The aim of the article is to analyze existing foreign experiences presented in the literature in the field of estimating demolition waste and their applicability in Poland condition. Using the case study method for more than a dozen objects, the authors prove the necessity to verify the suitability of the proposed models in relation to regional conditions (e.g. climatic conditions, local technologies, etc.). The amount of concrete waste from demolition of objects made in the analyzed technology is characterized by a low coefficient of variation, especially in the case of public facilities and is only 10%. However, in the case of residential buildings, the volatility was 16,7%. The calculated average index of concrete waste was compared with the two literature models. The results obtained differ from the values obtained from the models. Based on an analysis of the advantages and disadvantages of the selected models and their assumptions, a proposal has been formulated for the development of an effective tool for estimating demolition waste taking into account regional specific conditions together with the concept of sustainable construction. The focus was on waste from demolition of concrete objects.
PL
Prowadzenie efektywnej gospodarki odpadami ukierunkowanej na ich odzysk, jest realizacją współczesnej koncepcji zrównoważonego rozwoju. Podstawowym wymaganiem realizacji procesów odzysku odpadów jest ich selekcja. W przedsięwzięciach budowlanych prowadzenie prac rozbiórkowych w systemie dekonstrukcji z selekcją odpadów wiąże się z ponoszenie większych kosztów operacyjnych na etapie rozbiórki obiektu niżeli w przypadku klasycznego wyburzenia [8]. Selektywnie zebrane odpady dają jednak możliwość rekompensaty poniesionych kosztów na etapie gospodarowania nimi. Wartość surowców z odzysku jak i koszty utylizacji odpadów są zróżnicowane, stąd ważnym elementem przedsięwzięcia budowlanego polegającego na rozbiórce obiektu jest więc ocena ilościowa i jakościowa generowanych odpadów zgodnie z katalogiem odpadów [18]. W światowej literaturze przedmiotu można odnaleźć opracowane modele do szacowania ilości odpadów z rozbiórek obiektów i mają one dobre doświadczenia w tym względzie. Jednak, z uwagi na zmienne uwarunkowania klimatyczne, tradycje technologiczne, oraz przyjęte (krajowe) podejścia projektowe, możliwość zastosowania tych modeli w warunkach krajowych wymaga co najmniej ich weryfikacji. Celem artykułu jest analiza istniejących doświadczeń w zakresie szacowania odpadów. Skoncentrowano się na odpadach z rozbiórek obiektów betonowych. Stosując metodę „case study” dla kilkunastu obiektów, autorki w niniejszej publikacji dowodzą o braku możliwości bezkrytycznego zastosowania istniejących modeli szacowania odpadów do warunków krajowych.
Construction work on buildings covered by the revitalization program of historic urban development represents a special type of construction project in which, in the execution phase, difficult technical situations and other risk sources are being encountered. An important source of risk is the necessity to preserve a part of the historic substance, which results, among others, from the recommendations of the conservator, legal regulations or from the vision of the architect/investor. The risk is also associated with difficulties and complications in construction works resulting from the location of these objects in dense urban development. The aim of the article is to identify risk factors and reactions of contractors, i.e. applied risk management methods and techniques, based on the example of a complex of buildings constructed in the historic district of Krakow. The elimination of sources of risk, especially of a technical nature, requires the construction management to be highly skilled and experienced, to carefully prepare the construction work and to design additional solutions to ensure safety at work. The experience gained may serve as a basis for risk analysis and identification during the implementation of projects involving the use of an existing building and historic substance in areas subject to revitalization programs.
