Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Powiadomienia systemowe
  • Sesja wygasła!

Znaleziono wyników: 4

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
Laboratories and test houses keep a “pool” of test subjects that volunteer to be participants in life jacket approval testing, which is believed to be an incorrect procedure. Fifty-six participants donned 8 child/infant life jackets onto 4 infant manikins in random order with time and accuracy of donning recorded. Average donning time for all 8 life jackets decreased significantly after the first donning experience. The findings show that the effect of familiarity occurs immediately after the first test, regardless of life jacket type, thus “contaminating” the subject and making them unsuitable for further tests. These observations are important for life jacket standards where the life jacket must be donned by a naïve participant. Currently, a poorly designed life jacket may receive a pass as a result of the learning effect as shown by participants with previous donning experiences.
EN
Accurate, detailed, and up-to-date 3D building models are important for several applications such as telecommunication network planning, urban planning, and military simulation. Existing building reconstruction approaches can be classified according to the data sources they use (i.e., single versus multi-sensor approaches), the processing strategy (i.e., data-driven, model-driven, or hybrid), or the amount of user interaction (i.e., manual, semiautomatic, or fully automated). While it is obvious that 3D building models are important components for many applications, they still lack the economical and automatic techniques for their generation while taking advantage of the available multi-sensory data and combining processing strategies. In this research, an automatic methodology for building modelling by integrating multiple images and LiDAR data is proposed. The objective of this research work is to establish a framework for automatic building generation by integrating datadriven and model-driven approaches while combining the advantages of image and LiDAR datasets
EN
Mobile Mapping Systems (MMS) can be defined as moving platforms which integrates a set of imaging sensors and a position and orientation system (POS) for the collection of geo spatial information. In order to fully explore the potential accuracy of such systems and guarantee accurate multi-sensor integration, a careful system calibration must be carried out. System calibration involves individual sensor calibration as well as the estimation of the inter-sensor geometric relationship. This paper tackles a specific component of the system calibration process of a multi-camera MMS – the estimation of the relative orientation parameters among the cameras, i.e., the inter-camera geometric relationship (lever-arm offsets and boresight angles among the cameras). For that purpose, a novel single step procedure, which is easy to implement and not computationally intensive, will be introduced. The proposed method is implemented in such a way that it can also be used for the estimation of the mounting parameters among the cameras and the IMU body frame, in case of directly georeferenced systems. The performance of the proposed method is evaluated through experimental results using simulated data. A comparative analysis between the proposed single-step and the two-step, which makes use of the traditional bundle adjustment procedure, is demonstrated.
EN
This paper addresses the improvements to the reliability of the safety systems of nuclear reactors using redundancy allocation technique. The study has been carried out using the Probabilistic Safety Assessment (PSA). PSA involves, among others, the use of fault and event tree tools in the evaluation of the safety system failure probabilities and the quantification of annual occurrence probability of the accidental conditions postulated in the design of the nuclear reactors. The PSA has been presented and discussed. The Egypt Second Research Reactor, ETRR-2, has been used as a case study. The failure probability of the already existing safety systems has been reviewed. The effect of the allocation of more redundant components to the existing safety systems on the failure probability of the systems has been evaluated. The event trees for two selected initiating events, from those events postulated in the ETRR-2 design, have been studied considering the allocation of more redundant components to the safety systems. The result of the study showed that further improvement could be introduced to the reliability of the Confinement Ventilation System (CVS).
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.