Artificial intelligence applications in project scheduling: a systematic review, bibliometric analysis, and prospects for future research

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The availability of digital infrastructures and the fast-paced development of accompanying revolutionary technologies have triggered an unprecedented reliance on Artificial intelligence (AI) techniques both in theory and practice. Within the AI domain, Machine Learning (ML) techniques stand out as essential facilitator largely enabling machines to possess human-like cognitive and decision making capabilities. This paper provides a focused review of the literature addressing applications of emerging ML toolsto solve various Project Scheduling Problems (PSPs). In particular, it employs bibliometric and network analysis tools along with a systematic literature review to analyze a pool of 104 papers published between 1985 and August 2021. The conducted analysis unveiled the top contributing authors, the most influential papers as well as the existing research tendencies and thematic research topics within this field of study. A noticeable growth in the number of relevant studies is seen recently with a steady increase as of the year 2018. Most of the studies adopted Artificial Neural Networks, Bayesian Network and Reinforcement Learning techniques to tackle PSPs under a stochastic environment, where these techniques are frequently hybridized with classical metaheuristics. The majority of works (57%) addressed basic Resource Constrained PSPs and only 15% are devoted to the project portfolio management problem. Furthermore, this study clearly indicates that the application of AI techniques to efficiently handle PSPs is still in its infancy stage bringing out the need for further research in this area. This work also identifies current research gaps and highlights a multitude of promising avenues for future research.
Wydawca
Rocznik
Tom
Strony
144--161
Opis fizyczny
Bibliogr. 147 poz., rys., tab.
Twórcy
autor
  • Department of Industrial Engineering American University of Sharjah P.O. Box 26666, Sharjah, United Arab Emirates; tel: +971 6 515 4981
  • Department of Industrial Engineering The Hashemite University P.O. Box 330127, Zarqa, Jordan
autor
  • Department of Industrial Engineering American University of Sharjah P.O. Box 26666, Sharjah, United Arab Emirates
  • Department of Industrial Engineering American University of Sharjah P.O. Box 26666, Sharjah, United Arab Emirates
Bibliografia
  • [1] S. Christodoulou, "Scheduling resource-constrained projects with ant colony optimization artificial agents," Journal of computing in civil engineering, vol. 24, pp. 45- 55, 2010.
  • [2] J. Blazewicz, J.K. Lenstra, and A.H.G.R. Kan, "Scheduling subject to resource constraints: classification and complexity," Discrete Applied Mathematics, vol. 5, pp. 11- 24, 1983.
  • [3] M. Ranjbar, "A path-relinking metaheuristic for the resource levelling problem," Journal of the Operational Research Society, vol. 64, pp. 1071-1078, 2013.
  • [4] L. Balyen and T. Peto, "Promising Artificial Intelligence-Machine Learning-Deep Learning Algorithms in Ophthalmology," The Asia-Pacific Journal of Ophthalmology, vol. 8, 2019.
  • [5] P. Ongsulee, "Artificial intelligence, machine learning and deep learning," in 2017 15th International Conference on ICT and Knowledge Engineering (ICT&KE), 2017, pp. 1-6.
  • [6] Z. Ghahramani, "Probabilistic machine learning and artificial intelligence," Nature, vol. 521, pp. 452-459, 2015.
  • [7] D. Patel, Y. Shah, N. Thakkar, K. Shah, and M. Shah, "Implementation of artificial intelligence techniques for cancer detection," Augmented Human Research, vol. 5, pp. 1-10, 2020.
  • [8] D. Luckey, H. Fritz, D. Legatiuk, K. Dragos, and K. Smarsly, "Artificial intelligence techniques for smart city applications," in International Conference on Computing in Civil and Building Engineering, 2020, pp. 3-15.
  • [9] Z. Ullah, F. Al-Turjman, L. Mostarda, and R. Gagliardi, "Applications of artificial intelligence and machine learning in smart cities," Computer Communications, vol. 154, pp. 313-323, 2020.
