PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

How to achieve short lead time in the rapid production environment?

Identyfikatory
Warianty tytułu
Konferencja
Rapid Production 2004. Innovation ‒ Knowledge ‒ Industry (1st International Conference; 29 September-1 October 2004; Wrocław)
Języki publikacji
EN
Abstrakty
EN
In a global market the customer selects the supplier, which can provide short and reliable delivery dates. Delivery dates largely depend on duration of lead times, therefore the basic requirement of customers can be fulfilled only by gradual transition from workshop production type to flexible manufacturing systems (reduction of number of operations, reduction of transition times, overlap of operations) or by a suitable method for reduction of lead times of orders in a current workshop production type (without big investments). The article describes methods for reduction of lead times, the emphasis being given to the reduction of lead time of operation; the method is based on the analysis of current order flow through workplaces, computer-aided design of flow diagrams, definition of average lead times of workplaces, and finding the critical workplaces that have the biggest influence on lead times. Three-line ABC analysis is used to find out the critical workplaces. Presented are the results of lead time reduction in a tool production department which exports 30% of its production, 5% of its production is sold on domestic market and 65% of production is used by the company itself. The company has a strong competition on domestic and global markets and the only surviving strategy seems to be in shortening delivery dates (i.e. shortening lead times of orders).
Słowa kluczowe
Twórcy
autor
  • Faculty of Mechanical Engineering, Univerasity of Ljubljana, Aškerčeva 6, Slovenia
autor
  • Faculty of Mechanical Engineering, Univerasity of Ljubljana, Aškerčeva 6, Slovenia
autor
  • Faculty of Mechanical Engineering, Univerasity of Ljubljana, Aškerčeva 6, Slovenia
autor
  • Faculty of Mechanical Engineering, Univerasity of Ljubljana, Aškerčeva 6, Slovenia
Bibliografia
  • [1] Wiendahl H.P: Lead-Oriented Manufacturing Control, Springer Verlag, Berlin, pp. 41-199, 1995.
  • [2] Starbek M., Grum J.: Operation lead time control, Robotics and Computer Integrated Manufacturing, Vol.16, pp. 443-450, 2000.
  • [3] Starbek M., Grum J.: Control of the state of orders on machines, Computers & Industrial Engineering, Vol.40 pp. 35-49, 2001.
  • [4] Starbek M., Menart D.: The optimization of material flow in production, International Journal of Machine Tools & Manufacture, Vol.40, pp. 1299-1310, 2000.
  • [5] Nyhuis P., Wiendahl H.P.: Logistische Kennlinien, Springer Verlag Berlin, pp. 206-210, 1999.
  • [6] Starbek M., Petrišič J., Kušar J.: Extended ABC Analysis, Strojarstvo, Vol.42, pp. 103-108, 2000.
  • [7] Berlec T.: Diagnosis of flow time of operation, Master thesis, Faculty of Mechanical Engineering. Ljubljana, pp.94-95, 2003.
  • [8] Schlicksupp H.: Kreative ldeenfindung in der Unternehmung. WDEG Berlin, New York. 1977.
  • [9] Shigeo S.: A Revolution in Manufacturing. The SMED System. Productivity Press, pp. 126. 1997.
  • [10] Polajnar A.: Čas kot konkurenčni faktor podjetij, Strojniški vestnik. 37, Vol. 7/9. pp.144-145 and Vol.10/12, pp.2067208, 1991.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BUS3-0003-0053
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.