Sequencing of ore columns for planning of large underground mines

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Block caving is an underground mining technique which extracts ore from the base, rather than from the top, of typically massive deposits. Mining infrastructure is developed below the deposit before extraction commences. A network of tunnels provides access to a collection of drawpoints from which ore is mucked and hauled. With large deposits, not all drawpoints are developed simultaneously and the opening of drawpoints is sequenced to facilitate orderly extraction of ore columns above drawpoints. Sequencing fixes the initiation point for the entire block cave, or a part of it, as well as identifying the direction of cave advancement. The sequence of opening drawpoints influences the mine economics and is an integral aspect of planning a block cave mine. This paper discusses the optimisation of sequencing based on the net present value associated with extraction over the life-of-mine. It is shown that the maximum attainable net present value is obtained by a sequence in which ore columns are ranked in descending order of value. If significant variation of grade is present inside columns, an iterative procedure is given which corrects the sequence which yields the maximum net present value. The sequence with maximum net present value may not be practical or attractive from a caving perspective. Systematic design of sequences which permit orderly development of a block cave is discussed. To provide context, the net present value obtained from these feasible sequences is compared with the maximum attainable net present value. It is shown that the best feasible sequences in terms of net present value are preferentially initiated in zones with columns of high-grade ore.
Słowa kluczowe
Czasopismo
Rocznik
Tom
Strony
157--171
Opis fizyczny
Bibliogr. 7 poz., rys.
Twórcy
  • University of Exeter, Camborne School of Mines, Penryn TR10 9FE, UK
  • Rio Tinto, 6 St James’s Square, London SW1Y 4AD, UK
Bibliografia
  • CACCETTA L., HILL S.P., 2003, An application of branch and cut method to open pit scheduling, Journal of Global Optimization, 27, 349–365.
  • DIMITRAKOPOULOS R., FARRELLY C., GODOY M., 2002, Moving forward from traditional optimization: grade uncertainty and risk effects in open pit design, Transactions of the Institution of Mining and Metalurgy section A, 111, A82–A88.
  • LAUBSCHER D.H., 1994, Cave mining – the state of the art, Journal of the South African Institute of Mining and Metallurgy, 94, No. 10, 279–293.
  • LERCHS H., GROSSMAN F., 1965, Optimum Design of Open-Pit Mines, Transactions of the CIM, 58, 47–54.
  • KHALOKAKAIE R., DOWD P.A., FOWELL R.J., 2000, The Lerchs–Grossmann algorithm with variable slope angles, Transations of the Institution of Mining and Metallurgy Section A, 109, A77–A85.
  • RAFIEE R., ATAEI M., KHALOKAKAIE R., JALALI S.E., SERESHKI F., NOROOZI M., 2018, Numerical modelling of influence parameters in cavability of rock mass in block caving mines, International Journal of Rock Mechanics and Mining Sciences, 105, 22–27.
  • TROTTER D.A., GODDARD G.J., 1981, Design techniques for sublevel caving layouts, CIM Bulletin, 74, 92–100.
Typ dokumentu