  • [10] S. Shakya, "Analysis of artificial intelligence based image classification techniques," Journal of Innovative Image Processing (JIIP), vol. 2, pp. 44-54, 2020.
  • [11] G. Gutierrez, "Artificial intelligence in the intensive care unit," Critical Care, vol. 24, pp. 1-9, 2020.
  • [12] T. Gościniak and K. Wodarski, "Effectiveness of Using the Method of Artificial Intelligence in Maintenance of Ict Systems," Management Systems in Production Engineering, vol. 27, pp. 40-45, 2019.
  • [13] A. Lozhkin, K. Maiorov, and P. Bozek, "Convolutional Neural Networks Training for Autonomous Robotics," Management Systems in Production Engineering, vol. 29, pp. 75-79, 2021.
  • [14] H. Aytug, S. Bhattacharyya, G.J. Koehler, and J.L. Snowdon, "A review of machine learning in scheduling," IEEE Transactions on Engineering Management, vol. 41, pp. 165-171, 1994.
  • [15] P.I. a. A.O.T. Adamu, "Machine Learning Priority Rule (MLPR) for solving resource-constrained project scheduling problems," presented at the Lecture Notes in Engineering and Computer Science, 2018.
  • [16] M. Awada, F.J. Srour, and M. Srour Issam, "Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling," Journal of Management in Engineering, vol. 37, p. 04020104, 2021/07/31 2021.
  • [17] N. Kartam and T. Tongthong, "Potential of artificial neural networks for resource scheduling," Artificial Intelligence for Engineering Design, Analysis and Manufacturing, vol. 11, pp. 171-185, 1997.
  • [18] N. Simeunovic, I. Kamenko, V. Bugarski, M. Jovanovic, and B. Lalic, "Improving workforce scheduling using artificial neural networks model," Advances in Production Engineering & Management, vol. 12, pp. 337-352, 2017.
  • [19] M. Koopialipoor, H. Tootoonchi, D. Jahed Armaghani, E. Tonnizam Mohamad, and A. Hedayat, "Application of deep neural networks in predicting the penetration rate of tunnel boring machines," Bulletin of Engineering Geology and the Environment, vol. 78, pp. 6347-6360, 2019.
  • [20] D. Mishra, A. Gunasekaran, T. Papadopoulos, and S.J. Childe, "Big Data and supply chain management: a review and bibliometric analysis," Annals of Operations Research, vol. 270, pp. 313-336, 2018.
  • [21] B. Fahimnia, J. Sarkis, and H. Davarzani, "Green supply chain management: A review and bibliometric analysis," International Journal of Production Economics, vol. 162, pp. 101-114, 2015.
  • [22] A. Darko, A.P.C. Chan, M.A. Adabre, D.J. Edwards, M.R. Hosseini, and E.E. Ameyaw, "Artificial intelligence in the AEC industry: Scientometric analysis and visualization of research activities," Automation in Construction, vol. 112, p. 103081, 2020.
  • [23] M. Bilal, L.O. Oyedele, J. Qadir, K. Munir, S.O. Ajayi, O.O. Akinade, et al., "Big Data in the construction industry: A review of present status, opportunities, and future trends," Advanced engineering informatics, vol. 30, pp. 500-521, 2016.
  • [24] A.J.L. Rodrigues, "Structure and logic in knowledge-based representations of systems simulation models," European Journal of Operational Research, vol. 37, pp. 120-126, 1988.
  • [25] T.C. Chang and C. William Ibbs, "Priority ranking – a fuzzy expert system for priority decision making in building construction resource scheduling," Building and Environment, vol. 25, pp. 253-267, 1990.
  • [26] J. Nabrzyski and J. Weglarz, "A knowledge – based multiobjective project scheduling system," Journal of Decision Systems, vol. 3, pp. 185-200, 1994.
  • [27] J. Conlin and A. Retik, "The applicability of project management software and advanced IT techniques in construction delays mitigation," International Journal of Project Management, vol. 15, pp. 107-120, 1997.
  • [28] V. Yannibelli and A. Amandi, "A knowledge-based evolutionary assistant to software development project scheduling," Expert Systems with Applications, vol. 38, pp. 8403-8413, 2011.
