Application of a BIM model for demolition work planning

Treść / Zawartość
Identyfikatory
Warianty tytułu
PL
Zastosowanie modelu BIM do planowania prac rozbiórkowych
Języki publikacji
EN
Abstrakty
EN
The article explores the use of BIM tools in the planning of demolition works for a structure. The analysis includes the utilization of BIM to create a three-dimensional model of the object, with a level of detail that allows for accurate cost estimation of the demolition. Additionally, it enables the precise determination of the demolition sequence, identification of potential issues, and optimization of the process. BIM tools also facilitate the analysis of the environmental impact of demolitionand the safety of workers. Furthermore, through virtual simulation, demolition planning can take into account ecological and social effects. The authors highlight that the application of a BIM model simplifies risk analysis and allows for the creation of scenarios for the duration of demolition work, enabling the selection of the fastest solution while simultaneously reducing costs and optimizing resources. Conclusions drawn from the case study demonstrate how advanced BIM tools can revolutionize the planning of demolition processes, introducing a new level of precision and a sustainable approach to such projects.
PL
W artykule przedstawiono możliwość zastosowania narzędzi BIM w procesie planowania rozbiórki obiektu. Analiza obejmuje wykorzystanie BIM do zbudowania trójwymiarowego modelu obiektu, uwzględniającego jego elementy na takim poziomie szczegółowości, który m.in. umożliwi oszacowanie kosztów jego rozbiórki. Ponadto będzie też możliwe precyzyjne określenie sekwencji rozbiórki, identyfikacja potencjalnych problemów i optymalizacja procesu. Narzędzia BIM umożliwiają także analizę wpływu rozbiórki na otoczenie oraz bezpieczeństwo pracowników. Dodatkowo, dzięki wirtualnej symulacji, planowanie rozbiórki może uwzględniać efekty ekologiczne i społeczne. Artykuł podkreśla korzyści płynące z zastosowania BIM, takie jak redukcja ryzyka, skrócenie czasu realizacji projektu, minimalizacja kosztów oraz zwiększenie efektywności zarządzania zasobami. Wnioski oparte na analizie przypadku demonstrują, jak zaawansowane narzędzia BIM zmieniają planowanie procesów rozbiórkowych, wprowadzając nowy poziom precyzji i zrównoważonego podejścia do tego typu projektów.
Rocznik
Strony
27--42
Opis fizyczny
Bibliogr. 21 poz., fig., tab.
Twórcy
  • Faculty of Civil Engineering and Resource Management; AGH University of Krakow
  • Faculty of Civil Engineering and Resource Management; AGH University of Krakow
Bibliografia
  • [1] Construction Law Act of 7 July 1994, "Construction Law Act of 7 July 1994," no. 89, pp. 1–140, 2021.
  • [2] Rawska-Skotniczny A. and Nalepka M., “Metody realizacji robót rozbiórkowych”, Builderpolska, no. January, (2016).
  • [3] Rawska-Skotniczny A. and Margazyn A., Rozbiórki budynków i budowli. PWN, 2021.
  • [4] Oleinik P. and Cherednichenko N., “Organization of demolition works during production buildings reconstruction”, IOP Conference Series: Earth and Environmental Science, vol. 403, no. 1, (Dec. 2019), p. 012189. https://doi.org/10.1088/1755-1315/403/1/012189
  • [5] Thomsen A. and Van Der Flier K., “Replacement or renovation of dwellings: The relevance of a more sustainable approach”, Building Research and Information, vol. 37, no. 5–6, (2009), pp. 649–659. https://doi.org/10.1080/09613210903189335
  • [6] Sobotka A. et al., “Tasks and problems in the buildings demolition works: a case study”, Archives of Civil Engineering, vol. 61, no. 4, (2015), pp. 3–18. https://doi.org/10.1515/ace-2015-0032
  • [7] Omrany H. et al., “Digital twins in the construction industry: a comprehensive review of current implementations, enabling technologies, and future directions”, Sustainability (Switzerland), vol. 15, no. 14, (2023), pp. 1–26. https://doi.org/10.3390/su151410908
  • [8] Zima K., “Building information modeling technology in supervision inspector work”, Scientific Review Engineering and Environmental Sciences, vol. 26, no. 2, (2017), pp. 266–275. https://doi.org/10.22630/PNIKS.2017.26.2.26
  • [9] Borkowski S., “A Literature review of BIM definitions: narrow and broad views”, Technologies, vol. 11, (2023). https://doi.org/10.3390/technologies11060176
  • [10] Sobotka A. and Sagan J., “Analiza fazy przygotowawczej rozbiórki obiektu budowlanego,” Budownictwo i Architektura, vol. 15, no. 2, (2016), pp. 029–035. https://doi.org/10.24358/bud-arch_16_152_04
  • [11] Boje C. et al., “Towards a semantic Construction Digital Twin: Directions for future research,” Automation in Construction, vol. 114, (Jun. 2020), p. 103179. https://doi.org/10.1016/J.AUTCON.2020.103179
  • [12] Afsari K. et al., “Cloud-Based BIM Data Transmission: Current Status and Challenges,” Proceedings of the 33rd ISARC, Auburn, USA, (2016), pp. 1073–1080.
  • [13] Cheng J. C. P. et al., “Construction and demolition waste management using BIM technology,” 23rd Annual Conference of the International Group for Lean Construction, no. July, (2015).
  • [14] Cheng J. C. P. and Ma L. Y. H., “A BIM-based system for demolition and renovation waste estimation and planning,” Waste Management, vol. 33, no. 6, (Jun. 2013), pp. 1539–1551. https://doi.org/10.1016/J.WASMAN.2013.01.001
  • [15] Dział Techniczny AGH U., Dokumentacja projektowa budynków z kampusu AGH w Krakowie.
  • [16] Zabielski J. and Szafranko E., “Wybrane problemy oceny stanu technicznego obiektów budowlanych w świetle obowiązującego prawa i stosowanej metodyki,” Przegląd Budowlany, vol. R. 92, nr 7–8, (2021).
  • [17] Journal of Laws, Regulation of the Minister of Infrastructure on the technical conditions to be met by buildings and their location. 2019, pp. 1–112.
  • [18] Preidel C. et al., “Common data environment,” Building Information Modeling: Technology Foundations and Industry Practice, (Sep. 2018), pp. 279–291. https://doi.org/10.1007/978-3-319-92862-3_15
  • [19] Łataś R. and Walasek D., “BIM w CDE,” MATERIAŁY BUDOWLANE, vol. 1, no. 12, (Dec. 2019), pp. 47–49. https://doi.org/10.15199/33.2019.12.06
  • [20] Patacas J. et al., “BIM for facilities management: A framework and a common data environment using open standards,” Automation in Construction, vol. 120, (Dec. 2020). https://doi.org/10.1016/J.AUTCON.2020.103366
  • [21] “Dalux FM,” 2024. [Online]. Available: https://www.dalux.com/pl/dalux-fm/
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa nr POPUL/SP/0154/2024/02 w ramach programu "Społeczna odpowiedzialność nauki II" - moduł: Popularyzacja nauki (2025).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-ca02fcf5-d073-4874-86c9-022ddb171d33
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.