Purpose: The aim of the article is to present and assess the usefulness of the Kaizen method in the management and organization processes of enterprises from the construction sector. Design/methodology/approach: The research includes identifying tools in the area of Kaizen philosophy, assessing the possibilities of its implementation in the construction industry and identifying the most beneficial solutions. Elements of statistical and observational methods were used, as well as analyzes of literature reports. SWOT analysis was used to determine the level of suitability of the Kaizen method. Findings: The conducted research showed the need to implement Lean Management tools in the structures of construction companies, in particular the Kaizen method. However, certain barriers have also been noticed, limiting their use in the Polish construction industry. Research limitations/implications: The research presented is only a preliminary analysis, which is a starting point for further research on the use of the Kaizen method in construction, the method of selecting its tools and the benefits resulting from them. Due to knowledge, financial and technological deficiencies of construction companies, it is impossible to fully assess the analyzed aspect in the area of all types of enterprises. Practical implications: The obtained results show the positive impact of the Lean Management method on the functioning of the enterprise. Thanks to the use of Kaizen tools, it is possible to increase the efficiency of the company and solve most problems, including the generation of large amounts of waste, insufficient financial resources for planned projects, low level of competitiveness on the market, disorganization of work and lack of timeliness of initiated implementations. The presented SWOT analysis can be successfully used as a tool supporting the decision-making process aimed at adopting an appropriate company strategy. Thanks to its simplicity and speed of execution, it allows you to save time and initially reject unfavorable solutions. Moreover, an important factor in favor of its use is the ability to adjust the criteria and weights determined by the established preferences of a given company. Originality/value: The added value of the article is a practical presentation of the use of SWOT analysis to determine the most advantageous strategy necessary to be undertaken by construction companies in order to implement the principles of Lean Management.
Rocznik
Tom
Strony
67--79
Opis fizyczny
Bibliogr. 40 poz.
Twórcy
  • Czestochowa University of Technology, Faculty of Civil Engineering
Bibliografia
  • 1. Ansah, R.H., Sorooshian, S. (2017). Effect of Lean tools to control external environment risks of construction projects. Sustainable Cities and Society, 32, pp. 348-356. http://dx.doi.org/10.1016/j.scs.2017.03.027
  • 2. Antonelli, D., Stadnicka, D., Litwin, P. (2024). Inclusive manufacturing through the application of Lean tools to sustainability issues. Procedia CIRP, 122, pp. 593-598, doi: 10.1016/j.procir.2024.01.085
  • 3. Aristizábal-Monsalve, P., Vásquez-Hernández, A., Botero Botero, L.F. (2022). Perceptions on the processes of sustainable rating systems and their combined application with Lean Construction. Journal of Building Engineering, 46, 103627. https://doi.org/10.1016/j.jobe. 2021.103627
  • 4. Aureliano, F.d’S., Costa, A.Ap.F., Júnior, I.F., Rodrigues, R.A. (2019). Application of Lean manufacturing in construction management. Procedia Manufacturing, 38, pp. 241-247, doi: 10.1016/j.promfg.2020.01.032
  • 5. Babalola, O., Ibem, E.O., Ezema, I.C. (2019). Implementation of Lean practices in the construction industry: A systematic review. Building and Environment, 148, pp. 34-43. https://doi.org/10.1016/j.buildenv.2018.10.051
  • 6. Brycht, N. (2021). Assessment of the quality of the repair process of local roads in the rural areas of the Częstochowa and Kłobuck poviats in the context of road safety. Production Engineering Archives, 27(4), pp. 232-241, doi: 10.30657/pea.2021.27.31
  • 7. Brycht, N. (2022). Ocena realizacji dróg samorządowych w technologii betonowej i asfaltowej na podstawie analizy SWOT [Evaluation of the implementation of local government roads in concrete and asphalt technology based on SWOT analysis]. Materiały Budowlane, 12(604), pp. 82-84, doi: 10.15199/33.2022.12
  • 8. Brycht, N. (2024). The Problem of Recycling Construction Waste in Poland. Z. Blikharskyy et al. (Eds.): CEE 2023, LNCE 438, pp. 42–48, doi: 10.1007/978-3-031-44955-0_5