PL
Roboty budowlane na obiektach objętych programem rewitalizacji zabytkowej zabudowy miejskiej stanowią szczególny rodzaj przedsięwzięcia budowlanego, w którym w fazie wykonawstwa, występuje wiele trudnych sytuacji technicznych i innych uwarunkowań stanowiących źródła ryzyka. Istotnym źródłem ryzyka jest konieczność zachowania części substancji zabytkowej, która wynika m.in. z zaleceń konserwatora zabytków, z przepisów prawnych lub z wizji architekta/inwestora. Ryzyko niosą z sobą też utrudnienia i komplikacje w robotach budowlanych wynikające z lokalizacji tych obiektów w gęstej zabudowie miejskiej. Z tych względów, a także z powodu szczególnych uwarunkowań prawnych - zwłaszcza dotyczących obiektów zabytkowych i prac związanych z przygotowaniem robót remontowych (do momentu ich rozpoczęcia) wymagają one dużej staranności i znajomości przepisów oraz dobrego ich zaprojektowania i zaplanowania. Z uwagi na coraz szerszy zakres realizacji inwestycji budowlanych o różnym przeznaczeniu na terenach objętych programami rewitalizacji jest potrzebna wiedza oparta na doświadczeniach dotycząca identyfikacji źródeł i czynników ryzyka, która konieczna jest do realizacji przedsięwzięcia budowlanego z sukcesem. W artykule na przykładzie obserwacji realizacji kompleksu mieszkaniowego na terenie zabudowy byłej elektrowni w zabytkowej dzielnicy Krakowa - Kazimierzu przedstawiono wyniki z analizy i identyfikacji źródeł i czynników ryzyka tego przedsięwzięcia.
Przedstawiono matematyczny model programowania liniowego mieszanego problemu optymalizacji dostaw wyrobów budowlanych zużywanych w sposób nierównomierny. Pozwala on na analizę opłacalności stosowania wyrobów zamiennych, wyrobów wymagających wstępnego przygotowania lub obróbki przed wbudowaniem, oraz możliwych do gromadzenia w ilościach przekraczających bieżące zapotrzebowanie budowy, lecz z ograniczeniem pojemności składowisk. Model umożliwia minimalizację łącznych kosztów gospodarowania zapasami – zaplanowanie ekonomicznie uzasadnionej wielkości dostaw w kolejnych okresach realizacji budowy oraz dokonanie wyboru łańcuchów zaopatrzenia.
EN
Authors put forward a mixed linear programming model for optimizing supplies of construction material consumed in non-uniform way. The model enables the user to consider cost implications of material substitution and selecting suppliers that offer the material at varying level of pre-processing, as well as buying to stock with limited capacity of stacking areas. The model serves finding the economic order quantities in consecutive units of time and selecting supply chains.
4
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
Zastosowanie w praktyce budowlanej zasad zrównoważonego budownictwa jest objęte pracami badawczymi i ustawodawczymi, których efektem są normy i inne dokumenty stanowiące pomoc projektantom i inwestorom w ocenie wyrobów budowlanych i budynków w cyklu życia. Prezentowane w literaturze przedmiotu badania koncentrują się przede wszystkim na analizie oddziaływań środowiskowych w fazie wytwarzania wyrobów budowlanych. Tematyka artykułu dotyczy realizacji robót budowlanych w procesach remontowych na etapie eksploatacji budynków i przedstawia koncepcję ich analizy oraz oceny środowiskowo-ekonomicznej i socjalnej. Przedstawiono metodę oceny aspektu socjalnego z wykorzystaniem wskaźników ilościowych (ze względu na ograniczone dotychczas rozpoznanie naukowe tych zagadnień).
EN
The application of the principles of sustainable construction in practice is covered by research and legislative works, the effect of which are standards and other documents helping designers and investors in the assessment of construction products and buildings in the life cycle. The research, presented in the literature, focus primarily on the study of environmental impacts, in particular in the phase of manufacturing construction products. The subject of the paper concerns the implementation of construction works in renovation processes in the use stage and presents the concept of their analysis and environmental economic and social assessment. The paper presents the methodology for the evaluation the social aspect based on quantitative indicators (due to the limited scientific recognition of this area).
5
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
Social and economic development trends require that the economy be based on sustainable consumption and sustainable production patterns by means of implementing an effective recirculation policy – this is also important from an environmental perspective. Consequently, the design of economic processes becomes increasingly complex. This paper presents method and results of environmental life-cycle assessment of selected stages of the concrete recycling process. The results will be used in a further, holistic assessment of managing the concrete waste on the construction site.
