Project completion behind schedule is a struggle for the construction sector, affecting time, cost, and quality. This investigation has been necessitated by the lingering nature of project delay risks despite many extant analyses. This study collated expert opinions from the Thai construction sector on salient construction delay variables and their influence on each other for DEMATEL-SD analysis. The collated data were analysed and found consistent with a Cronbach’s alpha of 0.939. Then, the DEMATEL technique was used to establish the influence weight of factors for the System dynamics (SD) analysis. It was discovered that minimising the design error at the preconstruction stage significantly reduces the magnitude of delay. Increasing values of design error and change order increase the rework profile. Besides, the project delivery within the scheduled 232 weeks can be ensured by minimising the threat of design error, design change, change order, rework, productivity problem, and by improving project management. This study adopted a hybrid mathematical system to holistically examine the construction delay risk by comprehensively exploring the dynamics of influencing variables and investigating their impact on the project scheme. The system helps project stakeholders to arrive at an effective decision in overcoming delay risks, thus minimising the cost overrun and improving the project quality.
Rocznik
Tom
Strony
26--45
Opis fizyczny
Bibliogr. 138 poz., tab., wykr.
Twórcy
- School of Management Technology, Sirindhorn International Institute of Technology, Thammasat University, Thailand
autor
- School of Management Technology, Sirindhorn International Institute of Technology, Thammasat University, Thailand
Bibliografia
- Abbasi, O., Noorzai, E., Jafari, K. G., & Golabchi, M. (2020). Exploring the causes of delays in construction industry using a cause-and-effect diagram: Case study for Iran. Journal of Architectural Engineering, 26(3), 1-16.
- Abeku, D. M., Ogunbode, E. B., Salihu, C., Maxwell, S. S., & Kure, M. A. (2016). Project management and the effect of rework on construction works: A case of selected projects in Abuja metropolis, Nigeria. International Journal of Finance and Management in Practice, 4(1), 2360-77459.
- Ahmed, S. M., Azhar, S. Kappagantula, P., & Gollapudi, D. (2003). Delay in construction: A brief study of the Florida construction industry. ASC Proceedings of the 39th Conference,257-266.
- Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of construction Engineering and Management, 132(7), 667-677.
- Al Amri, T., & Perez, M. M. (2020). Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman. Journal of Project Management, 5(2020), 87-102.
- Alaryan, A., Emadelbeltagi, Elshahat, A., & Dawood, M. (2014). Causes and effects of change orders on construction projects in Kuwait. International Journal of Engineering Research and Application, 4(7), 01-08.
- Alavifar, A. H., & Motamedi, S. (2014). Identification, evaluation, and classification of time delay risks of construction project in Iran. Proceedings of International Conference on Industrial Engineering and Operations Management, 919-929.
- Al-Hams, M. F. (2010). Simulation model of change orders and their impact on building projects performance in Gaza strip. Thesis of Islamic University, Gaza-Palestine, 1-194.
- Alsulaiti A. A., & Kerbache, L. (2020). Analysis of critical delay factors in construction projects with a focus on Qatar. International Journal of Business and Economics Research, 9(3), 130-139.
- Ameh, O. J., & Osegbo, E. E. (2011). Study of relationship between time overrun and pProductivity on construction sites. International Journal of Construction and Supply Chain Management, 1(1), 56-67.
- Ametepey, S. O., Asiedu, G. W. & Kissiedu, M. A. (2017). Causes-effects relationship of construction project delays in Ghana: Focusing on local government projects. Advances in Human Factors, Sustainable Urban Planning and Infrastructure, Advances in Intelligent systems and Computing, 600, 84-95.
- Anastasiu, L. (2018). The decision-making process in construction project management byusing the ELECTRE I method. International Journal of Research. Science & Management, 5(2), 1-14.
- Anysz, H. (2019). Managing delays in construction projects aiming at cost minimization. Material Science and Engineering, 603(2019),1-10.
