Wiercenie HDD w konstruowaniu ruchomych tam w Wenecji

Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
EN
Multi HDD for Venice mobile dams
Języki publikacji
PL
Abstrakty
EN
This article describes project which is a part of a much bigger project aimed to build 4 big mobile dams to control the exceptionally high tides that year after year damage the marvellous city of Venice. Three parallel pipes had to be laid along a multi-curve trajectory reaching a depth of 64 m. below the sea level, connecting the two islands of Lido and Pellestrina, part of the Venetian Lagoon, in order to lower the level of different utility pipes presently laid at the bottom of the sea. The 1340 m. long pilot bore could be magnetically controlled only for the first 340 m and for the last 200 m of the trajectory, leaving 800 m under the sea bottom with magnetic interference controlled only by solenoid beacons on each side.
Rocznik
Tom
Strony
36--38
Opis fizyczny
il.
Twórcy
autor
autor
autor
  • Anese s.r.l.
Bibliografia
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BWAK-0014-0004
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.