PL
Społeczno-gospodarcze trendy rozwojowe, wymagają aby gospodarka oparta była na zrównoważonej konsumpcji oraz zrównoważonych wzorcach produkcyjnych, poprzez prowadzenie efektywnej gospodarki recyrkulacyjnej – również w wymiarze środowiskowym. Dlatego też, projektowanie procesów gospodarczych przyjmuje coraz to bardziej złożony charakter. Artykuł prezentuje metodę i wyniki oceny środowiskowej wybranych etapów procesu recyklingu betonu. Rezultaty posłużą do dalszej – holistycznej oceny wariantów gospodarowania odpadami betonowymi na budowie.
Celem opracowania jest charakterystyka rozwiązań konstrukcyjno-materiałowych przegród budowlanych (ścian i dachu) uwzględniająca założenia zrównoważonego rozwoju. Analizie poddano 3 technologie realizacji obiektów w tym 2 tradycyjne, wykorzystujące ceramiczne materiały budowlane i szkielet drewniany, oraz 1 nowatorską opartą na spienionym polistyrenie. Warianty oceniano wg 12 czynników charakteryzujących najważniejsze obszary zrównoważonego rozwoju. Zaobserwowany brak wyraźnej przewagi jednego z analizowanych rozwiązań konstrukcyjno-materiałowych nad pozostałymi pod względem omawianych czynników stanowił punkt wyjścia do analizy wielokryterialnej. Dokonano porównania rozwiązań metodami WAP, AHP oraz TOPSIS i poszukiwano technologii najlepiej spełniającej założenia analizy. W rezultacie przeprowadzonych badań stwierdzono dominację rozwiązania wykorzystującego szkielet drewniany potwierdzaną trzykrotnie (w każdej metodzie analizy wielokryterialnej). Wyniki umożliwiają porównanie technologii, pośrednio - wskazanie materiałów budowlanych spełniających założenia zrównoważonego rozwoju oraz określenie stopnia ich wdrożenia w nowo powstających technologiach.
EN
The aim of the study is to characterize the construction and material solutions of building partitions (walls and roof), which takes into account the sustainable development. The analysis includes 3 technologies - 2 traditional variants, used ceramic materials and timber frame and 1 innovative solution based on the expanded polystyrene. These solutions were assessed according to 12 factors, characterizing the most important areas of sustainable development. We observed no clear advantage of one of the analyzed construction-material solutions over the remaining in terms of these factors, what was the starting point for the multi-criteria analysis. A solutions comparison was made using WAP, AHP and TOPSIS methods and technology that best meets the analysis assumptions, was searched. As a result of the study, it was found the dominance of solution using timber frame, three times confirmed (in each method multi-criteria analysis). The results make it possible to compare the technologies, indirectly-indicate building materials, which meet the assumptions of sustainable development and determine degree of implementation of sustainable development in emerging technologies.
7
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
Wdrażanie innowacji w przedsiębiorstwie prowadzić może do poprawy jego kondycji finansowej, podniesienia pozycji rynkowej oraz wzrostu konkurencyjności. Innowacyjność przedsiębiorstwu zapewnić może każda zmiana, która coś ulepsza, daje nową jakość lub pozwala stworzyć nowy produkt lub usługę. Ważny jest wybór odpowiedniej innowacji, odpowiadającej potrzebom rynku. Wprowadzenie innowacji wymaga podejścia strategicznego we wdrożeniu i zarządzaniu zmianami. Polega ono na wnikliwej analizie otoczenia i przedsiębiorstwa z uwzględnieniem wyboru i wdrożenia zamierzonych innowacji. Wykorzystując ustaloną i sprawdzoną w praktyce metodykę, zaprojektowano strategię i plan strategiczny wprowadzenia innowacji produktowych w przykładowej wytwórni wyrobów budowlanych ze szkła. W artykule zaprezentowano wyniki analizy otoczenia i wytwórni (m.in. metodami: 5 sił Portera, SWOT/TOWS, BCG), na podstawie których zaproponowano program ogólny realizacji nowych celów, strategie szczegółowe, metody działania oraz określono niezbędne zasoby materialne i finansowe do wdrożenia zmian.
