Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Powiadomienia systemowe
  • Sesja wygasła!

Znaleziono wyników: 1

Liczba wyników na stronie
first rewind previous Strona / 1 next fast forward last
Wyniki wyszukiwania
help Sortuj według:

help Ogranicz wyniki do:
first rewind previous Strona / 1 next fast forward last
EN
Palm oil mills discharge raw effluent with high biochemical oxygen demand (BOD) of about 25 000 mg O2/dm3 . Conventional effluent treatment system uses ponds with a long hydraulic retention time of about 55–85 days, but the reduction of BOD is usually halted at 100–250 mg O2/dm 3. Further reduction of BOD to below 20 mg O2/dm3 to meet regulation requirement needs further advanced treatment. This study evaluates the efficiency of an effluent polishing plant installed at a palm oil mill targeting final effluent BOD below 20 mg O2/dm3. Characteristic of the incoming and treated effluent, dissolved oxygen in the aeration ponds and the effluent flow rate of the treatment plant have been determined. Due to low process throughput at the mill, the polishing plant operated at only 60% of its designed capacity. Treatment of effluent showed reduction of BOD from 39.3±5.8 to 6.1±3.8 mg O2/dm3, i.e., a reduction by 80–94%. Colour – a newly proposed regulation parameter – was reduced from 1081±69 to 845±60 ADMI, i.e., by 11–30%. This study indicates that while the treatment of effluent to reduce the BOD to below 20 O2/dm3 O2/dm3 is feasible, reduction of colour to less than 100 ADMI is not achievable.
first rewind previous Strona / 1 next fast forward last
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.