  • [29] V. S. Dave and K. Dutta, "Neural network based models for software effort estimation: A review," Artificial Intelligence Review, vol. 42, pp. 295-307, 2014.
  • [30] IBM. (2020, February 18, 2022.). Neural Networks. Available: https://www.ibm.com/cloud/learn/neural-networks
  • [31] S. Colak, A. Agarwal, and S.S. Erenguc, "Resource Constrained Project Scheduling: a Hybrid Neural Approach," in Perspectives in Modern Project Scheduling, ed Boston, MA: Springer US, 2006, pp. 297-318.
  • [32] A. Agarwal, S. Colak, and S. Erenguc, "A Neurogenetic approach for the resource-constrained project scheduling problem," Computers & Operations Research, vol. 38, pp. 44-50, 2011.
  • [33] C.T. Dimitrios, K.S. Ilias, and M.T. Kechadi, "Phased Method for Solving Multi-Objective MPM Job Shop Scheduling Problem," International Journal of Monitoring and Surveillance Technologies Research (IJMSTR), vol. 4, pp. 42-61, 2016.
  • [34] J.H. Rosłon and J.E. Kulejewski, "A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction," Open Engineering, vol. 9, pp. 7-13, 2019.
  • [35] J.M. Alostad, "Dynamic software management practices using genetically augmented neural networks," International Journal of Internet Technology and Secured Transactions, vol. 10, pp. 322-336, 2022/02/12 2020.
  • [36] W. Huang and L. Gao, "A Time Wave Neural Network Framework for Solving Time-Dependent Project Scheduling Problems," IEEE Transactions on Neural Networks and Learning Systems, vol. 31, pp. 274-283, 2020.
  • [37] S. Liu and W. Hao, "Forecasting the scheduling issues in engineering project management: Applications of deep learning models," Future Generation Computer Systems, vol. 123, pp. 85-93, 2021.
  • [38] P. Pagani and F. Pfann, "Deep Neural Networks for the Scheduling of Resource-Constrained Activity Sequences: A Preliminary Investigation," Logistics Journal: Proceedings, vol. 2020, 2020.
  • [39] G. Ma and M. Wu, "A Big Data and FMEA-based construction quality risk evaluation model considering project schedule for Shanghai apartment projects," International Journal of Quality and Reliability Management, vol. 37, pp. 18-33, 2020.
  • [40] X.-S. Yang, "2 - Mathematical foundations," in Introduction to Algorithms for Data Mining and Machine Learning, ed: Academic Press, 2019, pp. 19-43.
  • [41] P. Rezakhani, "Project scheduling and performance prediction: a fuzzy-Bayesian network approach," Engineering, Construction and Architectural Management, vol. ahead-of-print, 2022/02/12 2021.
  • [42] J.R. van Dorp, "A dependent project evaluation and review technique: A Bayesian network approach," European Journal of Operational Research, vol. 280, pp. 689-706, 2020.
  • [43] M.-Y. Cheng, Y.-F. Wu, Y.-W. Wu, and S. Ndure, "Fuzzy Bayesian schedule risk network for offshore wind turbine installation," Ocean Engineering, vol. 188, p. 106238, 2019.
  • [44] K.T. Knudsen and M. Blackburn, "A Knowledge and Analytics-Based Framework and Model for Forecasting Program Schedule Performance," Procedia Computer Science, vol. 95, pp. 319-326, 2016.
  • [45] T. Fatima, F. Azam, M.W. Anwar, and Y. Rasheed, "A Systematic Review on Software Project Scheduling and Task Assignment Approaches," presented at the Proceedings of the 2020 6th International Conference on Computing and Artificial Intelligence, Tianjin, China, 2020.
  • [46] K. a. H.B. Gersmann, "Improving iterative repair strategies for scheduling with the SVM," Neurocomputing, vol. 63, pp. 271-292, 2005.
  • [47] X.-S. Yang, S. Deb, and S. Fong, "Accelerated Particle Swarm Optimization and Support Vector Machine for Business Optimization and Applications," Berlin, Heidelberg, 2011, pp. 53-66.