- Arantes, A., & Ferreira L. M. D. F. (2020). A method for development of delay mitigation measures in construction projects. Production Planning and Control, 1-14.
- Archistar Academy (2020). Top ten design software for architects. Australia.
- Asegie, Y. G. (2019). Causes of construction delay by the perception of professionals and minimizing its effect: the case of North Shoa Zone, Ethiopia. Civil Engineering and Construction Technology (in press).
- Asmitha, P. (2019). Time delay and cost overrun in construction projects. IRE Journal, 3(5), 44-51.
- Aziz, R. F. (2013). Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Engineering Journal, 52, 387-406.
- Bahra, A. (2019). What causes delays and cost overruns on major infrastructure projects. London: Construction Products Association.
- Bassa, M., Reta, A., Alyew, A., & Tora, M. (2019). Causes and effects of design change in building construction projects in three selected southern Ethiopia zone. International Journal of Engineering Research and Technology, 8(12), 757-761.
- Boateng, P., Chen, Z., & Ogunlana, S. (2012). A conceptual system dynamic model to describe the impacts of critical weather conditions in megaproject of construction. Journal of Construction Project Management and Innovation, 2(1), 208-224.
- Bounthipphasert, S., Shozo, N., Toshihiro, O., & Takafunmi, N. (2020). Causes of delays in road construction projects in Laos. The Global Journal of Research in Engineering, 20(3), 1-15.
- Busby, J. S. (2001). Error and distributed cognition in design. Design Studies, 22(3), 233-254.
- Carvalho, A. B., Maues, L. M. F., Moreira, F., & Reis, C. J. L. (2021). Study on the factors of delay in construction works. Amnient Construido, 21(3), 27-46.
- Chaker, F., El Manouar, A., & Idrissi. M. A. J. (2015). Towards a system dynamic modelling method based on DEMATEL. International Journal of Computer Science & Information Technology, 7(2), 28-40.
- Chandrusa, S., & Basha, M. (2017). Rework management in construction projects and comparison with time and cost. International Journal of Engineering Science and Computing, 7(6), 13020-13025.
- Chijindu, A. H. (2018). Delay management in project construction industry in EBONYI State, Nigeria. International Journal of Advance Research in Science, Engineering and Technology, 5(10), 7196-7202.
- Choopojcharoen, T., & Magzari, A. (2012). Mathematics behind system dynamics. United States: Worcester Polytechnic Institute.
- Couto, J. P. (2012). Identifying of the reasons for the project design errors in the Portuguese construction industry. Natural & Applied Sciences, 3(2), 164-170.
- Desai, M., & Bhatt, R. (2013). Critical causes of delay in residential construction project: Case study of central Gujarat region of India. International Journal of Engineering Trends and Technology, 4(4), 762-768.
- Eksander, A. F. Z. (2018). Risk assessment influencing factors for Arabian construction projects using analytic hierarchy. Alexandria Engineering Journal, 57, 4207-4218.
- Emuze, D. D. F. (2018). Resolving client-linked delays in construction projects in India. Journal of Construction Project Management and Innovation, 8(1), 2164-2179.
- Enshassi, A., Sundermeier, M., & Zeiter, M. A. (2017). Factors contributing to rework and their impact on construction projects performance. International Journal of Sustainable Construction Engineering & Technology, 8(1), 12-33.
- Erdogan, S. A., Saparauskas, J., & Turskis, Z. (2016). Decision making in construction management: AHP and expert choice approach. Procedia Engineering, 172, 270-276.
- European Commission. (2018). European construction sector observatory.
- Foord, A. G., & Gulland, W. G. (2006). Can technology eliminate human error. Process Safety and Environmental Protection, 84, 171-173.
- Fuade, D. F., Rahmawati, Y., & Utomo, C. (2017). Factor of design errors in construction project. Regional Conference in Civil Engineering, 284-288.
- Fugar, F. D. K., & Baah, A. A. B. (2010). Delays in building construction projects in Ghana. Australasian Journal of Construction Economics and Build, 10(1/2), 103-116.