EN
Implementation of an innovation in a company can lead to the improvement in its financial condition, its market position and an increase in its competitiveness. Innovation can be provided by any change that improves something, gives a new quality, or allows the company to create a new product or service. The condition for the company’s development is the right choice of the type of innovation, based on the demand of the market. Introduction of innovations, that would ensure success, is associated with economic change in the company and requires a strategic approach in implementation and change management. It is based on a thorough analysis of the environment and the company, including the selection and implementation of the intended innovation. Using established and proven in practice methodology, to design the strategy and the strategic plan were designed to introduce product innovations in a sample glassware factory. The article presents the results of analysis of the environment and the factory (i.a. Porter’s 5 forces analysis, SWOT/TOWS, BCG). Based on this results were proposed: a general framework of realization of new goals, detailed strategies and methods of operating. Resources (including those financial) necessary in implementing changes were also laid down.
8
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
Analysis key success factors in type selection strategy for construction companies in Poland. Success in the construction industry is determined by the ability to develop and implement an aproppriate strategy. Due to the significant impact of construction on condition of the national economy, the comprehensive analysis of its situation and the development potential is justified. The aim of the research is identifying the type of strategy for the large construction companies in Poland. This article focuses on the key success factors, which are a starting point for comparing the current situation of the sector with the perfect conditions and performing strategic analysis. On the basis of literature and market observation, a list of 44 KSF grouped in 9 categories, was developed.
Sukces przedsiębiorstw budowlanych uwarunkowany jest umiejętnością opracowania i wdrożenia właściwych działań strategicznych. Ze względu na istotny wpływ budownictwa na stan krajowej gospodarki kompleksowa analiza jego sytuacji i potencjału rozwojowego jest uzasadniona. Celem badań jest wskazanie typu strategii dla sektora dużych przedsiębiorstw budowlanych w Polsce. Artykuł koncentruje się na kluczowych czynnikach sukcesu, będących punktem wyjścia do porównania obecnej sytuacji sektora ze stanem idealnym oraz przeprowadzenia analizy strategicznej.
EN
Success in the construction industry is determined by the ability to develop and implement an aproppriate strategy. Due to the significant impact of construction on condition of the national economy, the comprehensive analysis of its situation and the development potential is justified. The aim of the research is identifying the type of strategy for the large construction companies in Poland. This article focuses on the key success factors, which are a starting point for comparing the current situation of the sector with the perfect conditions and performing strategic analysis. On the basis of literature and market observation, a list of 44 KSF grouped in 9 categories, was developed.
10
Dostęp do pełnego tekstu na zewnętrznej witrynie WWW
W artykule omówiono logistykę odzysku wyrobów i surowców budowlanych podczas robót remontowych i rozbiórkowych obiektów. Szczegółowe aspekty ekonomiczne i organizacyjne występujące w obsłudze logistycznej takich przedsięwzięć zostały zaprezentowane na przykładzie kapitalnego remontu jednego z domów studenckich AGH w Krakowie. Analiza zastosowanych sposobów utylizacji odpadów (materiałów) z rozbiórki pozwoliła na ich ocenę i wykorzystanie doświadczeń tego przedsięwzięcia w zarządzaniu logistyką odzysku w budownictwie.
EN
The main object of the paper is presentation issues associated to reverse logistics of products and raw materials, which are generated during renovation and demolition works. Detailed analysis was performed in relation to costs and organization aspects of reverse folw, on the example of the renovation a dormitory of AGH in Krakow. Analysis of applied methods of waste management on construction site, allow for assesment the adopted solutions. Conclusions provides contribution to the experience of waste management on construction site.
Gospodarowanie odpadami stało się obowiązkiem inżynierów budów, a koszty z tym związane składową – kosztów inwestycji.
EN
Construction waste management is a complex process, the main tasks in this area include: planning and design, waste collection, storage, transport, recovery process or transfer for disposal. The aim of this article is to identify the key aspects of the construction waste management due to the costs. An extensive part of the study are examples of the implementation of reverse logistics within the construction site – which allows to reduce costs. Research has indicated significant differences in prices for disposal services, which may also be crucial from the point of view of cost- effective management of construction waste.
