W artykule zaproponowano systemowe podejście do wstępnej analizy przyczyn złego stanu technicznego drewnianego obiektu zabytykowego, z wykorzystaniem metody WINGS (Weighted Influence Nonlinear Gauge System). Potencjał aplikacyjny zaproponowanego podejścia przedstawiono na przykładzie drewnianego kościoła pw. św. Jana Chrzciciela w Warszawicach, ujętego w rejestrze zabytków województwa mazowieckiego.
EN
The article proposes a systemic approach to the initial analysis of the causes of the poor technical condition of a wooden historic building using the WINGS method (Weighted Influence Nonlinear Gauge System). The application potential of the proposed approach was presented on the example of a wooden church. Saint John the Baptist in Warszawice, included in the register of monuments of the Masovian Voivodeship.
W artykule zwrócono uwagę na ważny aspekt, jakim jest modelowanie i analiza strukturalna problemów w procesie decyzyjnym. Zaprezentowane podejście systemowe na tle klasycznych wielokryterialnych metod wspomagania decyzji pozwala uwzględnić różne współzależne zewnętrzne i wewnętrzne relacje między kryteriami i wariantami decyzyjnymi, co jest istotne z perspektywy modelowanej rzeczywistości. Przedstawiono podstawowe metody modelowania i analizy struklturalnej, a całość rozważań została poparta wybranymi przykładami problemów decyzyjnych w budownictwie.
EN
This paper notes the important aspect of the modeling and structural analysis of problems in decision making. Against classical multi-criteria decision-making support methods, the presented approach considers different co-dependent external and internal relations between criteria and decision alternatives, which is significant from the standpoint of the reality we aim to model. Essential structural modeling and analysis methods were presented, and the entire discussion was backed by samples of decision problems from the construction sector.
This paper investigates the fact that construction projects, due to their specificity, are complex, temporary and dynamic. Over their course, participants change, successive construction works are done and new information becomes available. This carries over to difficulties in communication. In the literature, numerous studies note the fact that a network-based approach to the analysis and monitoring of communication as a part of complex construction projects is commendable. Relations between agents, knowledge and tasks in the context of communication within a construction project can be visualized in the form of a meta-network, and suitably developed structural measures can be used to analyze them. In this paper, the authors used meta-network theory to analyze relations between project participants, knowledge and tasks in the context of communication within a construction project, on the basis of the construction of a housing estate located in Katowice, Poland. Meta-network structural analysis allowed for a deeper understanding of these relations and the detection of essential information about the level of communication in the project under investigation, which was a basis for further discussion. The authors also stress the benefits from the approach presented and argue that it should be a starting point for effective management in the sphere of communication in construction companies.
PL
W artykule zwrócono uwagę na fakt, że przedsięwzięcie budowlane ze względu na swój charakter jest złożone, tymczasowe i dynamiczne. Rozwój przemysłu budowlanego sprawił, iż zwiększyła się świadomość potrzeby lepszego zarządzania przedsięwzięciami w przemyśle budowlanym. W licznych publikacjach wskazano na utrudnienia i wyzwania w zarządzaniu przedsięwzięciami budowlanymi. Zarządzanie przedsięwzięciami budowlanymi w tradycyjnym podejściu skupia się w pierwszej kolejności na planowaniu zadań wraz z przydziałem do nich zasobów odnawialnych (ludzie, sprzęt) i nieodnawialnych (materiały). W czasie trwania realizacji przedsięwzięcia uwaga skoncentrowana jest na organizowaniu i przydziale zasobów do zadań i monitorowaniu ich realizacji wraz z kontrolą ich odchyleń od planu i budżetu a także ewentualnymi działaniami korygującymi. Stosowane przy tym różne techniki zarządzania nie uwzględniają w analizie relacji między uczestnikami przedsięwzięcia budowlanego, a realizowanymi przez nich zadaniami i posiadaną wiedzą. Zauważyć należy, iż takie interakcje między ludźmi, organizacjami, zadaniami są podstawą złożonego systemu komunikacji w przedsięwzięciach budowlanych. Przekłada się to jednocześnie na utrudnioną komunikacje. W literaturze zwraca się uwagę na fakt, że podejście sieciowe do analizy i monitorowania komunikacji w ramach złożonych przedsięwzięć budowlanych jest odpowiednie.
