Implementation of deviation analysis method in the utilisation phase of the investment project : a case study

Treść / Zawartość
Identyfikatory
Warianty tytułu
PL
Implementacja metody analizy odchylenia w fazie użytkowania projektu inwestycyjnego : studium przypadku
Języki publikacji
EN
Abstrakty
EN
Management of investment projects incorporates phases of pre-investment, investment and utilisation. A well-conducted pre-investment and investment phases reduce the risk of problems that might occur in the utilisation phase, but cannot be eliminated entirely, as the development of internal and external assumptions may not be consistent with the plan. Therefore, even in the utilisation phase, it is necessary to analyse the economic results actually achieved with planned one. The article presents application of the deviation analysis method in the utilisation phase of the assessed investment project. Net Present Value (NPV) deviation analysis is focused on the EBITDA indicator and supplemented by specifying the causes of deviations. The results of the study show that deviations of NPV are caused mainly by lowering the production volume of both products and by a decrease in variable costs per unit. The presented measures lead to the reduction in the probability of the deviations occurrence.
PL
Zarządzanie projektami inwestycyjnymi obejmuje etapy: przedinwestycyjny, inwestycjny i wykorzystania. Dobrze prowadzone fazy przedinwestycyjne i inwestycyjne zmniejszają ryzyko pojawienia się problemów, które mogą wystąpić w fazie wykorzystania. Nie można ich jednak całkowicie wyeliminować, ponieważ rozwój wewnętrznych i zewnętrznych założeń może nie być zgodny z planem. Dlatego też, nawet w fazie wykorzystania, konieczne jest dokonanie porównania wyników ekonomicznych faktycznie osiągniętych z planowanymi. W artykule przedstawiono zastosowanie metody analizy odchylenia w fazie wykorzystania projektu inwestycyjnego. Analiza odchylenia wartości bieżącej netto (NPV) koncentruje się na wskaźniku EBITDA i uzupełniona jest poprzez określenie przyczyn odchyleń. Wyniki badania wskazują, że odchylenia wartości bieżącej netto spowodowane są głównie przez obniżenie wielkości produkcji obu produktów i zmniejszenie kosztów zmiennych na jednostkę. Prezentowane działania prowadzą do zmniejszenia prawdopodobieństwa występowania odchyleń.
Rocznik
Strony
99--109
Opis fizyczny
Bibliogr. 15 poz., rys., tab.
Twórcy
autor
  • Technical University of Kosice
autor
  • Technical University of Kosice
  • Technical University of Kosice
autor
  • Technical University of Kosice
autor
  • Technical University of Kosice
Bibliografia
  • 1. Alias Z., Zawawi E., Yusof K., 2014, ScienceDirect Determining Critical Success Factors of Project Management Practice: A conceptual framework, "Procedia - Social and Behavioral Sciences", 153.
  • 2. Azzone G., Maccarrone P., 2001, The design of the investment post-audit process in large organisations: evidence from a survey, "European Journal of Innovation Management", 4(2).
  • 3. Badewi A., 2016, The impact of project management (PM) and benefits management (BM) practices on project success: Towards developing a project benefits governance framework, "International Journal of Project Management", 34.
  • 4. Drábek J., Merková M., 2015, The Importance of Investment Audit for the Company, "Procedia Economics and Finance", 34.
  • 5. Janekova J., Fabianova J., Rosova A., 2016, Enironmental and economic aspects in decision making of the investment project “Wind park”, "Polish Journal of Management Studies", 13(1).
  • 6. Kotulič R., Kiraly P., Rajčániová M., 2010, Finančná analýza podniku, (2nd ed.), Iura Edition.
  • 7. Kotulič R., 2014, Vybrané metodické prístupy k pyramídovému rozkladu rentability majetku pre potreby riadenia firmy, [In:] Scientific papers of the University of Pardubice: Series D 32(3).
  • 8. Lefley F., 2016, An exploratory study of the post-audit practices of large UK organisations: the way forward, "Management Decision", 54(5).
  • 9. Lendo-Siwicka M., Połoński M., Pawluk K., 2016, Identification of the Interference in the Investment Process During the Realization of a Shopping Centre - A Case Study, "Archives of Civil Engineering", 62(1).
  • 10. Neale C., 1991, The benefits derived from post-auditing investment projects, "Omega", 19(2-3).
  • 11. Sandström J., Kyläheiko K., Collan M., 2016, Managing uncertainty in long life cycle investments: unifying investment planning, management, and post-audit with a fuzzy DSS, "International Journal of Business Innovation and Research", 11(1).
  • 12. Scholleová H., 2009, Investiční controlling. Jak hodnotit investiční záměry a řídit podnikové investicie, (1st ed.), Grada Publishing.
  • 13. Skrodzka W., 2015, The assessment of the efficiency of investment in the shares of the Polish IT sector, "Polish Journal of Management Studies", 12(1).
  • 14. Soares J.O., Coutinho M.C., Martins, C.V., 2007, Forecasting Errors in Capital Budgeting: A Multi-Firm Post-Audit Study, "The Engineering Economist", 52(1).
  • 15. Todorović M.L. et al., 2015, Project success analysis framework: A knowledge-based approach in project management, "International Journal of Project Management", 33.
Uwagi
Opracowanie ze środków MNiSW w ramach umowy 812/P-DUN/2016 na działalność upowszechniającą naukę (zadania 2017).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-dae43fd5-a537-4704-9587-8ae6f3dfd0f5
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.