  • 9. Brycht, N., Ulewicz, M. (2023). Application of the SWOT-TOWS analysis as a supporting tool when selecting a strategy for the implementation of local concrete roads. Scientific Papers of Silesian University of Technology. Organization and Management Series, 172, pp. 61-71. http://dx.doi.org/10.29119/1641-3466.2023.172.4
  • 10. Bugdol, M., Goranczewski, B., Kądzielawski, G., Pakuła, G. (2020). Propozycja wdrożenia koncepcji „Lean Construction” opartej na znormalizowanych systemach zarządzania jakością w organizacjach branży budowlanej [The proposition of implementing the Lean Construction concept based on normalized quality management systems in the organizations operating in the construction industry]. Cement Wapno Beton, 25(4), pp. 261-274. https://doi.org/10.32047/CWB.2020.25.4.1
  • 11. Dębska, B., Krasoń, J., Lichołai, L. (2020). Application of Taguchi method for the design of cement mortars containing waste materials. Construction of Optimized Energy Potential, Vol. 9, No. 1, pp. 15-26, doi: 10.17512/bozpe.2020.1.02
  • 12. Dombrowski, U., Mielke, T. (2014). Lean Leadership – 15 Rules for a sustainable Lean Implementation. Procedia CIRP, 17, pp. 565-570, doi: 10.1016/j.procir.2014.01.146
  • 13. Du, J., Zhang, J., Castro-Lacouture, D., Hu, Y. (2023). Lean manufacturing applications in prefabricated construction projects. Automation in Construction, 150, 104790. https://doi.org/10.1016/j.autcon.2023.104790
  • 14. Gabryelewicz, I., Gawłowicz, P., Sadłowska-Wrzesińska, J. (2015). Kaizen jako skuteczna metoda wspomagająca efektywne zarządzanie przedsiębiorstwem [Kaizen as an efficient method enhancing effective company management]. Problemy Profesjologii, 2, pp. 139-148.
  • 15. Hąbek, P., Lavios, J.J., Grzywa, A. (2023). Lean Manufacturing Practices Assessment Case Study of Automotive Company. Production Engineering Archives, 29(3), pp. 311-318, doi: 10.30657/pea.2023.29.36
  • 16. Hussain, K., He, Z., Ahmad, N., Iqbal, M., Mumtaz, S.M.T. (2019). Green, Lean, Six Sigma barriers at a glance: A case from the construction sector of Pakistan. Building and Environment, 161, 106225. https://doi.org/10.1016/j.buildenv.2019.106225
  • 17. Jakubiec, M. (2022). Improvement of the production process using Lean Management – case study. Scientific Papers of Silesian University of Technology. Organization and Management Series, 158, pp. 229-242. http://dx.doi.org/10.29119/1641-3466.2022.158.15
  • 18. Lizak, M. (2016). Methods of measuring the effectiveness of Lean Management. Production Engineering Archives, Vol. 13, No. 4, pp. 31-34.
  • 19. Maarof, M.G., Mahmud, F. (2016). A Review of Contributing Factors and Challenges in Implementing Kaizen in Small and Medium Enterprises. Procedia Economics and Finance, 35, pp. 522-531, doi: 10.1016/S2212-5671(16)00065-4
  • 20. Mazur, M., Momeni, H. (2018). LEAN Production issues in the organization of the company – results. Production Engineering Archives, 22, pp. 50-53, doi: 10.30657/pea.2019.22.10
  • 21. Nowotarski, P., Pasławski, J., Dallasega, P. (2021). Multi-criteria assessment of Lean Management tools selection in construction. Archives of Civil Engineering, Vol. 67, Iss. 1, pp. 711-726, doi: 10.24425/ace.2021.136498
  • 22. Obora, H. (2010). Podejście PDCA Problem Solving w rozwiązywaniu problemów organizacji. Acta Universitatis Lodziensis. Folia Oeconomica, 234, pp. 323-333, doi: 11089/292
  • 23. Pickton, D.W., Wright, S. (1998). What's swot in strategic analysis? Strategic Change, 7(2), pp. 101-109. https://doi.org/10.1002/(SICI)1099-1697(199803/04)7:2<101::AID-JSC332>3.0.CO;2-6
  • 24. Piercy, N., Giles, W. (1989). Making SWOT analysis work. Marketing Intelligence & Planning, 7(5/6), pp. 5-7. https://doi.org/10.1108/EUM0000000001042
  • 25. Prasalska-Nikoniuk, J., Urbański, M., Ulewicz, R. (2022). ISO 9001:2015 vs. Factory Production Control (FPC) to ensure the quality of construction products used in road and bridge engineering. Construction of Optimized Energy Potential, Vol. 10, pp. 103-111, doi: 10.17512/bozpe.2022.11.12
  • 26. Saurin, T.A., Duarte Ribeiro, J.L., Vidor, G. (2012). A framework for assessing Poka-Yoke devices. Journal of Manufacturing Systems, 31, pp. 358-366. http://dx.doi.org/10.1016/j.jmsy.2012.04.001
  • 27. Scopus – Document search. Retrieved from: https://www.scopus.com/search/form.uri?display=basic#basic, 18.06.2024.
