The frequent causes of ships’ detentions by port authorities are abnormalities of marine power plant functioning. Each extended ship lay time in port results in a waste of ship operating time thus costs rise to ship owners. This is connected with improper marine power plant management. In order to avoid this, a ship engineer should has system supporting his in the managing of the marine power plant at his disposal computer aided. Such a system can be worked out on the condition that a mathematical model, which represents the decision – making process of an engineer has been built. One element of the decision making process in managing the marine engine room is to determine how important is each of the tasks which the operators have to do. This estimation is the base to choose the most important tasks and make optimal schedule with them. The present work shows the approach to the rating method of operating tasks using AHP method. Based on practice, a hierarchic structure of factors influencing a tasks validity in the engine room operating process was made. Next, a preliminary questionnaire was conducted, which put questions to the experts as chief engineers next. This enabled to define numerical values of suitable coefficients influencing on the validity of operating tasks. The equation contains this all coefficients permit to determinate numerical values of an operating task’s validity in given engine room operating processes.
Słowa kluczowe
Wydawca
Czasopismo
Rocznik
Tom
Strony
137--142
Opis fizyczny
Bibliogr. 16 poz., rys.
Twórcy
autor
- Gdynia Maritime University Department of Engineering Sciences Morska Street 81-87, 81-225 Gdynia, Poland
Bibliografia
- [1] Dey, P. K., An integrated assessment model for cross-country pipelines, Environ Impact Assess, Rev 22:703-72, 2002.
- [2] Downarowicz, J., Krause, J., Sikorski, M., Stachowski, W., Chosen methods of ergonomics and science about exploitation, Wydawnictwo PG, Gdańsk 2000.
- [3] Ficoń, K., Badania operacyjne stosowane, modele i aplikacje, BEL Studio, Warszawa 2006.
- [4] Holguin-Veras, J., Comparative assessment of AHP and MAV in highway planning: case study, J Trans Eng, 121(2):191-200, 1993.
- [5] Kamiński, P., Podsiadło, A., Tarełko, W., Computer-aided management of marine power plant, III International Scientifically-Technical Conference Explo-Diesel & Gas Turbine, pp.263-270, Gdansk 2003.
- [6] Kamiński, P., Podsiadło, A., Tarełko, W., Źródła informacji wykorzystywane w systemie wspomagającym zarządzanie eksploatacji siłowni okrętowych, XXV Międzynarodowe Sympozjum Siłowni Okrętowych, pp.73-78, Gdansk 2004.
- [7] Kamiński, P., Identyfikacja elementów problemu decyzyjnego zarządzania siłownią okrętową, Polioptymalizacja i CAD, pp. 94-101, Mielno 2006.
- [8] Kamiński, P., Model dwukryterialnej optymalizacji harmonogramu prac w siłowni okrętowej jako zadaniepakowania, Pomiary Automatyka Kontrola, Vol. 53, pp.25-28, Warszawa 2007.
- [9] Khasnabis, S., Alsaidi, E., Liu, L., Ellis, R. D., Comparative study of two techniques of transit performance assessment: AHP and GAT. J Transp Eng 128(6): 499-508, 2002.
- [10] Kukuła, K., Metoda unitaryzacji zerowanej, Wydawnictwo Naukowe PWN, Warszawa 2004.
- [11] Saaty, T. L., The Analytical Hierarchy Process, McGraw - Hill, New York 1980.
- [12] Sadiq, R., Drilling waste discharges in the marine environment: a risk-based decision methodology, PhD. Thesis, Memorial University of Newfoundland, Canada 2001.
- [13] Suryanto, H., Compton, P., Learning classification taxonomies from a classification knowledge based system, http://ol2000.aifb.unikarlsruhe.de/final/HSuryanto_5.pdf, 2006
- [14] Tarelko, W., Podsiadlo, A., Modelling and developing a decision-making process of hazard zone identification in ship power plants, International Journal of Pressure Vessels and Piping 83 (4), pp. 287-298, 2006.
- [15] Witkowska, D., Artificial neural network and method statistical, Wydawnictwo C. H. Beck, Warszawa 2002.
- [16] Ziara, M., Nigim, K., Enshassi, A., Ayyub, B. M., Strategic implementation of infrastructure priority projects: case study in Palestine, ASCE J Infrastructure System 8(1): 2-11, 2002.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-eadee9d0-2e46-42eb-bdee-3e67a46b645a