PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Powiadomienia systemowe
  • Sesja wygasła!
  • Sesja wygasła!
Tytuł artykułu

Construction of dams using the hydraulic fill method, discussion of the methodology of the Tailings Storage Facility Żelazny Most

Treść / Zawartość
Identyfikatory
Warianty tytułu
PL
Wznoszenie zapór metodą namywu, omówienie metodyki namywu obiektu unieszkodliwiania odpadów wydobywczych Żelazny Most
Języki publikacji
EN
Abstrakty
EN
The hydraulic fill method of erecting dams was characterized. The main assumptions and practical aspects of sand spigot were discussed on the example of the spigot of the dam body of the Żelazny Most Tailings Storage Facility (TSF). The advantages and disadvantages of the method are discussed, and the directions of attempts to implement pipelines rising along with sedimenting waste are presented, which are to reduce earthworks.
PL
Obiekt Unieszkodliwiania Odpadów Wydobywczych (OUOW) Żelazny Most to największa w Europie tego typu konstrukcja i jedna z największych na świecie [9]. To nadpoziomowy zbiornik z zaporami na całym obwodzie wzniesionymi głównie metodą namywu materiału dostarczanego metodą hydrotransportu. Obecnie zapory mają wysokość 80 m w najwyższym punkcie i są ciągle nadbudowywane. Czyni to zaporę jedną z najwyższych w kraju [10], a mając na uwadze jej długość wynoszącą w podstawie nieco ponad 16 km z pewnością najdłuższą. Należy tu podkreślić iż zbiornik w przeważającej części wypełniony jest osadem poflotacyjnym, a jedynie wierzchnią warstwę o głębokości do około 3 m stanowi woda, jednak osad, z racji drobnego uziarnienia również kumuluje znaczne ilości wody pozostając w dużej mierze w konsystencji płynnej.
Rocznik
Strony
227--242
Opis fizyczny
Bibliogr. 13 poz., il., tab.
Twórcy
  • KGHM Polska Miedz S.A. Oddział Zakład Hydrotechniczny, Rudna, Poland
  • Wroclaw University of Technology, Faculty of Civil Engineering, Wrocław, Poland
  • Wroclaw University of Technology, Faculty of Civil Engineering, Wrocław, Poland
  • KGHM Polska Miedz S.A. Oddział Zakład Hydrotechniczny, Rudna, Poland
Bibliografia
  • [1] A.A. Mikhasek, M.V. Rodionov, R.R. Mingafin, “Economic substantiation of construction of narrow profile hydraulic-fill structures”, IOP Conference Series: Materials Science and Engineering, 2021, vol. 1015, DOI: 10.1088/1757-899X/1015/1/012081.
  • [2] International Association of Dredging Companies, “Initiating Hydraulic-Fill Projects”, Facts About An Information Update from the IADC, 2012, no. 4.
  • [3] D. Feng-Xiang, L. Sheng, “Study on the Construction Technology of Hydraulic Fill with Sand for Freeway Subgrade”, in Proceedings International Conference on Energy and Environment Technology, 2009, pp. 556-569, DOI: 10.1109/ICEET.2009.604.
  • [4] U.S. Army Corps of Engineers, “Fort peck Project”. [Online]. Available: https://web.archive.org/web/20060206193306/http://fortpeckdam.com/.
  • [5] V.A. Melent‘ev, “Development of Hydraulic-Fill Dam Construction”, Gidrotekhnicheskoe Sroitel‘stvo, 1980, no. 12, pp. 36-38.
  • [6] S.M. Tarasenko, “Prevention of Slope Failure During the Construction of Hydraulic-Fill, Fine Sand Structures on Impermeable Foundations”, Gidrotekhnicheskoe Sroitel‘stvo, 1970, no. 1, pp. 20-21.
  • [7] L. Opyrchał, S. Lach, “Awaria zapory w Pieczyskach na Brdzie”, Gospodarka Wodna, 2017, no. 12, pp. 407-408.
  • [8] M. Jamiolkowski, W.D. Carrier, R.J. Chandler, K. Hoeg, W. Swierczynski, W. Wolski, “1st Za Chieh-Moh distinguished lecture: The geotechnical problems of the second world largest copper tailings pond at Zelazny Most, Poland”, Geotechnical Engineering Journal, 2010, vol. 41, no. 1, pp. 1-15.
  • [9] Mały Rocznik Statystyczny Polski. Warszawa: GUS, 2018.
  • [10] P. Stefanek, J. Engels, K.Wrzosek, P. Sobiesak, M. Zalewski, “Surface tailings disposal at the Żelazny Most TSF, today and into the future”, in Proceedings of the 20th International Seminar on Paste and Thickened Tailings, A. Wu, R. Jewell, Eds. University of Science and Technology Beijing, 2017, pp. 213-225.
  • [11] DHV Hydroprojekt Sp. z o.o., Instrukcja Eksploatacji OUOW Żelazny Most do rz. 195,00 m n.p.m. 2016.
  • [12] D. Kossoff, W.E. Dubbin, M. Alfredsson, S.J. Edwards, M.G. Macklin, K.A. Hudson-Edwards, “Mine tailings dams: Characteristics, failure, environmental impacts, and remediation”, Applied Geochemistry, 2014, no. 51, pp. 229-245, DOI: 10.1016/j.apgeochem.2014.09.010.
  • [13] Best Available Techniques (BAT) Reference Document for the Management of Waste from Extractive Industries. JRC, 2018.
Uwagi
Opracowanie rekordu ze środków MEiN, umowa nr SONP/SP/546092/2022 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2022-2023).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-b7181e34-e66d-4d5b-a8fb-be8c531535d2
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.