- Gascuene, N. V., Astor, E. N., Del-Burgo, J. F., & Fernandez, J. P. R. (2014). Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. Proceedings of 27th Annual ARCOM Conference of Association of Research in Construction and Management, 879-888.
- Gebrehiwet, T., & Luo, H. (2017). Analysis of delay impact on construction project based on RII and correlation coefficient: Empirical study. Proceedia Engineering, 196(2017), 366-374.
- Gonzalez, P., Gonzalez, V., Molenaar, K., & Orozco, F. (2014). Analysis of causes of delay and time performance in construction projects. Journal of construction Engineering and Manage, 140(1), 1-9.
- Halwatura, R. U., & Ranasinghe, N. P. N. P. (2013). Causes of variation orders in road construction projects in Sri Lanka. ISRN Construction Engineering, 1-7.
- Hamzah, N., Khoiry, M. A., Arshad, I., Tawil, N. M., & Ani, A. I. C. (2011). Cause of construction delaytheoretical framework. Procedia Engineering, 20(11), 490-495.
- Hassan, A., Hamza, F., Nikhil, M., & Sufyan, S. (2017). A study in construction delays of residential structures. International Refereed Journal of Engineering Science, 6(6), 42-47.
- Hickson, B. G., & Ellis, L. A. (2014). Factors affecting construction labor productivity in Trinidad and Tobago. The Journal of Association of Professional Engineers of Trinidad and Tobago, 42(1), 4-11.
- Hossain, G. M. S., Huang, W., & Kaium, M. A. (2020). Evaluating critical success factors for adoption decision of e-learning facilities in Bangladesh by using DEMATEL approach. International Journal of e-Education, e-Business, e-Management, and e-Learning, 10(2), 182-204.
- Jajac, N., Marovi, L., & Hanak, T. (2015). Decision support for management of urban transport projects. Gradjevinar, 6(2), 131-141.
- Jayaraman, R. (2021). An empirical study of delays in large engineering projects: An Indian experience. Jindal Journal of Business Research. doi: 10.1177/22786821211000222
- Jordão, A. R., Costa, R., Dias, Álvaro L., Pereira, L., & Santos, J. P. (2020). Bounded rationality in decision making: an analysis of the decision-making biases. Business: Theory and Practice, 21(2), 654-665. doi: 10.3846/btp.2020.11154
- Jussila, J., & Lahtinen, K. (2019). Effects of institutional practices on delays in construction-views of Finnish homebuilder families. Housing Studies, 35(7), 11671193.
- Kakha, G., Tabasi, S., Jami, M., & Narooei, K. D. (2019). Evaluation of the impacting factors on sustainable mining development, using the grey decision-making trial and evaluation laboratory approach. International Journal of Engineering, 32(10), 1497-1505.
- Kamandang, Z. R., & Casita, C. B. (2018). Delay in construction project: A review. Journal of Proceedings Series, 6(2018), 135-140.
- Karthik, D., & Rao, C. B. K. (2018). The analysis of essential factors responsible for loss of labor productivity in building construction projects in India. Engineering Journal, 23(2), 56-70.
- Kaushik, S., & Somvir. (2015). A method for research in library and information science. International Journal of Librarianship and Administration, 2, 179-185.
- Kazaz, A., Ulubeyli, S., & Tuncbilekli, N. A. (2012). Causes of delays in construction projects in Turkey. Journal of civil Engineering and Management, 18(3), 426-435.
- Keane, P., Sertyesilisik, B., & Ross, A. D. (2010). Variations and change orders on construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering Construction, 2(2), 89-96.
- Kesavan, M., Gobidan, N., & Dissanayake, P. (2017). Analysis of factors contributing civil engineering construction project delays in Sri Lankan building construction industries. Journal of Industrial Engineering Research, 1(7), 5-11.