Rozbiórka może stanowić samodzielne przedsięwzięcie budowlane lub jego etap początkowy. Jak każde przedsięwzięcie składa się z wielu etapów – w tym zaplanowania i przygotowania robót rozbiórkowych. W artykule przeprowadzono analizę działań w fazie przygotowawczej rozbiórki, bazując na wymaganiach aktów prawnych, w tym Prawa budowlanego.
EN
Demolition can be a stand-alone construction project or its initial phase. As ach project consists of several stages, including the planning and preparation of demolition. In the paper the analysis of activities in the preparatory phase of the demolition, based on the requirements of legal acts, including the Construction Law.
Wprowadzenie nowej technologii produkcji w tym wypadku wykonywania obiektów budowlanych nie jest tylko zmianą metody budowania obiektu, ale także niesie zmiany w organizacji pracy na placu budowy oraz zarządzaniu całym procesem inwestycyjno-budowlanym, we wszystkich obszarach funkcjonowania wszystkich uczestników biorących udział w realizacji tj. fazie przygotowawczej, wykonania robót budowlanych i oddaniu do eksploatacji obiektu. W artykule przeanalizowano wpływ zastosowania technologii druku przestrzennego na zarządzanie logistyką przedsięwzięcia budowlanego we wszystkich jego etapach. Dzięki wykorzystaniu w technologii druku przestrzennego robotyzacji procesów produkcyjnych zmniejsza się zakres procesów pomocniczych, w tym logistycznych, które towarzyszą zwykle zasadniczym procesom budowlanym. Redukcja procesów logistycznych stanowi źródło dużych oszczędności czasu i kosztów przedsięwzięcia budowlanego.
EN
Introduction of new technology in production of making construction objects is not only a change of method. This new technology has an influence on many areas at construction yard. It is changing work organization, preplanning of construction and final stage when built object is waiting for approval to use. Paper is presenting analysis of the influence that 3D printing technology has on construction yard logistic on every stage. Usage of that technology, automation of production processes by robots is decreasing scope of construction processes. Including logistic, which is base process of every construction. That process is reducing all costs and is saving time.
Cricoteka, mimo wielu trudności podczas jej realizacji, stanowi dziś jeden z ciekawszych punktów do zwiedzania. Jej rozmach pokazuje, że należy szukać innowacyjnych i ciekawych rozwiązań, a często to, co wydaje się niemożliwe do wykonania, w późniejszym czasie staje się realne i osiągalne.
EN
As a result of the revitalization of the old buildings of the former power plant area of Krakow Podgórze a multifunctional object providing city with a cultural institution called Cricoteka – Cantor Arts Documentation Center is being created. The paper presents the genesis of the construction of the Centre and the description of the project with a very interesting design solutions and material. Observation of the investment shows what problems occurred during the building of investments realized in terms of increased risk and uncertainty of the project undertaken. The collected material was allowed to analyze the source of the delays and costs of investments financed with public funds. The authors suggest the desirability of the use of methods that take into account the risks arising on such investments, financed from public funds and risk management.
W wyniku rewitalizacji starych zabudowań byłej elektrowni dzielnicy Krakowa Podgórze powstał obiekt zapewniający miastu wielofunkcyjną instytucję kultury zwaną Ośrodkiem Dokumentacji Sztuki Tadeusza Kantora Cricoteka. Artykuł przedstawia genezę budowy ośrodka i opis projektu z bardzo interesującymi rozwiązaniami konstrukcyjnymi i materiałowymi.
EN
As a result of the revitalization of the old buildings of the former power plant area of Krakow Podgórze a multifunctional object providing city with a cultural institution called Cricoteka – Cantor Arts Documentation Center is being created. The paper presents the genesis of the construction of the Centre and the description of the project with a very interesting design solutions and material. Observation of the investment shows what problems occurred during the building of investments realized in terms of increased risk and uncertainty of the project undertaken. The collected material was allowed to analyze the source of the delays and costs of investments financed with public funds. The authors suggest the desirability of the use of methods that take into account the risks arising on such investments, financed from public funds and risk management.
