowanie własności mechanicznych skał. Analizę numeryczną deformacji wyrobisk kopalnianych (dotychczas wybranych i planowanych do wybrania) podzielono na 4 etapy, które obejmowały: budowę modelu 3D kopalni (za bazowy przyjęto stan wyrobisk w roku 2014), rozszerzenie modelu o wyrobiska planowane do wykonania w latach 2015-2052, kalibrację modelu 3D, analizę stateczności. Model numeryczny 3D obejmował wycinek górotworu o wymiarach 4200 m × 4700 m × 1200 m. Model buduje około 33 miliony elementów. Kalibrację modelu wykonano na podstawie pomiarów konwergencji (prowadzonych w kopalni) oraz wyników testów laboratoryjnych skał budujących złoże. Ocenę stateczności wyrobisk kopalnianych przedstawiono na podstawie analizy stanu wytężenia oraz analizy stanu naprężenia w górotworze. Wyniki przeprowadzonej analizy numerycznej wykazały, że warunek stateczności wyrobisk Kopalni Soli Kłodawa jest spełniony dla stanu na rok 2014. Lokalnie występujące strefy wytężenia związane są z wysokimi komorami w polu eksploatacyjnym nr 1 oraz złożoną budową geologiczną w otoczeniu wyrobisk zlokalizowanych w polach eksploatacyjnych nr 2 i 3. Prognoza dla projektowanego stanu wyrobisk w roku 2052 (zakończenie eksploatacji) wykazała pozytywne rezultaty. Lokalne strefy osłabienia, które zidentyfikowano w polu eksploatacyjnym nr 7, związane są z występowaniem warstw karnalitu oraz intensywnymi pracami górniczymi, które w ostatniej fazie eksploatacji będą skoncentrowane w polu eksploatacyjnym nr 6.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.