- Khahro, S. H., & Memon, Z. A. (2018). Non excusable delays in construction industry: A causal study. Engineering Technology Applied Science Research, 8(6), 3561-3564.
- Khaled, A. J., Panlo, F. G., & Luis, F. G. B. (2020). Factors influencing construction projects delay: An exploratory study at a Jordanian public university. International Congress of Project Management and Engineering, 24, 1-14.
- Khattri, T., Agarwal, S., Gupta, V., & Pandey, M. (2016). Causes and effects of delay in construction project. International Research Journal of Engineering and Technology (IRJET), 3, 564-566.
- Khoso, A. R., Khan, J. S., Faiz, R. U., & Akhund. M. A. (2019). Assessment of change order attributes in preconstruction and construction phase. Civil Engineering Journal, 5(3), 616-623.
- Kim, D. H. (1999). Introduction to systems thinking. Pengasus Communication, Inc.
- Kolbel, S., Ossadnik, W., & Gergeleit, S. (2017). Performance management by causal mapping: An application field of knowledge management. Knowledge Management Strategies and Applications. doi: 10.5772/intechopen.70297
- Kusakci, A. O., Ayvaz, B., & Bejtagic, E. (2017). An analysis of causes and effects of delays in construction projects in Libyan oil industry. Karaelmas Fen ve Mühendislik Dergisi, 7(1), 274-282.
- Larsen, J. K., Shen, G. Q, Lindhard, S. M., & Bruno, T. D. (2016). Factors affecting schedule delay, cost overrun, and quality level in public construction projects. Journal of Management in Engineering, 32(1), 1-28.
- Lessing, B., Thurnell, D., & Durdyev, S. (2017). Main factors causing delays in large construction projects: Evidence from New Zealand. Journal of Management, Economics, and Industrial Organization, 1(2), 63-82.
- Liu, M., Le, Y., Hu, Y., Skitmore, M., & Gao, X. (2019). System dynamics modelling for construction management research: Critical review and future trends. Journal of Civil Engineering and Management, 25(8), 730-741.
- Lonergan, A. J. (2018). Fundamentals of construction contracts: Scheduling and delay issues. Demand Construction Services, Inc.
- Love, P. E. D., & Smith, J. (2003). Benchmarking, benchaction, and benchlearning: Rework mitigation in projects. Journal of Management in Engineering, 19(4), 147-159.
- Love, P. E. D., Edwards, D. J., & Irani, I. (2008). Forensic Project Management: An exploratory examination of the causal behavior of design-induced rework. IEEE Transactions on Engineering Management, 55(2), 234-247.
- Mahamid, I. (2016). Analysis of rework in Residential building projects in Palestine. Jordan Journal of Civil Engineering, 10(2), 197-208.
- Maryani, A., Wignjosoebroto, S., & Partiwi, S. G. (2015). A system dynamics approach for modelling construction accidents. Industrial Engineering and Service Science, 392-401.
- Masood, R., Ali, M., Shafique, F., Shafique, M. A., Zafar, B., Maqsoom, & Ullah, Z. (2015). Investigating the delay factors of construction projects in metropolitan city of a developing country. Journal of Civil Engineering and Architectural Research 2(9), 947-955.
- Matheu, N. F. (2005). Life cycle document management system for construction. Doctoral Thesis submitted to Escola Technica Superior d’Enginyeria Industrial de Terrasa, Department d’Enginyeria de la Construccio.
- Memon, A. H. (2014). Contractor perspective on time overrun factors in Malaysian construction projects. International Journal of Science and Environmental Technology, 3(3), 1184-1192.
- Mirshekarlou, B. R. (2012). A taxonomy for causes of changes in construction. A Thesis to Graduate School of Natural and Applied Sciences of the Middle East Technical University, Turkey.
- Mittal, Y. K., & Paul, V. K. (2018). Identification of critical factors for delay in metro rail project in India. International Journal of Students’ Research in Technology Management, 6(1), 30-39.
