Powiadomienia systemowe
- Sesja wygasła!
- Sesja wygasła!
- Sesja wygasła!
- Sesja wygasła!
- Sesja wygasła!
Identyfikatory
Warianty tytułu
Assumption of responsibility for the building or construction works by the investor
Języki publikacji
Abstrakty
Zgodnie z obowiązującymi przepisami odpowiedzialność za obiekt lub roboty budowlane przechodzi z wykonawcy na inwestora w momencie dokonania protokolarnego odbioru zrealizowanego przedmiotu umowy. Zdarza się jednak, że dopuszczalne jest również dokonywanie częściowego przejęcia, a odpowiedzialność zostaje przeniesiona na inwestora nawet przed sporządzeniem tego dokumentu.
The year 2011 was special for the liner-based renovation technology, because it was the 40th anniversary of the introduction of this method. The eighth report of IKT (Institute for Underground Infrastructure) shows to what extent requirements translated into reality in the jubilee year. It refers to approx. 2,100 samples of liners that were taken in building sites in 2011 and analysed in IKT's laboratories. The lists included results of those renovation companies that delivered minimum 25 samples of liners from 5 different building sites for IKT tests. These requirements were met by 24 companies, which means there were 6 more than in the previous year. In 78% of cases, the order for testing of liner samples was placed by investors or engineering companies supervising building sites, whereas 22% of orders were placed directly by contractors. According to applicable laws, the investor is obliged to accept any building completed by the contractor. However, it is worth considering at which moment responsibility for the building is actually transferred from the contractor to the investor. As a general rule, this responsibility is transferred from the contractor to the investor at the time of acceptance of the completed object of the contract on the basis of a report. In some cases, it is also acceptable to take over the building partly in stages. Responsibility will be transferred to the investor also upon commencement of actual use of the building or its part, even before an acceptance report is prepared.
Słowa kluczowe
Czasopismo
Rocznik
Tom
Strony
62--64
Opis fizyczny
Twórcy
autor
- Stowarzyszenie Inżynierów Doradców i Rzeczoznawców SIDiR
Bibliografia
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BWAK-0031-0041