Communication and information flow during construction project execution is often discussed in the literature. Numerous scholars note the presence of problems with communication and information flow and highlight that these problems also affect construction project completion time and cost. The vast majority of studies on the impact of communication on construction project completion time and cost takes on a qualitative character and there is a lack of quantitative analyses of this subject. To address these deficiencies, the authors of this paper propose a quantitative approach to assessing communication between construction project participants in the aspect of its impact on said project’s completion time and cost. The authors used meta-network theory to model and analyse the problem, as it can fully depict the problem’s complexity. The method proposed allows for dynamic identification of key information flow paths between project participants, which determine its performance in an essential way. The proposed approach can support decision-makers in effective management of communication between a construction project’s participants, which has a positive carryover to achieving planned project goals. The method was tested on a real-world development project that featured the construction of a housing complex in Katowice, Poland.
PL
Celem artykułu jest przedstawienie opracowanego autorskiego algorytmu postępowania pozwalającego wyznaczyć wpływ braku komunikacji na czas i koszt przedsięwzięcia budowlanego. W celu uzyskania informacji jakie zadania w harmonogramie robót nie mogą zostać zrealizowane ze względu na brak komunikacji i przepływu informacji pomiędzy uczestnikami przedsięwziecia budowlanego, i jakie będą tego skutki w kontekście czasu i kosztu przedsięwzięcia dokonano analizy wpływu usunięcia kolejnych łączy pomiędzy poszczególnymi uczestnikami w wyznaczonej optymalnej sieci komunikacji. Model został przedstawiony na przykładzie rzeczywistej realizacji osiedla mieszkaniowego. W wyniku przeprowadzonej analizy, pokazano ze występowanie problemów z komunikacją i przepływem informacji w sieci uczestników fazy realizacji przedsięwzięcia budowlanego wpływa na czas i koszty ich realizacji. Istotne jest więc wskazywanie przez zarządzającego przedsięwzieciem ścieżek optymalnej komunikacji pomiędzy uczestnikami w danym okresie z kompleksowym uwzględnieniem posiadanej przez uczestników wiedzy i realizowanych zadań wraz z ilościowym podejściem do oceny komunikacji pomiędzy uczestnikami przedsięwzięcia budowlanego w aspekcie jej wpływu na czas i koszt jego realizacji oraz monitorowanie sieci komunikacji przez cały cykl realizacji tego przedsięwzięcia. Wykorzystana przez autorów do modelowania i analizy problemu teoria metasieci pozwoliła na uchwycenie złożoności tego zagadnienia. Zaproponowana metoda umożliwia dynamiczną identyfikację kluczowych ścieżek przepływu informacji pomiędzy uczestnikami przedsięwzięcia, które w istotny sposób determinują jego wydajność. Efekty analizy potwierdziły potencjał aplikacyjny przedstawionej metody. Opracowany model optymalizacyjny wraz z modułem analizy wpływu komunikacji pomiędzy uczestnikami na czas i koszt realizacji przedsięwzięcia budowlanego, może wspomagać decydenta w bardziej efektywnym zarządzaniu komunikacją pomiędzy uczestnikami przedsięwzięcia budowlanego, a co za tym idzie bardziej efektywnym zarządzaniem wszystkimi realizowanymi zadaniami.
Przedsięwzięcia budowlane to złożone procesy realizowane w dynamicznych środowiskach. Uchwycenie i zrozumienie ich złożoności wymaga myślenia systemowego, według którego przedsięwzięcie interpretowane jest jako zbiór różnych elementów (zadania, ludzie, maszyny, materiały i wiedza) i relacji między nimi. Klasyczne podejście do analizy ryzyka w przedsięwzięciach budowlanych zaniedbuje ocenę złożoności tych systemów i znaczenia ich emergentnych właściwości, takich jak np. podatność na zagrożenia, zdolność do adaptacji czy w konsekwencji odporność systemowa. Stosowanie koncepcji proaktywnego podejścia w planowaniu przedsięwzięć budowlanych wymaga rozwijania metod ilościowych do modelowania takich systemów i analizy wyżej wymienionych właściwości, które są odpowiedzią systemu na ryzyko.
EN
Construction projects are complex processes carried out in dynamic environments. Grasping and understanding their complexity requires the adoption of systems thinking, in which a project is interpreted as a set of various elements (tasks, people, machines, materials and knowledge) and relations between them. The classical approach to risk analysis in construction projects neglects the assessment of the complexity of these systems and the significance of their emergent properties such as vulnerability to threats, adaptability and, consequently, systemic resilience. Using proactive approaches in construction project planning requires the development of quantitative methods of modeling such systems and analysing their abovementioned properties, which are a given system’s response to risk.
