Utilization of renewable resources in rehabilitation of existent Micro-Hydropower plants

Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
Konferencja
Communication Papers of the 2017 Federated Conference on Computer Science and Information Systems
Języki publikacji
EN
Abstrakty
EN
In Romania, during 1980-1990 were built over 600 Micro-Hydro-power Plants, having as principal purpose the electrical power supply for the isolated areas or the soil irrigation. After 25 years, less than half of them are still functional, because there was not made any investments regarding their maintenance and rehabilitation. Among these, over 150 are technologically old, and with parameters far outdone from their initial values. In the present context regarding the utilization of renewable resources in Romania, starting with 2005 there was held a constant campaign for monitoring the environmental data, in order to locate the economically favorable zones to implement a wind power plant or a photo-voltaic, connected to an existent small hydro-power plant, needed to be rehabilitated. The paper aims to present such a pilot plant, built near a Small hydro-power plant, which was decommissioned in 1998. In 2014-2016 there was built the first pilot station having connected a wind power plant of own production, a photo-voltaic and a small hydro-power plant, able to supply the electric power. The wind power plant is equipped with a rotor able to start at low values of the wind speed, < 0.4 m/s. In the first phase were built the wind turbine and implemented the available solar panels. Electrical current was used for the first steps in the rehabilitation of the SHP. There were trimmed and cleaned the vegetation increased, and conducted onsite the cement for the reconstruction of channels for water supply and further from to river.\par In this paper are first presented the selected parameters (environmental, geographic and economic conditions) necessary to establish a good position to implement such a pilot station, as to prove, its efficiency. The theoretical modeling and physical realization of the pilot power plant station, the conditions needed to be satisfied for coupling these three resources of energy are mentioned. Further are also presented part of the obtained results during the first 6 months since the project was realized. Finally, there are mentioned some observations, some problems which appeared during the functioning and how we intend to extend this plan to other six sites, as a first step.
Słowa kluczowe
Rocznik
Tom
Strony
133--140
Opis fizyczny
Bibliogr. 11 poz., fot., rys., tab., wykr.
Twórcy
  • University Politehnica of Bucharest, Department of Hydraulics, Hydraulic machinery and Environmental engineering, Splaiul Independentei 313, Sector 6 Bucharest, Romania
Bibliografia
  • 1. B. Popa, “Hidroenergetica, Microhidrocentrale”, Hydroenergy, Small hydropower plants, University Politehnica of Bucharest, 2009.
  • 2. A. Osinowo, E. C. Okogbue, all, “Analysis of Global Irradiance over Climatic Zones in Nigeria for solar Energy Applications”, Journal of Solar Energy, Vol. 2015, ID 819307.
  • 3. V. Khare, S. Nema, P. Baredar, “Optimization of the hybrid renewable energy system by HOMER, PSO and CPSO for the study area”, Int. Journal of Sustainable Energy, vol. 36, Issue 4, pp. 326-343, 2015, http://dx.doi.org./10.1080/144786451.2015.1017500.
  • 4. P. G. Oguntunde, A. Babatunde, “A numerical modeling study of the hydro-climatology of the Niger River basin, West Africa” Hydrological Sciences Journal, vol. 61, 2016 Issue 1, doi: 10.1080/02626667.2014.980260.
  • 5. M. Cruz-Zambrano, C. Corchero, “The impact of commercial quality on electricity consumer satisfaction”, Congreso Asociación Española para la Economia Energética", València: 2013, p. 1-12., https://upc.edu/bitstream/handle/2117/19561/047.pdf.
  • 6. R. J. Stockdale, S. J. McLelland, R. Middleton, T.J. Coulthard, “Measuring river velocities using GPS River Flow Tracers (GRiFTers)”, Wiley Online Library, 2007, DOI: 10.1002/esp.1614.
  • 7. W-C. Chu, Yi-P. Chen, T-H. Lin, “The Competitive Model Based on the Demand Response in the Off-Peak Period for the Taipower System”, IEEE Transactions on Industry, Vol.44, Issue: 4, 2008, doi: 10.1109/TIA.2008.926063.
  • 8. A. K. Verma, V. Vijay Venu, “A modeling paradigm for extending well being analysis to a composite bilateral contract market”, PSCE, 2009, IEEE, doi: 10.1109/PSCE.2009.4839959.
  • 9. M. Juresko, M. Pawlak, A. Mezyk, “Optimisation of wind turbine blades”, Journal of Materials Processing Technology 167 463-471, 2005, Elsevier .
  • 10. P. Garcia-Navarro, E. Playan, Numerical Modeling of Hydrodynamics of Water Resources”, International Workshop on Numerical Modelling of Hydrodynamics foe Water resources, Zaragosa, Spain, ISBN 13:978-415-44056-1 (hbk).
  • 11. S. Lee, “Numerical modeling of wind turbine aerodynamic noise in the time domain”, modeling of wind turbine aerodynamic noise in the time domain”, Journal of Acoustic Society, 2013, Doi: 10.1121/1.4774072.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-cccfea0d-a839-4948-8926-d957833f92fe
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.