PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Evaluation of efficiency of working time of equipment in blast furnace department

Autorzy
Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Purpose: The main aim of the paper is the evaluation of efficiency of working time of equipment in blast furnace department with the use of Overall Equipment Effectiveness (OEE) and PAMCO method. Design/methodology/approach: The investigation was made for blast furnace department in Polish steel plant. Two methods: OEE and PAMCO was used. The analysis covers the period of 7 years. The analysis was made based on different data: different types of time connected whit work of blast furnaces, interruption in blast furnace work, level of pig iron production, unit production time and quantity of non-conformance production. Findings: Performed research made it possible to determine the level of efficiency of blast furnace department. It can be concluded that working time in this department is used efficient. Factors that reduce efficiency are usually not-dependent on the company: mainly are connected with the situation on the steel market. Research limitations/implications: It is necessary to continue the research in order to assess individual blast furnaces. That analysis may enable to show if these units has the same level of efficiency and if they are affected by the same factors in the same way. Practical implications: Optimal utilization of capacity and working time of machines and equipment are important for the reduction of production costs. Use of OEE and PAMCO methods helps to assess the level of efficiency of working time and allow to find factors that has great importance for level of efficiency. Originality/value: Results of this analysis can be taken into consideration by blast furnace department under study. Analysis can help to assess the level of efficiency and find factors that influence on it.
Rocznik
Strony
876--880
Opis fizyczny
Bibliogr. 8 poz., rys., tab.
Twórcy
autor
  • Department of Production Management and Logistics, Faculty of Materials Processing Technology and Applied Physics, Czestochowa University of Technology, ul. Dąbrowskiego 69, 42-200 Częstochowa, Poland
Bibliografia
  • [1] W. Sabela, P. Brzeziński, J. Buzek, Factors affecting the cost of obtaining of metallic iron, Metallurgy - Metallurgical Engineering News 72/10 (2005) 490-496.
  • [2] E. Kardas, Technical - economic analysis of pig iron production, Materials Science Forum 638-642 (2010) 3291-3296.
  • [3] K. Mülheims, M. Peters, H. B. Lüngen, Review of ECSC research work in ironmaking, Steel Research 75/2 (2004) 84-92.
  • [4] M. Gawron, R. Badora, W. Sabela, A. Konstanciak, 26 years of working of blast furnaces in Katowice Steel Plant, Metallurgy -Metallurgical Engineering News 71/1 (2004) 2-7.
  • [5] J. Czerska, Improving of value stream, Printing Huose Difin Warsaw, 2009.
  • [6] S. Borkowski, R. Ulewicz, Production management. Production systems, Printing House Humanitas, Sosnowiec, 2009.
  • [7] S. Borkowski, M. Konstanciak, W. Rutkowski, Chapter 8, Exploitation of machines used in production of vibrating plate, TPM and PAMCO coefficient as basis of estimation of machines exploitation efficiency, Ed. and Sci. Elabor S. Borkowski, V. Krocko, Publish PSPSPU, 2008, 53-58.
  • [8] J. Selejdak, M. Konstanciak, K. Mielczarek, Chapter 3, Evaluation of technological efficiency and up-to-dateness of machines used in building industry, Operating efficiency and machines modernity, Ed. and Scientific Elaboration S. Borkowski, J. Selejdak, Publisher Endi Miletić, Sisak, 2010, 33-46.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-e41aaa9e-e1d5-4d7c-9679-283c91bf9e28
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.