Podstawowe parametry najdłuższych tuneli kolejowych

Autorzy
Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
EN
Long railway tunnels : comparison of major projects
Języki publikacji
PL
Abstrakty
EN
The main purpose of a presented paper was to summary basic features of long railway tunnels and to compare proposed parameters of the tunnel Prague – Beroun to similar structures. It can be seen from the presented data that main features of very long tunnels was very significantly. In each case maximum eff ort should be made to optimise the design and to reduce final cost with retained safety. Currently prepared tunnel Prague – Beroun will be one of the longest railway tunnels after its completion. Presented data showed that proposed basic features of this tunnel generally comply with concepts of the similar tunnels.
Słowa kluczowe
Rocznik
Tom
Strony
68--72
Opis fizyczny
Bibliogr. 9 poz., rys., tab.
Twórcy
autor
  • Politechnika Czeska w Pradze, Firma D2 Consult Prague s. r. o.
Bibliografia
  • [1] Barták J., Gramblička M., Růžička J., Smolík J., Sochůrek J., Šourek P.:Underground construction in the Czech Republic, Satra, Prague 2007.
  • [2] Bopp R.: The distance of cross passages in twin bore railway tunnels. 4th International Conference on Safety in Road and Railway Tunnels, Madrid, Spain 2001.
  • [3] Hilar M.: Preparation and construction of long railway tunnels, higher doctorate thesis, Czech Technical University in Prague 2008.
  • [4] Kohler H.: Wienerwald tunnel – a challenging tunnelling project. Proceedings of the WTC 2007 in Prague 2007.
  • [5] Kovari K., Descoeudras F.: Tunnelling Switzerland. Swiss Tunnelling Society. Bertelsmann Fachzeitschriften GmbH 2001.
  • [6] Krása D., Ružička J., Hasík O.: Prague - Beroun, New Railway Connection. Proceedings of the WTC 2007 in Prague. 2007.
  • [7] Mára J., Ružička J.: Modernisation of the Prague - Beroun railway line. Tunel, Volume 1, 2006.
  • [8] Pöttler R., Thum F., Jöbstl W.: Driving of shallow tunnel in uncertain geological boundary conditions – a case history. Proceedings of the WTC 2007 in Prague. 2007.
  • [9] SUDOP Praha a.s.: Prague - Beroun, new railway line, Design documentation for issuance of zoning and planning decision. 2007.
Typ dokumentu