  • [48] M. Đumić and D. Jakobović, "Ensembles of priority rules for resource constrained project scheduling problem," Applied Soft Computing, vol. 110, p. 107606, 2021.
  • [49] P.I. Adamu, H.I. Okagbue, and P.E. Oguntunde, "A New Priority Rule for Solving Project Scheduling Problems," Wireless Personal Communications, vol. 106, pp. 681-699, 2019.
  • [50] W. a. V.M. a. C.J. a. L.J. Guo, "Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem," Expert Systems with Applications, vol. 167, 2021.
  • [51] P. a. R.-R.E. Jedrzejowicz, "Reinforcement Learning strategies for A-Team solving the Resource-Constrained Project Scheduling Problem," Neurocomputing, vol. 146, pp. 301-307, 2014.
  • [52] P. a. R.-R.E. Jędrzejowicz, "Reinforcement learning strategy for solving the MRCPSP by a team of agents," Smart Innovation, Systems and Technologies, vol. 39, pp. 537-548, 2015.
  • [53] X.-l. Zheng and L. Wang, "A multi-agent optimization algorithm for resource constrained project scheduling problem," Expert Systems with Applications, vol. 42, pp. 6039-6049, 2015.
  • [54] E. Ratajczak-Ropel, "Experimental Evaluation of Agent-based Approaches to Solving Multi-mode Resource-Constrained Project Scheduling Problem," Cybernetics and Systems, vol. 49, pp. 296-316, 2018.
  • [55] K.M. Sallam, R.K. Chakrabortty, and M.J. Ryan, "A reinforcement learning based multi-method approach for stochastic resource constrained project scheduling problems," Expert Systems with Applications, vol. 169, p. 114479, 2021.
  • [56] H. Zhang, G. Jiang, and T. Huang, "An Agent-based Optimization Approach for Distributed Project Scheduling in Supply Chain with Partial Information Sharing," in ICAART (1), 2010, pp. 603-606.
  • [57] F. Padberg and D. Weiss, "Model-Based Scheduling Analysis for Software Projects," in 2011 IEEE 35th Annual Computer Software and Applications Conference Workshops, 2011, pp. 304-309.
  • [58] F. Padberg and D. Weiss, "Optimal Scheduling of Software Projects Using Reinforcement Learning," in 2011 18th Asia-Pacific Software Engineering Conference, 2011, pp. 9-16.
  • [59] S. Chen, S. Fang, and R. Tang, "A reinforcement learning based approach for multi-projects scheduling in cloud manufacturing," International Journal of Production Research, vol. 57, pp. 3080-3098, 2019.
  • [60] I. Sung, B. Choi, and P. Nielsen, "Reinforcement Learning for Resource Constrained Project Scheduling Problem with Activity Iterations and Crashing," IFAC-PapersOnLine, vol. 53, pp. 10493-10497, 2020.
  • [61] J. Borregan-Alvarado, I. Alvarez-Meaza, E. Cilleruelo-Carrasco, and G. Garechana-Anacabe, "A Bibliometric Analysis in Industry 4.0 and Advanced Manufacturing: What about the Sustainable Supply Chain?," Sustainability, vol. 12, p. 7840, 2020.
  • [62] M. Saunders, P. Lewis, and A. Thornhill, Research methods for business students: Pearson education, 2009.
  • [63] A. Saihi, M. Ben-Daya, and R.A. As'ad, "Maintenance and sustainability: a systematic review of modeling-based literature," Journal of Quality in Maintenance Engineering, vol. ahead-of-print, 2022/02/25 2022.
  • [64] L.M. Kipper, L.B. Furstenau, D. Hoppe, R. Frozza, and S. Iepsen, "Scopus scientific mapping production in industry 4.0 (2011-2018): a bibliometric analysis," International Journal of Production Research, vol. 58, pp. 1605-1627, 2020.
  • [65] A.W. Harzing, "Publish or Perish," ed, 2007.