Druk przestrzenny jest rozwijającą się technologią, wykorzystaną w wielu sektorach gospodarki, takich jak przemysł lotniczy i motoryzacyjny, oraz innych dziedzinach, np. medycyna, moda, sztuka użytkowa. Pojawiają się próby zastosowania tej technologii także w budownictwie. W artykule zawarty jest opis rozwoju druku przestrzennego i krótka charakterystyka wybranych metod, tj. stereolitografii (SLA/SL), selektywnego spiekania laserowego (SLS), osadzania topionego materiału (FDM) oraz druku 3D (3DP). Przedstawiono także przykłady drukowania obiektów budowlanych. Dotychczasowe doświadczenia w tym zakresie posłużyły do przeanalizowania możliwości druku przestrzennego w szerszym zastosowaniu do budownictwa. Technologia ta niesie za sobą duży potencjał automatyzacji i robotyzacji pracochłonnych robót budowlanych.
EN
The three-dimensional printing technology is evolving and it is using in a variety of sectors, such as aerospace and automotive, and other branch, for example: medicine, fashion, art. The scientists are trying to apply this technology in to the construction industry. The paper is describing the development of three-dimensional printing and contains brief description of methods like: Stereolithography (SLA/SL), Selective Laser Sintering (SLS), Fused Deposition Modeling (FDM) and 3D Printing (3DP). This paper is describing examples from the world, where three-dimensional printing technology is used to print the buildings. Based experience in this area was used to analyze the capabilities of three-dimensional printing in wide use for building industry. This technology has a great potential for automation and robotics labor-intensive works on construction site.
Druk przestrzenny jest rozwijającą się technologią, wykorzystaną w wielu sektorach gospodarki, takich jak przemysł lotniczy i motoryzacyjny, oraz innych dziedzinach, np. medycyna, moda, sztuka użytkowa. Pojawiają się próby zastosowania tej technologii także w budownictwie. W artykule zawarty jest opis rozwoju druku przestrzennego i krótka charakterystyka wybranych metod, tj. stereolitografii (SLA/SL), selektywnego spiekania laserowego (SLS), osadzania topionego materiału (FDM) oraz druku 3D (3DP). Przedstawiono także przykłady drukowania obiektów budowlanych. Dotychczasowe doświadczenia w tym zakresie posłużyły do przeanalizowania możliwości druku przestrzennego w szerszym zastosowaniu do budownictwa. Technologia ta niesie za sobą duży potencjał automatyzacji i robotyzacji pracochłonnych robót budowlanych.
EN
The three-dimensional printing technology is evolving and it is using in a variety of sectors, such as aerospace and automotive, and other branch, for example: medicine, fashion, art. The scientists are trying to apply this technology in to the construction industry. The paper is describing the development of three-dimensional printing and contains brief description of methods like: Stereolithography (SLA/SL), Selective Laser Sintering (SLS), Fused Deposition Modeling (FDM) and 3D Printing (3DP). This paper is describing examples from the world, where three-dimensional printing technology is used to print the buildings. Based experience in this area was used to analyze the capabilities of three-dimensional printing in wide use for building industry. This technology has a great potential for automation and robotics labor-intensive works on construction site.
In Poland, it often happens that construction objects are subject to demolition work for different reasons. Demolition, according the Construction Law, is defined as a type of construction works and, as such, represents a particular type of construction project. As in other construction projects, a very important phase, in addition to execution of the works, is to prepare, design and plan demolition works. Some demolition activities are covered by appropriate regulations and can be described as typical. On the other hand the technical side of demolition works depends on many factors such as: the type of building, its age, technical condition, type of construction, etc. This article covers the analysis of the stages and tasks in the preparatory phase of the building demolition. This work will also present a description of the tasks carried out during the demolition works based on the example of a historic tenement house located in Krakow. This analysis aims to identify implementation problems and sources of risk that may occur during this type of construction work.