- Mizanur, R. M. D., Dai, L. Y., & Khanh, H. D. (2014). Investigating main causes for scheduledelay in construction projects in Bangladesh. KICEM Journal of Construction Engineering and Project Management, 4(3), 33-46.
- Mohiuddin, M., Halilem, N., Kobir, S. M. A., & Yuliang. C. (2017). Performance management by causal mapping: An application field of knowledge management. Knowledge Management Strategies and Applications. doi: 10.5772/intechopen.70297
- Moradi, S., Nasirzadeh, F., & Golkhoo, F. (2017). Modelling labor productivity in construction projects using hybrid SD-DES approach. Scientia Iranica, 24(6), 2752-2761.
- Motaleb, O., & Kishk, M. (2011). An investigation into causes and effects of construction delays in UAE. ARCOM Conference, 1149-1157.
- Mydin, M. A. O., Sani, N. M., Taib, M., & Alias, N. M. (2014). Imperative causes of delays in construction projects from developers’ outlook. MATEC Web of Conferences, 06005, 1-26.
- Najafabadi, E. A., & Pimplikar, S. S. (2013). The significant causes and effects of delays in Ghadir 2206 residential project. IOSR Journal of Mechanical and Civil Engineering (IOSR_JMCE), 7(4), 75-81.
- Nundwe, M., & Mulenga, M. (2017). Delays in construction of electrical power transmission lines in Zambia. American Academic Scientific Research Journal for Engineering, Technology, and Sciences, 30(1), 82-96.
- Ogano, N. O. (2016). A system dynamics approach to managing project risks in the electricity industry in sub–Saharan Africa. Doctoral Thesis submitted to Graduate School of Technology Management, Faculty of Engineering, Built Environment and Information Technology, University of Pretoria.
- Ogunlana, O., Li, H., & Sukhera, F. A. (2003). System dynamics approach to exploring performance enhancement in a construction organization. Journal of construction Engineering and Management, 129(5), 528-536.
- Owolabi, J. D., Amusan, L. M., Oloke, C. O., Olusanya, O., Olayeni, T.P., Owolabi, D., Peter, J., & Omuh, I. (2014). Causes and effect of delay on project construction delivery time. International Journal of Education and Research, 2(4), 197-208.
- Paray, W. A., & Kumar, C. (2020). Delay analysis in construction projects. International Research Journal of Engineering and Technology (IRJET), 7(10), 477-479.
- Pourrostam T., & Ismail, A. (2011). Study of methods for minimizing construction delays: Evidence froma developing country. Advances in Mathematical Research, 201-203, 2939-2942.
- Purdue University. (2021). Project management job description.
- Qaytmas, N. (2020). Causes of delays in construction projects in Fayab/Afghanistan. International Journal for Research in Applied Sciences and Biotechnology, 7(6), 72-77.
- Rahman, I. H. R. (2018). Effects of construction delays on project time overrun. IPM Professional Services, 1-2.
- Rahmandad, H., & Hu, K. (2010). Modelling the rework cycle: capturing multiple defects per task. System Dynamics Review, 26(4), 291-315.
- Ramli M. Z., Abidin, M. Z. Z., Hamid, N. B., Razman, R., & Nam, N. O. (2021). Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII). AIP Conference Proceedings, 020114.
- Rezahoseini, A., Noori, S., Ghannadpour, S. F., & Bodaghi, M. (2019). Reducing rework and increasing the civil projects quality, through total quality management (TQM), by using the concept of building information modelling (BIM). Journal of Industrial Systems Engineering, 12, 1-27.
- Rojas, E. M., & Aramvareekul, P. (2003). Labor productivity drivers and opportunities in the construction industry. Journal of Management in Engineering, 19(2), 78-82.
- Salhi, R., & Messaoudi, K. (2021). The effect of delays in Algerian construction projects: An empirical study. Civil and Environmental Engineering Report, 31(2), 218-254.
- Samani, B. A. (2012). A fuzzy systematic approach to construction risk analysis. Journal of Risk Analysis and Crisis Response, 2(4), 275-284.