  • [66] O. Persson, "BibExcel," ed, 2017.
  • [67] O. Persson, R. Danell, and J. Schneider, "How to use Bibexcel for various types of bibliometric analysis," Celebrating Scholarly Communication Studies: A Festschrift for Olle Persson at His 60th Birthday, vol. 5, pp. 9-24, 2009.
  • [68] N.J. van Eck and L. Waltman, "VOSviewer," ed, 2010.
  • [69] M. Bastian, S. Heymann, and M. Jacomy, "Gephi: an open source software for exploring and manipulating networks," in Third international AAAI conference on weblogs and social media, 2009.
  • [70] E.C.F. p. d. N. Garfield, "Citation Analysis as a Tool in Journal Evaluation," Science, vol. 178, pp. 471-479, 2021/07/04/ 1972.
  • [71] A.D. Sharplin and R.H. Mabry, "The Relative Importance of Journals Used in Management Research: An Alternative Ranking," Human Relations, vol. 38, pp. 139-149, 2021/07/04 1985.
  • [72] M.J. Culnan, "The Intellectual Development of Management Information Systems, 19721982: A CoCitation Analysis," Management Science, vol. 32, p. 156, 1986.
  • [73] A. a. C. S. a. E.S. Agarwal, "A Neurogenetic approach for the resource-constrained project scheduling problem," Computers and Operations Research, vol. 38, pp. 44-50, 2011.
  • [74] T. a. V.K. a. B.G.V. a. D.C.P. Wauters, "Learning agents for the multi-mode project scheduling problem," Journal of the Operational Research Society, vol. 62, pp. 281-290, 2011.
  • [75] A. Schirmer, "Case-Based Reasoning and Improved Adaptive Search for Project Scheduling," Naval Research Logistics, vol. 47, pp. 201-222, 2000.
  • [76] P. a. R.-R.E. Jedrzejowicz, "Team of a-teams for solving the resource-constrained project scheduling problem," Frontiers in Artificial Intelligence and Applications, vol. 243, pp. 1201-1210, 2012.
  • [77] Y. Ding and B. Cronin, "Popular and/or prestigious? Measures of scholarly esteem," Information Processing & Management, vol. 47, pp. 80-96, 2011.
  • [78] Y. Ding, E. Yan, A. Frazho, and J. Caverlee, "PageRank for ranking authors in co-citation networks," Journal of the American Society for Information Science and Technology, vol. 60, pp. 2229-2243, 2021/07/10 2009.
  • [79] S. Brin and L. Page, "The anatomy of a large-scale hypertextual Web search engine," Computer Networks and ISDN Systems, vol. 30, pp. 107-117, 1998.
  • [80] P. Chen, H. Xie, S. Maslov, and S. Redner, "Finding scientific gems with Google’s PageRank algorithm," Journal of Informetrics, vol. 1, pp. 8-15, 2007.
  • [81] B.K. Pathak, S. Srivastava, and K. Srivastava, "Neural network embedded multiobjective genetic algorithm to solve non-linear time-cost tradeoff problems of project scheduling," Journal of Scientific and Industrial Research, vol. 67, pp. 124-131, 2008.
  • [82] H. Small, "Co-Citation in the Scientific Literature: A New Measure of the Relationship Between Two Documents," Journal of the American Society for Information Science, vol. 24, pp. 265-269, 1973.
  • [83] A. Pilkington and C. Liston-Heyes, "Is production and operations management a discipline? A citation/co-citation study," International Journal of Operations & Production Management, vol. 19, pp. 7-20, 2021/07/14 1999.
  • [84] C. Chen, F. Ibekwe-Sanjuan, and J. Hou, "The Structure and Dynamics of Co-Citation Clusters: A Multiple-Perspective Co-Citation Analysis," Journal of the American Society for Information Science and Technology, vol. 61, pp. 1386- 1409, 2010.
  • [85] A. Pilkington and J. Meredith, "The evolution of the intellectual structure of operations management – 1980- 2006: A citation/co-citation analysis," Journal of Operations Management, vol. 27, pp. 185-202, 2009.
