Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników

Znaleziono wyników: 1

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
Wyszukiwano:
w słowach kluczowych:  Błądzikowski Stream
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
The main aim of this study was to determine the size of the load carried by the Błądzikowski Stream and discharged into the Puck Lagoon, and the role of the river load in the formation of the sea bed deposits at the stream mouth. The Błądzikowski Stream, with the length of only 10 km, discharges about 610 tons of sediment into the Puck Lagoon per year, including 89.8% (548 tons) of the bed load and 10.2% (62 tons) of the suspended load. The amount is 4.9% of the river load discharged into the Puck Lagoon. Mineral particles are more common in the composition of the river load and account for 94.6% of the suspended load and 98.7% of the bed load. It is mainly the bed load deposited in the estuarine area that creates a contemporary underwater accumulation form in the Puck Lagoon, which is corroborated by the granulometric composition of the channel and surface sediments; the suspended load is carried further into the Lagoon.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.