In the literature, researchers present construction projects as temporary self-organising coalition networks, composed of specialist entities that work towards set goals. The number of parties involved in the various processes during construction causes communications relations to be exceedingly complex and to change. The environment of a construction project is dynamic and complex, and self-organising communication networks are sensitive to institutional and social change. It becomes necessary to identify situations rooted in both insufficient communication during the carrying out of a project and its excess, which generates unnecessary cost. Effective control of information flow within self-organising communication networks through its planning and monitoring by project management can contribute to achieving project goals. This paper presents a proposal of an optimisation approach (in terms of minimising communication costs) to information flow planning that accounts for various constraints, on the example of a real-world case of building a housing complex in Poland.
PL
W literaturze przedmiotu badacze przedstawiają przedsięwzięcie budowalne jako tymczasową samoorganizującą się sieć koalicyjną składającą się ze specjalistycznych podmiotów realizujących założone cele. Środowisko przedsięwzięcia budowlanego jest dynamiczne i skomplikowane, a samoorganizująca się sieć komunikacji jest wrażliwa na zmiany instytucjonalne i społeczne. Koniecznością staje się identyfikacja sytuacji zarówno niedoboru komunikacji w ramach realizacji przedsięwzięcia jak i jej nadmiarowości, która generuje niepotrzebne koszty. W badaniach nad zarządzaniem w budownictwie intensywnie rozwijana jest od dwóch dekad analiza organizacji przedsięwzięć budowlanych z perspektywy sieci. Aby analizować komunikację i przepływ informacji, które są uznawana za podstawę wspólnej pracy, a następnie ogólnej poprawy wydajności, jako skuteczne narzędzie wykorzystywano analizę sieci społecznych SNA (Social Network Analysis). Jednak wykorzystanie SNA do analizy komunikacji pomiędzy uczestnikami przedsięwzięcia nie pozwala na identyfikację bezpośrednich czynników, które ją determinują. Kluczem do zrozumienia specyfiki komunikacji i w konsekwencji zarządzania jej przebiegiem jest przede wszystkim zrozumienie formalnej struktury organizacyjnej przedsięwzięcia, analiza harmonogramu jego realizacji oraz identyfikacja zasobów potrzebnej wiedzy, której wymiana pomiędzy uczestnikami determinuje charakter tej komunikacji. Autorzy niniejszego artykułu wyszli naprzeciw ograniczeniom w badaniach [17] i na podstawie danych dotyczących formalnej struktury organizacyjnej przedsięwzięcia, harmonogramu realizacji zadań z przypisaniem uczestników do ich realizacji a także informacji na temat posiadanej wiedzy przez uczestników, która jest potrzebna do realizacji poszczególnych zadań zaproponowali optymalizacyjne podejście do planowania i monitorowania wymaganej komunikacji pomiędzy uczestnikami realizowanego przedsięwzięcia budowlanego. Na potrzeby budowy struktury zależności pomiędzy uczestnikami, wiedzą i zadaniami przedsięwzięcia wykorzystano koncepcję meta-sieci [16]. W literaturze przedmiotu zostało opracowanych wiele miar strukturalnych które dostarczają różnych informacji o modelowanych zależnościach. Miary takie opracowano zarówno dla sieci jednomodowych [30] jak i wielomodowych [26] i zostały one wykorzystane na potrzeby niniejszego artykułu w kontekście analizy wymaganej komunikacji w przedsięwzięciu budowlanym. Otrzymana z analizy strukturalnej macierz wymaganej komunikacji Q dla danego ustalonego okresu (np. w cyklu miesięcznym) realizacji przedsięwzięcia zwykle wymaga korekty ze względu na nadmiarowość określonej w niej komunikacji. Dodatkowo macierz tą należy uzupełnić o formalną komunikację wynikającą z odgórnie narzuconej struktury organizacyjnej danego przedsięwzięcia. Oczekiwanym rezultatem przedmiotowej analizy będzie więc likwidacja nadmiarowości komunikacji i optymalizacja struktury połączeń komunikacyjnych pomiędzy agentami minimalizująca koszty tej komunikacji. W ramach optymalizacji preferowane będą już istniejące połączenia komunikacyjne z poprzedniego okresu realizacji przedsięwzięcia. Celem artykułu jest przedstawienie propozycji optymalizacyjnego (pod względem minimalizacji kosztów komunikacji) podejścia do planowania przepływu informacji z uwzględnieniem różnych ograniczeń. Model został przedstawiony na przykładzie rzeczywistej realizacji osiedla mieszkaniowego.
