Presently the hoisting installation operated in the Wieliczka Salt Mine is mostly used for transporting visitors to the underground mine sections. It comprises two elevators which are able to effectively transport groups of up to 42 people during a single ride. Design objectives developed prior to its mounting at the shaft bottom and observations made by maintenance engineers clearly indicate that the guiding system in the shaft is very stiff and so deformations are in fact negligible. The components of the guiding system which have the highest stiffness are bunton beams, designed in accordance with pertinent regulations having relevance to hoisting installations.To verify the rationale of implementing the stiff steelwork frame, the digital model of the steelwork frame was created and numerical procedures were applied, taking into account the maximal design loads and operational loads. Numerical results were validated through measurements of real stress values at selected components of the guiding system in the hoisting installation operated in the shaft “Regis’, under variable operating conditions. The analysis of measurement data allows a preliminary evaluation of structural parameters of the car frame, highlighting the potential of reducing the mass of components selected to be optimised.
Słowa kluczowe
Czasopismo
Rocznik
Tom
Strony
90--107
Opis fizyczny
Bibliogr. 7 poz., rys., wykr., zdj.
Twórcy
autor
- Wieliczka Salt Mine S.A.Daniłowicza 10 , 32-020 Wieliczka, Poland
autor
- Elektrometal S.A., Stawowa 71, 43-400 Cieszyn, Poland
autor
- Wieliczka Salt Mine S.A.Daniłowicza 10, 32-020 Wieliczka, Poland
autor
- The Department of Machinery Engineering and Transport Faculty of Mechanical Engineering and Robotics AGH University of Science and Technology 30-059 Krakow, Poland
Bibliografia
- [1] Rozwadowski K., Konewecki A., Molski Sz., Pasek R: Stress measurements at critical points of the shaft steelwork and the mine hoist frame in the Regis Shaft of the Wieliczka Salt Mine, Gliwice, 2021
- [2] Commissioning documentation for special transport facilities in the Regis Shaft. Wieliczka Salt Mine, 2012. International Conference in Safety of Mine Hoist Installations, Ustroń 2012
- [3] PN-EN 10025:2002. Hot-rolled products of non-alloy structural steels. General technical delivery conditions [In Polish]
- [4] Herman M. et al: Engineering specification of the hoisting installation in the shaft “Regis”. Praca KGHM Cuprum CBR, Wrocław, 2012. [In Polish]
- [5] Kocańda S. J., Szala S.: Fundamentals of endurance analysis: PWN, Warszawa,1985 [In Polish]
- [6] Niezgodziński M.E., Niezgodziński T.: Fatigue endurance formulas and tables. Wydawnictwa Naukowo-Techniczne WNT Publishers, Warszawa, 2004 [In Polish]
- [7] Konewecki A., Rozwadowski K., Molski Sz., Pasek R., Zuski Z.: Metrological aspects of measurements taken on selected elevatorinstallation elements implemented in the mine shaft, Gliwice, 2020
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa nr SONP/SP/546092/2022 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2024).
Typ dokumentu
Bibliografia
Identyfikator YADDA