Tytuł artykułu
Treść / Zawartość
Pełne teksty:
Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
In the last decade, the oil industry has transitioned from primarily drilling vertical wells to a majority of extended reach complex horizontal wells with help of geosteering techniques for better reservoir and production efficiencies. The overall objective of geosteering and well placement has helped to maximize reservoir contact by the keeping well trajectory in the pay zone with the help of quality real-time data, especially in these uncertain times of pandemic due to COVID-19. This paper illustrates the immense impact of real-time data feeds (special logging tools/images) at operation centers with the full remote expert support of multidisciplinary teams. The proper data communication mechanism is also helpful to share the information across asset teams in a timely manner to drill complex wells remotely. To achieve the desired geosteering objectives, experts monitor and evaluate the real-time data in a landing well accurately in the pay horizon by designing the well path which considers geological variables like (reservoir architecture, permeability and porosity distribution, and fluid contacts) which further helps update the reservoir models in real-time based on the latest subsurface information for better reservoir management and timely decision making.
Wydawca
Czasopismo
Rocznik
Tom
Strony
125--130
Opis fizyczny
Bibliogr. 7 poz., rys., wykr.
Twórcy
autor
- Geological Survey of Pakistan, 87300 Quetta, Pakistan
autor
- Department of Earth and Environmental Sciences, Bahria University; Islamabad, Pakistan
autor
- PGNiG (Polish Oil & Gas Company) Pakistan Branch; Islamabad, Pakistan
Bibliografia
- Dawoud A., El Mahdi A., Ayoub M., Bin Saad M., Al Marzouqi K., Hendrawan I., Daif-Allah S. & Ghazi K., 2010. Geosteering Long Horizontal Holes in Abu Dhabi Heterogeneous Carbonate Reservoirs. Paper presented at the SPE Oil and Gas India Conference and Exhibition, Mumbai, India, 20–22 January, SPE-128851-MS. https://doi.org/10.2118/128851-MS.
- Fjellheim R., Herbert M., Arild Ø., Bisio R. & Holo Ø., 2010. Collaboration and Decision Support in Geosteering. Paper presented at the SPE Intelligent Energy Conference and Exhibition, Utrecht, The Netherlands, March 2010, SPE-128721-MS. https://doi.org/10.2118/128721-MS.
- Khudiri M.M., Oteibi M.D., Gadri W.I., AlSanie F.S., Kashif M. & Hickin G., 2014. An Innovative Approach to Select Shallow Casing Points Remotely, Utilizing RealTime WITSML Data. Paper presented at the SPE Intelligent Energy Conference & Exhibition, Utrecht, The Netherlands, April 2014, SPE-167813-MS. https://doi.org/10.2118/167813-MS.
- Kullawan K., Bratvold R. & E. Bickel J.E., 2014. A Decision Analytic Approach to Geosteering Operations. SPE Drilling and Completion, 29(01), 36–46. https://doi.org/10.2118/167433-PA.
- Petrolink, n.d. Single Viewer Solution for Real-Time Drilling Data Saves Middle East Operator 50% of Previous Costs. https://www.petrolink.com/single-viewer-solution-saves-middle-east-operator-50-percent-of-previous-costs/ [access: 5.08.2021].
- Raja H., Carpenter G. & DeShawn O., 2011. Workflows and Methods to Optimize Well Construction through a Collaborative Environment. Paper presented at the SPE Digital Energy Conference and Exhibition, The Woodlands, Texas, USA, April 2011, SPE-143600-MS. https://doi. org/10.2118/143600-MS.
- Sapkal A.V., Keot C.J., Majumdar C., Kar S., Kumar S., Vashisht T.S. & Kumar A., 2011. Geosteering technology shows the new direction for major production enhancement in western onshore, India: an exceptional success-story from ONGC Ahmedabad asset. [in:] SPWLA-INDIA 3rd Annual Logging Symposium, Mumbai, India Nov 25–26, 2011.
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa Nr 461252 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2021).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-697338be-8b93-4d98-b3ef-5833d9e78c89