  • [86] L. Leydesdorff, "Bibliometrics/Citation networks," arXiv pre-print server, 2015.
  • [87] B. Hjørland, "Citation analysis: A social and dynamic approach to knowledge organization," Information Processing & Management, vol. 49, pp. 1313-1325, 2013.
  • [88] F. Radicchi, C. Castellano, F. Cecconi, V. Loreto, and D. Parisi, "Defining and identifying communities in networks," Proceedings of the national academy of sciences, vol. 101, pp. 2658-2663, 2004.
  • [89] A. Clauset, M.E.J. Newman, and C. Moore, "Finding community structure in very large networks," Physical Review E, vol. 70, p. 066111, 2004.
  • [90] L. Leydesdorff, "Bibliometrics/citation networks," arXiv preprint arXiv:1502.06378, 2015.
  • [91] V.D. Blondel, J.-L. Guillaume, R. Lambiotte, and E. Lefebvre, "Fast unfolding of communities in large networks," Journal of Statistical Mechanics: Theory and Experiment, vol. 2008, p. P10008, 2008.
  • [92] R. Kolisch and S. Hartmann, "Experimental investigation of heuristics for resource-constrained project scheduling: An update," European Journal of Operational Research, vol. 174, pp. 23-37, 2006.
  • [93] I. Kurtulus and E.W. Davis, "Multi-Project Scheduling: Categorization of Heuristic Rules Performance," Management Science, vol. 28, pp. 161-172, 2021/07/10 1982.
  • [94] R. Kolisch and A. Drexl, "Local search for nonpreemptive multi-mode resource-constrained project scheduling," IIE Transactions, vol. 29, pp. 987-999, 1997.
  • [95] R. Kolisch and A. Drexl, "Adaptive search for solving hard project scheduling problems," Naval Research Logistics (NRL), vol. 43, pp. 23-40, 2021/11/12 1996.
  • [96] G. Confessore, S. Giordani, and S. Rismondo, "A market-based multi-agent system model for decentralized multi-project scheduling," Annals of Operations Research, vol. 150, pp. 115-135, 2007.
  • [97] R.E. Korf, "Real-time heuristic search," Artificial Intelligence, vol. 42, pp. 189-211, 1990.
  • [98] R. Kolisch and R. Padman, "An integrated survey of deterministic project scheduling," Omega, vol. 29, pp. 249- 272, 2001.
  • [99] L.P. Kaelbling, M.L. Littman, and A.W. Moore, "Reinforcement Learning: A Survey," Journal of Artificial Intelligence Research, vol. 4, pp. 237-285, 1996.
  • [100] F.B. Talbot and J.H. Patterson, "An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems," Management Science, vol. 24, pp. 1163-1174, 2021/07/10 1978.
  • [101] D. Debels and M. Vanhoucke, "A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem," Operations Research, vol. 55, pp. 457-469, 2021/07/10 2007.
  • [102] A. Nareyek, "Choosing Search Heuristics by Non-Stationary Reinforcement Learning," vol. 86, 2001.
  • [103] J.-K. Lee and Y.-D. Kim, "Search Heuristics for Resource Constrained Project Scheduling," Journal of the Operational Research Society, vol. 47, pp. 678-689, 1996.
  • [104] P. Brucker, A. Drexl, R. Möhring, K. Neumann, and E. Pesch, "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, vol. 112, pp. 3-41, 1999.
  • [105] J.P. Cohoon, S.U. Hegde, W.N. Martin, and D. Richards, "Punctuated equilibria: a parallel genetic algorithm," presented at the Proceedings of the Second International Conference on Genetic Algorithms on Genetic algorithms and their application, Cambridge, Massachusetts, USA, 1987.
  • [106] J. Liu and K. Sycara, "Multiagent Coordination in Tightly Coupled Task Scheduling," 1996.
  • [107] V. Valls, F. Ballestın, and S. Quintanilla, "Justification and ́ RCPSP: A technique that pays," European Journal of Operational Research, vol. 165, pp. 375-386, 2005.
