The article presents stability assessment of the mobile crane handling system based on the developed method with the use of the mathematical model built and the model built in the integrated CAD/CAE environment. The model proposed consists of the main crane assemblies coupled together: the truck with outrigger system and the base, the slewing column, the inner and outer arms, the six-member telescopic boom, the hook with lifting sling and the transported load. Analyses were conducted of the displacements of the mass centre of the crane system, reactions of the outrigger system, stabilizing and overturning torques that act on the crane as well as the safety indicator values for the given movement trajectories of the crane working elements.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.