PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Structure of holonomic systems completing logistical tasks, a typical model of a holonomic system for storage - and its connecting logistical services

Identyfikatory
Warianty tytułu
Konferencja
Konferencja Problemy Rozwoju Maszyn Roboczych (XVI ; 20-23.01.2003 ; Zakopane, Polska)
Języki publikacji
EN
Abstrakty
EN
In our paper we summarise the main characteristics of holonomic systems, their organization, possible economic associations, logistical tasks, importance and characteristics of cooperation, and finally we demonstrate a cost oriented model of a holonomic system completing storage tasks. By this model we can show the economical benefit of establishment of holonomic systems.
Rocznik
Strony
95--104
Opis fizyczny
Bibliogr. 14 poz.
Twórcy
autor
  • University of Miskolc, Department of Materials Handling and Logistics
autor
  • University of Miskolc, Department of Materials Handling and Logistics
autor
  • University of Miskolc, Department of Materials Handling and Logistics
Bibliografia
  • [1] Bányai, Á.: Das virtuelle Logistikzentrum als Koordinator der logistischen Aufgaben, in: Modelling and optimization of logistic systems, Theory and practice, Edited T. Bányai and J. Cselényi, ISBN 9636614024, Miskolc, 1999. pp.:42-50.
  • [2] Cselényi, J.: Bevezetés az üzemi logisztikába, Logisztikai Tanulmányok. MLE. Bp. 1993.
  • [3] Cselényi, J.: A holonikus gyártási rendszerek logisztikájának néhány kérdése, Logisztika. 1996. July-August pp. 7-12
  • [4] Cselényi, J., Tóth T.: Some questions of logistics in case of holonic production system. The Second World Congress on Intelligent Manufacturing Processes and Systems. Budapest, June 10-13. 1997. p.:561-566.
  • [5] Cselényi, J., Illés В.: A CAST Controlling feladatai, stratégiai kérdései, kapcsolatai a CIM-ben. XII. Machine-tool Conference, Budapest, 1992, pp.:l-25.
  • [6] Cselényi, J. and Tóth, T.: Mathematical model for optimization of a product assembly system integrated by logistics and operating in a network-like way. Proceedings 3rd Workshop on European Scientific and Industrial Collaboration, University of Twente, 2001. pp.81-92.
  • [7] Cselényi, J. and Tóth, T.: Interactions between Logistics and Production Control within CIM Systems, A submitted and accepted paper to MANSA1 94 Conference, Cape Town, 1994
  • [8] Cselényi, J. and Bányai, Á.: Termelö vállalatoknál jelentkezö logisztikai feladatok optimális outsourcingjának meghatározására szolgáló modellek, Logisztikai Évkónyv 2000, pp.21-30.
  • [9] Cselényi, J.: Logisztikai menedzsment L-ll. 1997. Miskolc
  • [10] Cselényi, J.: Logisztikai rendszerek L-ll. (papers of lectures). Miskolc. 2001/2002. semesters
  • [11] Cselényi, J., Mang, В., Bányai, Á.: Virtuális vállalat a zártláncú gazdaság újrahasznosításának logisztikai feladataira. Logisztikai Évkónyv, 1999. pp. 31-38.
  • [12] Jünemann, R.: Materialflul3 un Logistik, Sprenger Verlag, 1989
  • [13] Prezenszki, J.: Logisztika (Bevezetö fejezetek). BME Mérnóktovábbképzó Intézet, Budapest, 1995.
  • [14] Prezenszki, J.: Logisztika II. (Módszerek, eljárások). Logisztikai fejlesztési Központ, Budapest, 1999.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-LOD7-0032-0090
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.