Analiza danych uzyskanych podczas monitorowania pracy maszyny TBM w trakcie budowy tuneli kolejowych

Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
EN
Analysis of the TBM monitoring data obtained during the construction of Railway Tunnels
Języki publikacji
PL
Abstrakty
EN
In this study, an analysis has been carried out on about 587 m of a service tunnel, excavated by a TBM in a flysch formation. Some relationships has been highlighted between the excavation specific energy, net advance rate, thrust on the cutter-head and the Rock Mass Rating. A TBM performance predictive law has been also applied verifying a scarce gap between the predicted and actual values of the net advance rate. The found relationship between excavation specific energy and RMR can help the choose of the TBM for a specific tunnel or the estimation of the net advance rate using a specific machine.
Rocznik
Tom
Strony
64--67
Opis fizyczny
tab., wykr.
Twórcy
autor
autor
autor
  • Wydział Budownictwa Lądowego, Inżynierii Środowiska i Geotechnologii, Politechnika w Turynie
Bibliografia
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BWA1-0042-0005
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.