- Samarah, A., & Bekr, G. A. (2016). Causes of delay in public construction projects in Jordan. American Journal of Engineering Research, 5(5), 87-94.
- Saxena, H., & Tomar, P. S. (2018). Causes and Effects of delays in Indian construction projects. Journal of Advances in Scholarly Research and Allied Education, 15(9), 231-242.
- Seboru, M. A. (2015). An investigation into factors causing delays in road construction projects in Kenya. American Journal of Civil Engineering, 3(3), 51-63.
- Seker, S., & Zavadskas, E. K. (2017). Application of fuzzy DEMATEL method for analyzing occupational risks on construction sites. Sustainability, 9, 1-19.
- Seran, S. L., Galindo, I. P., Cabrera, A. G., & Torres, A. (2017). Identifying factors causing delays and cost overruns in construction projects in Colombia. Ingenieria y Ciencia, 14(27), 117-151.
- Sha, M. K., Shahi, P. B., Pandit, R., & Pandey, A. (2017). Causes and effects of delays in construction projects. IOSR Journal of Mechanical and. Civil Engineering, 14(2), 52-58.
- Shahsavand, P., Marefat, A., & Parchamijalal, M. (2018). Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering Construction and Architectural Management, 1-39.
- Shamsudeen, M., & Obaju, N. B. (2016). Effects of design errors on construction projects. International Journal of Science and Engineering Research, 7(2), 1099-1114.
- Shieh, J. I., Wu, H. H., & Huang, K. K. (2010). A DEMATEL method in identifying key success factors of hospital service quality. Knowledge-based System, 23, 277-282.
- Si, S. L., You, X. Y., Liu, H. C., & Zhang, P. (2018). DEMATEL technique: A systematic review of the state-ofthe- art literature on methodologies and applications. Mathematical Problems in Engineering, 1-33.
- Sohu, S., Chandio, A. F., & Kaleemullah. (2019). Identification of causes and minimization of delays in highway projects of Pakistan. Mehran University Research Journal in Engineering and Technology, 38(1), 103-112.
- Soliman, E. (2017). Construction projects delay causes- economical and industrial effect. International Journal of Engineering Research and Technology, 6(3), 95-103.
- Sounmphonphakdy, B., Nakamura, S., Okumatsu, T., & Nishikawa, T. (2020). Causes ofdelays in road construction projects in Laos.” Global Journal of Research in Civil, and Structural Engineering, 20(3), 1-15.
- Sterman, J. (2000). Business dynamics: Systems thinking and modelling for the complex world. Boston: McGrawhill.
- Suleiman, I. J., & Luvara, V. G. M. (2016). Factors influencing change of design of building Projects during construction stage in Dar-es-salaam Tanzania. International Journal of Construction Engineering and Management, 5(4), 93-101.
- Sullivan, A., & Harris, F. C. (1986). Delays on large construction projects. International Journal of Operation & Production Management, 6(1), 25-33.
- Sun, M., & Meng, X. (2009). Taxonomy for change causes and effects in construction projects. International Journal of Project Management, 27, 560-572.
- Susanty, A., Sari, D. P., Rinawati, I. I., Purwaningsih, R., & Sjawie, F. H. (2019). Policy making for GSCM implementation in the wooden furniture industry. Management of Environmental Quality: An International Journal, 30(5), 925-944.
- Suslov, S., & Katalevsky, D. (2019). Modelling and simulation toolset. Evolving Toolbox for Complex Project Management, 417-448.
- Suther, G. N. R. A. (1998). Evaluating the perception of design errors in the construction industry. A Report Presented to the Graduate Committee of the Department of Civil Engineering, University of Florida, 1-57.
- Szafranko, E. (2015). Evaluation of variant construction projects supported by expert opinion system based on multi-criteria methods. International Journal of New Technologies in Science and Engineering, 2(5), 39-46
- Szafranko, E. (2017). Decision problems in management of construction projects. IOP Conference Series: Materials Science and Management, 251, 1-8.