PL
Coraz częściej w Polsce obiekty budowlane z powodów złego stanu technicznego, funkcjonalnego, ekonomicznego, itp. są likwidowane - rozbierane. Rozbiórka w Prawie budowlanym zdefiniowana jest jako typ robót budowlanych i jako taki stanowi szczególny rodzaj przedsięwzięcia budowlanego. Podobnie jak w innych przedsięwzięciach bardzo ważną fazą jest przygotowanie, zaprojektowanie i zaplanowanie robót rozbiórkowych. Niektóre działania w zakresie rozbiórek objęte są właściwymi przepisami i można je określić, jako typowe. Natomiast techniczna strona robót rozbiórkowych zależy od wielu czynników takich jak: rodzaj budynku, konstrukcji, wiek, stan techniczny, funkcjonalny, technologia wykonania, lokalizacja itd. Artykuł obejmuje analizę etapów i zadań w fazie przygotowawczej rozbiórki obiektu budowlanego. Natomiast problemy natury technicznej robót rozbiórkowych przedstawiono na przykładzie zabytkowej kamienicy znajdującej się na terenie Krakowa. Analiza procesu przygotowania i wykonania rozbiórki obiektu ma na celu wskazanie problemów realizacyjnych oraz źródeł ryzyka, jakie mogą wystąpić podczas tego rodzaju prac budowlanych. Praktyka wskazuje, że faza przygotowawcza przedsięwzięcia, jakim jest likwidacja obiektu, tak jak przy nowo budowanych obiektach, jest zwykle dłuższa niż pozostałe fazy. Etapy składające się na tę fazę i zadania, jakie należy wykonać przed przystąpieniem do robót rozbiórkowych, zostały uporządkowane i przedstawione w postaci schematu blokowego przedstawionego na Rys.1. szarością oznaczono etapy dotyczące rozbiórki analizowanego w artykule obiektu.
Roboty ziemne w przedsięwzięciach budowlanych występują jako podstawowe roboty lub składowy element przedsięwzięcia niezbędny podczas wykonywania obiektu budowlanego. Mogą stanowić w znaczącym stopniu o czasie i kosztach jego wykonania. Celem artykułu jest analiza stanu aktualnego realizacji robót ziemnych i jego ocena w aspekcie korzyści przedsiębiorstwa budowlanego podejmującego się takich robót, na podstawie wykonanych badań kwestionariuszowych.
EN
Earthworks in construction projects are a basic work or component part of the project necessary during the work. They can provide a significant degree of time and cost of its implementation. The purpose of this article is an analysis of the current state of implementation of the earthworks and its evaluation in terms of the the company undertaking the construction of such works benefits on the basis of a questionnaire study.
Powodzenie kontraktu wymaga dotrzymania przez wykonawców terminu i kosztu realizacji inwestycji budowlanej. Jednym ze sposobów redukcji kosztów i czasu w przypadku ich przekroczenia jest zastosowanie substytucji rozwiązań konstrukcyjno-materiałowych ustrojów lub elementów budowlanych. Takie zmiany w robotach budowlanych pociągają za sobą zmiany w logistyce zaopatrzenia w potrzebne substytucyjne zasoby tj. wyroby budowlane, zespoły pracowników i maszyn budowlanych. Dostarczenie ich wiąże się ze zmianą struktury i zasad funkcjonowania łańcuchów dostaw. Występuje też możliwość wariantowych rozwiązań. W artykule przedstawiono przykład wyboru rozwiązania substytucyjnego dotyczącego wykonania elewacji budynku, przyjmując do oceny kryteria uwzględniające czynniki technologiczne i logistyczne. Przedstawiony przykład ilustruje związek i wzajemny wpływ substytucji rozwiązań technologicznych i logistyki zaopatrzenia budowy.
EN
The success of a construction contract requires that the contractor meets the deadlines and keeps costs within predefined limit. To reduce cost and duration of works, contractors often resort to material or component substitution. If such decisions are taken as the project are in progresses, the project’s supply logistics needs to be adjusted – and the supply chains for material, labor and plant change their structure. As substitution is considered, one often compares a number of options. The paper presents a case of substitution decision problem regarding wall cladding. The selection criteria involve construction methods and logistics related with considered options. The example illustrates the relationship and mutual influence of substitution construction method and supply logistics of construction site.