The process and results of stand tests on the powered support manufactured in 1996 are discussed. The tests were conducted at the KOMAG’s accredited testing laboratory, implementing an author’s testing program. After completion of the static strength, load bearing capacity and fatigue strength tests, the roof support was inspected and no mechanical damage to the basic components of the tested roof support was found. The recorded permanent deformations of the basic components of the roof support tested in 2020 were compared with the results of tests of the same roof support, conducted in 1996 (prototype tests) and 2009 (tests after modernisation), also at the KOMAG laboratory. Based on the results of tests conducted in 2020, it was shown that the current properties of the roof support meet the normative requirements. Therefore, the customer may decide to continue using them in other longwall panels.
PL
Omówiono przebieg i wyniki badań stanowiskowych sekcji obudowy zmechanizowanej wyprodukowanej 1996r. Badania wykonano w akredytowanym laboratorium badawczym ITG KOMAG, realizując autorski program badawczy. Po zakończeniu badań wytrzymałości statycznej, podporności i wytrzymałości zmęczeniowej, przeprowadzono oględziny sekcji i nie stwierdzono uszkodzeń mechanicznych elementów podstawowych badanej sekcji. Zarejestrowane odkształcenia trwałe elementów podstawowych sekcji badanej w 2020 r. porównano z wynikami badań tej samej sekcji, wykonanych w 1996 r. (badania prototypu) oraz 2009 r. (badanie po modernizacji), również w laboratorium ITG KOMAG. Na podstawie wyników badań wykonanych w 2020 r. wykazano, że aktualne właściwości funkcjonalne sekcji spełniają wymagania normatywne. Zleceniodawca może więc podjąć decyzję o dalszym użytkowaniu w kolejnych ścianach.
EN
The concept of a device for withdrawal of a powered roof support during the liquidation of a longwall panel is presented. This device is a part of the system developed by KOMAG for the withdrawal of a roof support from a row and its transportation in the liquidated longwall. The suggested solution significantly improves efficiency and safety of this process. The basic parameters of the device, a description of the design and principle of operation are presented. Strength properties of its basic components were estimated, taking into account the way the device operated during the withdrawal of the roof support. The paper describes the problems faced by engineers when designing the non-standard mining device, which is the UWZ-1device. The advantages of the discussed device are also presented.
PL
W publikacji przedstawiono koncepcję urządzenia do wybudowy sekcji obudowy zmechanizowanej w procesie likwidacji ściany wydobywczej. Urządzenie to jest elementem opracowanego w ITG KOMAG systemu do wybudowy sekcji z szeregu i jej transportu w likwidowanej ścianie. Zaproponowane rozwiązanie poprawia w zdecydowany sposób efektywność i bezpieczeństwo tego procesu. Przedstawiono podstawowe założenia urządzenia, opis konstrukcji oraz zasadę działania. Oszacowano właściwości wytrzymałościowe jego podstawowych elementów uwzględniając sposób pracy urządzenia w czasie wybudowy sekcji. W publikacji opisano problemy z jakimi spotykają się inżynierowie przy projektowaniu konstrukcji nietypowego urządzenia górniczego jakim jest urządzenie UWZ-1. Przedstawiono także zalety jakie posiada przedmiotowe urządzenie.