- Tafazzoli, M. P. P., & Shrestha. (2017). Investigating causes of delay in U.S. construction projects. ASC Annual International Conference Proceedings, 53, 611-621.
- Tahir, M. M., Haron, N. A., Alias, A. H., & Diugwu, I. A. (2019). Causes of delay and cost overrun in Malaysian construction industry. Lecture Notes in Civil Engineering, 9, 47-57.
- Teplická, K., Hrehová, D., & Ševela, M. (2021). Improvement the processes in order production in construction industry with the orientation on processes performance. Polish Journal of Management Studies, 24(1), 407-427.
- Timilsina, S. P., Ojha, S. K., & Dhungana, B. R. (2020). Causes of delay in construction of motorable bridges under design and build model of bridge project, department of roads, Nepal. Modern Economy, 11(8), 1451-1462.
- Toor, S. U. R., & Ogunlana, S. O. (2008). Problems causing delays in major construction project in Thailand. Construction Management and Economics, 26(4), 395-408.
- Tosniwal, R. B., Vanakudari, S. U. (2018). Delay analysis and its effects in construction industry. International Research Journal of Engineering and Technology (IRJET), 5(7), 121-127.
- Tsai, S. B., Hunag, C. Y., Wang, C. K., Chen, Q., Pang, J., Wang, G., Wang, J., Chin, T. C., & Chang, L. C. (2016). Using a mixed model to evaluate job satisfaction in high-tech industries. Plos One, 11(5), 1-13.
- Vetrova, E., Doroshenko, S., Tihomirov, N., Khakimova, G., & Kakava, L. (2020). Model of investment decision- making in a small industrial enterprise. Forum Scientiae Oeconomia, 7(4), 7-23.
- Vishal, & Myneni, M. K. K. (2021). Causes and impact of delay in construction industry of India. International Journal of Engineering Technologies and Management Research, 8(1), 35-44.
- Wu, H. H., & Tsai, Y. N. (2011). A DEMATEL method to evaluate the causal relations among criteria in auto spare parts industry. Applied Mathematics and Computation, 218, 2334-2342.
- Wu, H. H., Chen, H. K., & Shieh, J. I. (2010). Evaluating performance criteria of employment service outreach program personnel by DEMATEL method. Expert System with Application, 37, 219-5223.
- Yadav, A., Kumar, A., & Dash, M. K. (2016). Using DEMATEL to build decision model of online reputation management. In A. Kumar, & M. K. Dash (eds.), Fuzzy optimization and multi-criteria decision making in digital marketing (pp. 127–146). IGI Global.
- Yana, A. A. G. A., Rusdhi, H. A., & Wibowo, M. A. (2018). Analysis of factors affecting design changes in construction project with partial least square (PLS). International Conference of Euro Asia Civil Engineering Forum, 125, 40-45.
- Yu-jing, W. (2012). Application of system dynamics in construction project planning and control. International Conference on Business Computing and Global Informatization, 52-54.
- Zarei, B., Sharifi, H., & Chaghouee, Y. (2018). Delay causes analysis in complex construction projects, a semantic network analysis approach. Production Planning and Control, 1-27.
- Zen, Z., Atout, M., & Jones, J. (2008). Root causes of construction project delays in Dubai. Annual ARCOM Conference, 749-757.
- Zhang, D. (2020). Causes of delay in the construction projects of subway tunnel. Advanced Mathematical Risk Analysis in Civil Engineering. doi: 10.1155/2020/8883683
- Zidane, Y. J. T, & Andersen, B. (2018). The top 10 universal delay factors in construction projects. International Journal of Managing Project Business. doi: 10.1108/IJMPB-05-2017-0052
Uwagi
Opracowanie rekordu ze środków MEiN, umowa nr SONP/SP/546092/2022 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2022-2023).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-e4382efe-d2e9-4ea0-a610-669f9097f845