PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Optimization of production processes using the Yamazumi method

Treść / Zawartość
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Manufacturing companies are now placing great emphasis on competitiveness and looking for ways to utilise their resources more efficiently. This paper presents optimum efficiency improvement of the automotive transmission assembly production line by using line balancing. 3 assembly stations were selected to optimize where waste management requirements are not met for achieving the production capacity. Several measures were proposed on the assembly lines concerned to reduce operations by using eliminating unnecessary activities of the assembly processes, reducing the cycle time, and balancing manpower workload using line balancing through Yamazumi chart and Takt time. The results of the proposed measures were compared with the current situation in terms of increasing the efficiency of the production line.
Słowa kluczowe
Twórcy
autor
  • Technical University of Kosice, Faculty of Mechanical Engineering, Department of Automotive Production, Mäsiarska 74, 040 01 Kosice, Slovak Republic
autor
  • Technical University of Kosice, Letna 9, 042 00 Kosice, Slovak Republic
autor
  • Technical University of Kosice, Letna 9, 042 00 Kosice, Slovak Republic
autor
  • Lublin University of Technology, Faculty of Mechanical Engineering, Department of Polymer Processing, Nadbystrzycka 36 St., 20-618 Lublin, Poland
Bibliografia
  • 1.Rahani A.R. and Al-Asyraf M. Production Flow Analysis through Value Steam Mapping: A Lean Manufacturing Process Case Study. International Symposium on Robotic and Intelligent Sensors 41, 2012, 1727-1734.
  • 2.Melton. T. The Benefit of Lean Manufacturing: What Lean Thinking has to Offer the Process Industries. Chemical Engineering Research and Design 83, 2005, 662-673.
  • 3.Becker C. and Scholl A. Survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research 168, 2006, 694-715.
  • 4.Agpak K. and Gokcen H. Assembly line balancing: Two resource constrained cases. International Journal of Production Economics 96, 2005, 129-140.
  • 5.Lumnitzer E., Liptai P. and Drahos R. Measurement and Assessment of Pulsed Magnetic Fields in the Working Environment. In: 8th International Scientific Symposium on Electrical Power Engineering (Elektroenergetika). 2015, 331-333.
  • 6.Adnan A.N., Jaffar A., Yusoff N. and Halim A. Implementation of Continuous Flow System in Manufacturing Operation. Applied Mechanics and Materials 393, 2014, 9-14.
  • 7.Adnan A.N., Ain Arbaai N. and Ismail A. Improvement of overall efficiency of production line by using line balancing. ARPN Journal of Engineering and Applied Sciences 11, 2016, 7752-7758.
  • 8.Semjon V. and Evin. E. Increasing the productivity of the assembly line by balancing of assembly stations using the Yamazumi method. Transfer Inovácií 13, 2009, 73-77.
  • 9.Mantič M., Kuľka J., Krajňák J., Kopas M. and Schneider M. Influence of selected digitization methods on final accuracy of 3D model. Production Management and Engineering Sciences. 2016, 475–480.
  • 10.Debski H., Teter A., Kubiak T. and Samborski S. Local buckling, post-buckling and collapse of thin-walled channel section composite columns subjected to quasi-static compression. Composite structures 136, 2016, 593-601.
  • 11.Garbacz T., Jachowicz T. and Tor-Swiatek A. The effect of blowing agents on the effectiveness of poly(vinyl chloride) extrusion. Advances in Science and Technology-Research Journal 10, 2016, 217-223.
  • 12.Kral J. and Kral J. Verification of manufacturing accuracy of mathematically defined shaped surfaces on 3D CNC milling machine. Key Engineering Materials 581, 2014, 423-430.
  • 13.Mircetic D., Nikolicic S., Stojanovic D. and Maslaric M. Modified top down approach for hierarchical forecasting in a beverage supply chain. Transportation Research Procedia 22, 2017, 193-202.
  • 14.Strohmandl J., Tomek M., Šafařík Z. and Málek Z. SW To Support the Project Management of Conveyor Design and Installation. Vision 2020: Innovation Management, Development Sustainability, and Competitive Economic Growth - Proceedings of the 28th International Business Information Management Association Conference, IBIMA 2016. pp. 2448-2453, 2016.
  • 15.Monden Y. Toyota Production System. Industrial Engineering and Management Press, Norcross, GA, 1998.
  • 16.Chiang W.Ch. and Urban T.L. The stochastic U-line balancing problem: A heuristic procedure. European Journal of Operational Research 2006, 1767–1781.
Uwagi
Opracowanie ze środków MNiSW w ramach umowy 812/P-DUN/2016 na działalność upowszechniającą naukę (zadania 2017)
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-b9484a25-09c4-451c-bea2-bc36e4c61265
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.