In recent years, we have been able to observe a dynamic development of MCDA (multi-criteria decision analysis) methods, which have become widely used in various sectors, including construction. These methods are characterised by simplicity and one of their key advantages is their simple modelling of non-linear dependencies within decision problems and their analysis under the conditions of incomplete, uncertain and hard-to-measure information. The universality and simple use of these methods does not, however, free the decision-maker from the necessity to adopt the proper approach to modelling and analysing specific decision problems. To highlight the fact that it is the character of the problem that should determine the selection of the method of analysing it and not the other way around, the authors assessed the AHP (Analytic Hierarchy Process) and the ANP (Analytic Network Process) method in terms of verifying the impact of the different decision model structures on analysis outcomes and analysed their sensitivity to input data changes. This analysis was based on the example of selecting a telecommunications tower footing reinforcement alternative. The findings confirmed the significant impact of decision model structure on the ranking of the analysed alternatives.
PL
W ostatnich latach można zauważyć dynamiczny rozwój metod MCDA (multi-criteria decision analysis), które znalazły powszechne zastosowanie także w budownictwie. Metody te cechuje prostota, a ich istotną zaletą jest łatwe modelowanie nieliniowych zależności w problemach decyzyjnych oraz ich analiza w warunkach niepełnej, niepewnej i trudno mierzalnej informacji. Autorzy niniejszego artykułu przeanalizowali specyfikę dwóch popularnych i uznanych metod wielokryterialnego wspomagania decyzji: metody AHP (Analytic Hierarchy Process) i ANP (Analytic Network Process). Przedmiotem oceny tych dwóch metod jest zagadnienie tzw. strukturyzacji problemu w formie modelu decyzyjnego, która determinuje charakter jego analizy. Ponieważ w praktyce wielu decydentów nie przywiązuje wagi do strukturyzacji problemu, w ramach stosowania w/w metod autorzy swoje rozważania na ten temat oparli na praktycznym przykładzie wyboru wariantu wzmocnienia posadowienia wieży telekomunikacyjnej stanowiącej część Radiowej Stacji Bazowej (RBS) Wierzbięcice w gminie Nysa na terenie Polski. W związku z planowaną modernizacją stacji bazowej i związaną z tym rozbudową infrastruktury antenowej na wieży i zwiększeniem obciążeń zalecono wykonanie wzmocnienia trzonu wieży oraz jej fundamentów. Analizie poddane zostały następujące warianty wzmocnienia fundamentu: V1 dodatkowe stopy fundamentowe, V2 mikropale, V3 płyta żelbetowa. Do oceny wariantów przyjęto siedem kryteriów decyzyjnych: C1 czas wykonania, C2 grunt do wywiezienia, C3 ilość potrzebnego sprzętu, C4 koszt, C5 stabilizacja tymczasowa, C6 stopień skomplikowania robót, C7 wymagania formalno-prawne. Celem przeprowadzonej analizy było ukazanie wpływu struktury modelu decyzyjnego na wybór optymalnego rozwiązania problemu decyzyjnego w świetle przyjętych kryteriów.
According to the concept of a system-based approach, a construction project can be treated as a complex system composed of various elements, such as human, equipment and material resources, as well as knowledge and tasks that are mutually interlinked. In the classical approach to construction project risk assessment, the impact of the “system” in the analysis of relationships between risk sources and their consequences has so far been neglected. The concept of construction project vulnerability and its adaptability has appeared in literature in recent years. It is analysed on the basis of a project’s vulnerability to the impact of risk factors and its adaptive capacity is seen an answer to project perturbations caused by adverse random events. As a part of developing the system-based approach to analysing construction project schedule, the author further developed the concept of modelling planned construction projects with relationship meta-networks composed of four types of nodes: agents (human resources), knowledge, equipment and material resources and tasks. The author included possible deviations from the planned project’s budget in the schedule vulnerability and adaptability analysis, instead of only focusing on deviations from its completion deadline. An analysis of the occurrence of additional and replacement work was introduced by the author, which further developed the concept of the simulated evolution of such networks to include the capacity to introduce new nodes and links into their structure. Furthermore, the author used the potential of weighted meta-networks to model certain dependencies within the planned project. A simulation-based approach as a part of DNA (dynamic network analysis) was used to analyse the vulnerability and adaptability of such networks. The proposed approach was presented on the example of a renovation project performed on a historical structure. The conclusions drawn from the author’s analyses can be used to formulate construction project schedules that are less vulnerable to perturbations and are characterised by greater adaptability. In the future, the author plans to expand the analysis presented above to include dependencies in single-mode networks (e.g. in agent, resource or knowledge networks) on the meta-network of a project.