  • 28. Singh, S., Kumar, K. (2021). A study of Lean Construction and visual management tools through cluster analysis. Ain Shams Engineering Journal, 12, pp. 1153-1162. https://doi.org/10.1016/j.asej.2020.04.019
  • 29. Solaimani, S., Sedighi, M. (2020). Toward a holistic view on Lean sustainable construction: A literature review. Journal of Cleaner Production, 248, 119213. https://doi.org/10.1016/j.jclepro.2019.119213
  • 30. Starosta, A. (2016). Cykl PDCA w zarządzaniu antykryzysowym na przykładzie polskich przedsiębiorstw [PDCA cycle in crisis management on the example of polish enterprises]. Nauki o Zarządzaniu. Management Sciences, 1(26), pp. 142-151, doi: 10.15611/noz.2016.1.12
  • 31. Statistics Poland, Environment 2023. Retrieved from: https://stat.gov.pl/en/topics/ environment-energy/environment/environment-2023,1,15.html, 18.06.2024.
  • 32. Stronczek, A. (2024). Implementation status of Lean Management in polish manufacturing enterprises. Scientific Papers of Silesian University of Technology. Organization and Management Series, 191, pp. 519-540. http://dx.doi.org/10.29119/1641-3466.2024.191.33
  • 33. Ulewicz, R., Kleszcz, D., Ulewicz, M. (2021). Implementation of Lean Instruments in Ceramics Industries. Management Systems in Production Engineering, 29(3), pp. 203-207, doi: 10.2478/mspe-2021-0025
  • 34. Ulewicz, R., Lazar, L.V. (2019). The effect of Lean tools on the safety level in manufacturing organizations. System Safety: Human - Technical Facility – Environment CzOTO, Vol. 1, Iss. 1, pp. 514-521, doi: 10.2478/czoto-2019-0066
  • 35. Ulewicz, R., Ulewicz, M. (2020). Problems in the Implementation of the Lean Concept in the Construction Industries. Lecture Notes in Civil Engineering, 47, pp. 495-500. https://doi.org/10.1007/978-3-030-27011-7_63
  • 36. Veres (Harea), C., Marian, L., Moica, S., Al-Akel, K. (2018). Case study concerning 5S method impact in an automotive company. Procedia Manufacturing, 22, pp. 900-905, doi: 10.1016/j.promfg.2018.03.127.
  • 37. Wolniak, R., Grebski, W. (2023). The usage of Kaizen in industry 4.0 conditions. Scientific Papers of Silesian University of Technology. Organization and Management Series, 188, pp. 677-686. http://dx.doi.org/10.29119/1641-3466.2023.188.41
  • 38. Wolniak, R., Grebski, W. (2023). The usage of Lean Management in industry 4.0 conditions. Scientific Papers of Silesian University of Technology. Organization and Management Series, 187, pp. 761-775. http://dx.doi.org/10.29119/1641-3466.2023.187.40
  • 39. Yücenur, G.N., Şenol, K. (2021). Sequential SWARA and fuzzy VIKOR methods in elimination of waste and creation of Lean Construction processes. Journal of Building Engineering, 44, 103196. https://doi.org/10.1016/j.jobe.2021.103196
  • 40. Żebrucki, Z., Kruczek, M. (2018). Uwarunkowania wdrożenia koncepcji Lean Management w sektorze MŚP [The conditions for the implementation of the Lean Management concept in the SME sector]. Zeszyty Naukowe Politechniki Śląskiej. Seria: Organizacja i Zarządzanie, 120, pp. 257-272.
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa nr POPUL/SP/0154/2024/02 w ramach programu "Społeczna odpowiedzialność nauki II" - moduł: Popularyzacja nauki (2025).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-fe7a460c-5374-4281-833e-b41670680f9e
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.