  • [108] R. Kolisch, "Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation," European Journal of Operational Research, vol. 90, pp. 320-333, 1996.
  • [109] H.S.N. a. D.T. Ndumu, "An introduction to agent technology," Software Agents and Soft Computing Towards Enhancing Machine Intelligence, p. 1, 1997.
  • [110] A. Drexl, "Scheduling of Project Networks by Job Assignment," Management Science, vol. 37, pp. 1590- 1602, 2021/07/04 1991.
  • [111] L. Özdamar and G. Ulusoy, "A Survey on the Resource-Constrained Project Scheduling Problem," Iie Transactions, vol. 27, pp. 574-586, 1995.
  • [112] A. Agarwal, H. Pirkul, and V.S. Jacob, "Augmented neural networks for task scheduling," European Journal of Operational Research, vol. 151, pp. 481-502, 2003.
  • [113] H.V.D. Parunak, "Applications of distributed artificial intelligence in industry," Foundations of distributed artificial intelligence, vol. 2, pp. 1-18, 1996.
  • [114] J. Alcaraz, C. Maroto, and R. Ruiz, "Improving the performance of genetic algorithms for the RCPS problem," Proceedings of the Ninth International Workshop on Project Management and Scheduling, pp. 40-43, 2004.
  • [115] R. Kolisch and A. Sprecher, "PSPLIB – a project scheduling problem library," Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre1996.
  • [116] B.E. Pulk, "Improving software project management," Journal of Systems and Software, vol. 13, pp. 231-235, 1990.
  • [117] K. Bouleimen and H. Lecocq, "A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version," European Journal of Operational Research, vol. 149, pp. 268-281, 2003.
  • [118] J.K. Lenstra and A. H. G. R. Kan, "Complexity of Scheduling under Precedence Constraints," Operations Research, vol. 26, pp. 22-35, 1978.
  • [119] S. Rostami, S. Creemers, and R. Leus, "New strategies for stochastic resource-constrained project scheduling," Journal of Scheduling, vol. 21, pp. 349-365, 2018.
  • [120] M. Wooldridge and N.R. Jennings, "Intelligent agents: theory and practice," The Knowledge Engineering Review, vol. 10, pp. 115-152, 1995.
  • [121] E.W. Davis and J.H. Patterson, "A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling," Management Science, vol. 21, pp. 944-955, 2021/08/02 1975.
  • [122] S. Kirkpatrick, C.D. Gelatt, and M.P. Vecchi, "Optimization by Simulated Annealing," Science, vol. 220, pp. 671-680, 2021/07/04/ 1983.
  • [123] T. Hegazy, "Optimization of Resource Allocation and Leveling Using Genetic Algorithms," Journal of Construction Engineering and Management-asce – J CONSTR ENG MANAGE-ASCE, vol. 125, 1999.
  • [124] T.R. Browning and A.A. Yassine, "Resource-constrained multi-project scheduling: Priority rule performance revisited," International Journal of Production Economics, vol. 126, pp. 212-228, 2010.
  • [125] L. Liu, A. Burns Scott, and C.-W. Feng, "Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method," Journal of Construction Engineering and Management, vol. 121, pp. 446-454, 2021/11/12 1995.
  • [126] S.-S. Leu, C.-H. Yang, and J.-C. Huang, "Resource leveling in construction by genetic algorithm-based optimization and its decision support system application," Automation in Construction, vol. 10, pp. 27-41, 2000.
  • [127] J.F. Gonçalves, J.J.M. Mendes, and M.G.C. Resende, "A genetic algorithm for the resource constrained multiproject scheduling problem," European Journal of Operational Research, vol. 189, pp. 1171-1190, 2008.
  • [128] S.T. Ng and Y. Zhang, "Optimizing Construction Time and Cost Using Ant Colony Optimization Approach," Journal of Construction Engineering and Management, vol. 134, pp. 721-728, 2021/11/12 2008.
  • [129] H. Li and P. Love, "Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization," Journal of Construction Engineering and Management, vol. 123, pp. 233-237, 2021/11/12 1997.
