Based on the results of tests of the monorail transport system using suspended diesel locomotives with traditional transport beams and with the use of an innovative system of transport beams for the delivery of heavy loads, it was found that to reduce the dynamics of the load to the elements of the suspended route segments fastened to the arches of the arch support, it is beneficial to use the proposed an innovative technical solution that increases the reliability of the route catches to the support arches, which is important when transporting heavy loads. The new solution significantly reduces the dynamic loads to the route catches to the support arches by redistributing the load over a greater number of sections of the suspended monorail route. It has been proven that during the period of intensification of preparatory work, these technical solutions make it possible to keep to the timely preparation of new mining pillars and are perceived as a promising direction for improving the existing transport system for the mines of the region and ensuring the operational parameters of mining transport equipment at a high technical level in the specific conditions of the mines of Western Donbass.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.