Tytuł artykułu

Calculation of minimal short-circuit current in parallel arrangement of cables for a three phase short-circuit fault

Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
PL
Obliczanie minimalnego pra˛du zwarciowego w układzie równoległym kabli dla trójfazowego zwarcia
Języki publikacji
EN
Abstrakty
EN
In commonly used short-circuit current calculation methodology, the acceptance of a short-circuit site in the middle of their length leads not only to a significant overestimation of short-circuit currents, but also does not guarantee the selective coordination of electrical apparatus and its proper protection function against electrical shock. The paper presents new approach to the problem of calculation short-circuit current in parallel cables. It is proven that the worst case scenario is highly influenced by the number of cables connected in parallel.
PL
W powszechnie stosowanej metodologii obliczania prądu zwarciowego przyjmuje się, że miejsce zwarcia występuje w środku ich długości co prowadzi nie tylko do znacznego przeszacowania prądów zwarciowych, ale również nie gwarantuje selektywnej koordynacji aparatury elektrycznej i jej odpowiedniej ochrony przed porażeniem elektrycznym. W artykule przedstawiono nowe podejście do problemu obliczeniowego prądu zwarciowego w przewodach równoległych. Udowodniono, że w najgorszym przypadku duzy wpływ ma liczba połączonych równolegle kabli.
Rocznik
Strony
124--128
Opis fizyczny
Bibliogr. 7 poz., rys., tab.
Twórcy
  • Instytut Elektroenergetyki, Wydział Elektryczny, Politechnika Poznańska, Pl. Marii Skłodowskiej-Curie 5, 60-965 Poznań
  • Instytut Elektroenergetyki, Wydział Elektryczny, Politechnika Poznańska, Pl. Marii Skłodowskiej-Curie 5, 60-965 Poznań
Bibliografia
  • [1] IEC 60364-5-52, electrical installations of buildings part 5-52: Selection and erection of electrical equipment wiring systems. Technical report, International Electrotechnical Commission, 2009.
  • [2] L. Borowik and A. Cywinski. Current-carrying capacity parallel single-core lv cable. Przegląd Elektrotechniczny, 92(1):71–74, 2016.
  • [3] L. Borowik and A. Cywinski. Low voltage cable lines made of parallel wires – modelling of spatial configuration. Przegląd Elektrotechniczny, 92(2):148–151, 2016.
  • [4] Y. Du and J. Burnett. Current distribution in single-core cables connected in parallel. IEEE Proceedings - Generation, Transmission and Distribution, 148(5):406–412, Sep 2001.
  • [5] F. Freschi and M. Tartaglia. Power lines made of many parallel single-core cables: A case study. IEEE Transactions on Industry Applications, 49(4):1744–1750, July 2013.
  • [6] Z. Li, X. Zhong, J. Xia, R. Bian, S. Xu, and J. Cao. Simulation of current distribution in parallel single-core cables based on finite element method. In Fifth International Conference on Instrumentation and Measurement, Computer, Communication and Control (IMCCC), pages 411–415, Sept 2015.
  • [7] B. Novak and L. Koller. Current distribution and losses of grouped underground cables. IEEE Transactions on Power Delivery, 26(3):1514–1521, July 2011.
Uwagi
Opracowanie rekordu w ramach umowy 509/P-DUN/2018 ze środków MNiSW przeznaczonych na działalność upowszechniającą naukę (2019).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-ff6f1309-691d-48ba-801a-e48b210c8ca8
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.