  • [130] D.F. Cooper, "Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation," Management Science, vol. 22, pp. 1186-1194, 2021/08/02 1976.
  • [131] P. Bhupendra, "Project Scheduling using Meta Heuristics," ed, 2007.
  • [132] T. Neligwa, "An HMS Operational Model," Agent-Based Manufacturing, p. 163, 2003.
  • [133] Y. Laili, F. Tao, L. Zhang, Y. Cheng, Y. Luo, and B.R. Sarker, "A Ranking Chaos Algorithm for dual scheduling of cloud service and computing resource in private cloud," Computers in Industry, vol. 64, pp. 448-463, 2013.
  • [134] P. Bhupendra Kumar, S. Harish Kumar, and S. Sanjay, "Multi-resource-constrained discrete time-cost tradeoff with MOGA based hybrid method," in 2007 IEEE Congress on Evolutionary Computation, 2007, pp. 4425-4432.
  • [135] N.J. Nilsson, "Copyright," in Artificial Intelligence: A New Synthesis, ed Oxford: Morgan Kaufmann, 1998, p. iv.
  • [136] G. Lee and R.H. Katz, "Heterogeneity-Aware Resource Allocation and Scheduling in the Cloud," HotCloud, vol. 11, pp. 4-8, 2011.
  • [137] B. Pathak and S. Srivastava, "An intelligent approach for resource-constrained nonlinear multi-objective time-cost tradeoff," vol. 14, ed. DEI Journal of Science and Engineering Research, 2008, pp. 153-163.
  • [138] L. Li, "China's manufacturing locus in 2025: With a comparison of “Made-in-China 2025” and “Industry 4.0”," Technological Forecasting and Social Change, vol. 135, pp. 66-74, 2018.
  • [139] B.K. Pathak and S. Srivastava, "MOGA-based time-cost tradeoffs: Responsiveness for project uncertainties," in 2007 IEEE Congress on Evolutionary Computation, 2007, pp. 3085-3092.
  • [140] F. Peña-Mora and C.-Y. Wang, "Computer-Supported Collaborative Negotiation Methodology," Journal of Computing in Civil Engineering, vol. 12, pp. 64-81, 2021/11/12 1998.
  • [141] A. Naber and R. Kolisch, "MIP models for resource-constrained project scheduling with flexible resource profiles," European Journal of Operational Research, vol. 239, pp. 335-348, 2014.
  • [142] C. Que Bryan, "Incorporating Practicability into Genetic Algorithm-Based Time-Cost Optimization," Journal of Construction Engineering and Management, vol. 128, pp. 139-143, 2021/11/12 2002.
  • [143] S. Oh, D. Lee, and S.R.T. Kumara, "Effective Web Service Composition in Diverse and Large-Scale Service Networks," IEEE Transactions on Services Computing, vol. 1, pp. 15-32, 2008.
  • [144] K. Hans Raj, R. S. Sharma, S. Srivastava, and C. Patvardhan, "Modeling of manufacturing processes with ANNs for intelligent manufacturing," International Journal of Machine Tools and Manufacture, vol. 40, pp. 851-868, 2000.
  • [145] C. Ramos, "A holonic approach for task scheduling in manufacturing systems," in Proceedings of IEEE International Conference on Robotics and Automation, 1996, pp. 2511-2516 vol.3.
  • [146] A.A.B. Pritsker, L.J. Watters, and P.M. Wolfe, "Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach," Management Science, vol. 16, pp. 93-108, 2021/11/12/ 1969.
  • [147] S. Lin and B.W. Kernighan, "An Effective Heuristic Algorithm for the Traveling-Salesman Problem," Operations Research, vol. 21, pp. 498-516, 2021/11/12 1973.
Uwagi
Opracowanie rekordu ze środków MEiN, umowa nr SONP/SP/546092/2022 w ramach programu „Społeczna odpowiedzialność nauki” - moduł: Popularyzacja nauki i promocja sportu (2022-2023).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-f9cff388-ccfe-4207-ae7f-717f6277184f
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.