Powiadomienia systemowe
- Sesja wygasła!
- Sesja wygasła!
Tytuł artykułu
Treść / Zawartość
Pełne teksty:
Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
Land surveying is one of the elements of the execution of construction works. These include, among others, the establishment of a horizontal and vertical geodetic control network, an inventory of the existing area, development of a road project and setting out the location of the road in the area. In order to avoid mistakes, construction works should be controlled as part of surveying works during the implementation of a given project. The article attempts to identify and quantify risk factors occurring during surveying at the stage of preparing data from a detailed design. Two proprietary methods have been presented to calculate both the probability value and the consequences of individual risk factors. The advantage of the presented analyzes is the fact that the acquired validity hierarchy of risk factors, expressed in numerical values, can be explained in a scientific way, rather than referring only to possessed knowledge, experience and intuition.
Czasopismo
Rocznik
Tom
Strony
195--200
Opis fizyczny
Bibliogr. 20 poz., il., tab.
Twórcy
autor
- General Tadeusz Kościuszko Military University of Land Forces, Wrocław , Poland
autor
- General Tadeusz Kościuszko Military University of Land Forces, Wrocław , Poland
autor
- General Tadeusz Kościuszko Military University of Land Forces, Wrocław , Poland
autor
- Surveying Department, STRABAG Infrastruktura Południe Sp. z o.o., Wrocław, Poland
Bibliografia
- 1. A. Duchaczek, D. Skorupka, A Risk Assessment Method of Bridge Facilities Damage in the Aspect of Potential Terrorist Attacks. Periodica Polytechnica-Civil Engineering, vol. 60, issue 2, pp. 189-198 (2016)
- 2. A. Duchaczek, D. Skorupka, Risk Assessment as a Safety Element in Temporary Bridge Exploitation. European Journal of Environmental and Civil Engineering, vol. 21, issue 10, pp. 1253-1269 (2017)
- 3. A. Duchaczek, D. Skorupka, Ilościowe określenie preferencji decydenta podczas oceny ryzyka eksploatacji mostów. Czasopismo Materiały Budowlane, no 8, pp. 103-105 (2017)
- 4. A. Duchaczek, D. Skorupka, The Optimisation of the Selection of Means of Transport for the Implementation of Chosen Construction Projects. KSCE Journal of Civil Engineering (2018)
- 5. A. Leśniak, E. Plebankiewicz, Opóźnienia w robotach budowlanych. Zeszyty Naukowe Wyższej Szkoły Oficerskiej Wojsk Lądowych, vol. 3 (157), pp. 332 - 339 (2010)
- 6. B. A. K. S. Perera, I. Dhanasinghe, R. Rameezdeen, Risk management in road construction: the case of Sri Lanka. International Journal of Strategic Property Management, vol. 13(2), pp. 87-102 (2009)
- 7. D. Skorupka, D. Kuchta, Metody oceny ryzyka w przedsięwzięciach budowlanych (2013)
- 8. D. Skorupka, A. Duchaczek, M. Kowacka, Determining the Hierarchy of Selected Geodetic Risk Factors for Linear Ventures, W: Proceedings of the International Conference on Numerical Analysis and Applied Mathematics 2017, Thessaloniki, Greece, September pp. 25-30 (2017)
- 9. D. Skorupka, M. Kowacka, Identification of risk factors of development and operation of roads in the light of surveying work. Archives of Civil Engineering, vol. 62, issue 2, pp. 183-190 (2016)
- 10. D. Vose. Risk analysis: a quantitative guide. John Wiley & Sons (2008)
- 11. E. Ignasiak, Badania operacyjne. Państwowe Wydawnictwo Ekonomiczne, Warszawa (2001)
- 12. M. Ghorbani, M. Sharifzadeh, S. Yasrobi, M. Daiyan, Geotechnical, structural and geodetic measurements for conventional tunnelling hazards in urban areas – The case of Niayesh road tunnel project. Tunnelling and Underground Space Technology, vol. 31, pp. 1-8 (2012)
- 13. M. Książek, Analiza porównawcza wybranych metod wielokryterialnych oceny przedsięwzięć inwestycyjnych, Budownictwo i inżynieria środowiska, Politechnika Białostocka, No 2, pp. 555-561 (2011)
- 14. M. Kuburić, M. Lero, Surveying works in road designing and construction, Journal of Applied Engineering Science (Istraživanja i projektovanja za privredu), vol. 9, no. 3, pp 393-400 (2011)
- 15. O. Kapliński, Usefulness and credibility of scoring methods in construction industry, Journal of Civil Engineering and Management, vol. 14, pp. 21-28 (2008)
- 16. P. Jaśkowski, A. Sobotka, Scheduling construction projects with resources accessibility limited and changeable in time, Journal of Civil Engineering and Management, vol. 10, pp. 267-276 (2004)
- 17. R. Navon, Y. Shpatnitsky, A model for automated monitoring of road construction. Construction Management and Economics, vol. 23, iss. 9, pp. 941-951 (2005)
- 18. R. Sturk, L. Olsson, J. Johansson, Risk and decision analysis for large underground projects, as applied to the Stockholm ring road tunnels. Tunnelling and Underground Space Technology, vol. 11(2), pp. 157-164 (1996)
- 19. T. Kasprowicz, Inżynieria przedsięwzięć budowlanych. Wydział Inżynierii, Chemii i Fizyki Technicznej Wojskowej Akademii Technicznej (2002)
- 20. W. Bożejko, Z. Hejducki, M. Rogalska, P. Rajba, M. Wodecki, Harmonogramowanie robót budowlanych w systemie potokowym z niepewnymi danymi, Zeszyty Naukowe Wyższa Szkoła Oficerska Wojsk Lądowych im. gen. Tadeusza Kościuszki, No. 4 (166), 80-95 (2012)
Uwagi
Opracowanie rekordu w ramach umowy 509/P-DUN/2018 ze środków MNiSW przeznaczonych na działalność upowszechniającą naukę (2019).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-d047099c-feb5-4be9-98e3-be744f4cb93e