PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Recent achievements at TRIUMF

Autorzy
Treść / Zawartość
Identyfikatory
Warianty tytułu
Konferencja
Proceedings of the XXXIII European Cyclotron Progress Meeting, 17-21 September 2002, Warszawa-Kraków, Poland
Języki publikacji
EN
Abstrakty
EN
A new series of experiments (mainly in astrophysics) began at TRIUMF in July 2001 when the ISAC-I linear accelerator started delivering radioactive ion beams (RIB) of energy up to 1.5 MeV/u. Since then the linac has operated reliably. Required improvements demand care during scheduled maintenance. More difficult was the smooth production of RIB with a 500 MeV proton beam on different target materials, where state-of-the-art techniques are being learned. Targets of CaO, Ta, SiC, Nb, and CaZrO3 have been used in combination with a surface ion source and incident proton currents up to 40 žA. Record radioactive beam intensities were achieved. A second target station is now being commissioned and will become operational during the fall of 2002. A superconducting linear accelerator extending the RIB energy to 6.5 MeV/u has recently been approved and is now being constructed (ISAC-II). A new 3500 m2 experimental building is being erected. A charge state booster, which will extend the mass range of the accelerated ions from A ? 30 to A ? 150, is also being commissioned. The 500 MeV cyclotron is being refurbished for reliability and upgraded to higher currents. A suitable operational beam tune for a total H- accelerated beam current of 300 žA has been commissioned and is now available to supply beam to four separate extraction proton lines simultaneously.
Słowa kluczowe
Czasopismo
Rocznik
Strony
159--163
Opis fizyczny
Bibliogr. 6 poz., rys.
Twórcy
autor
  • TRIUMF 4004 Wesbrook Mall, Vancouver, BC, V6T 2A3, Canada, Tel.: +604/ 222 7419, Fax: +604/ 222 1074, dutto@triumf.ca
Bibliografia
  • 1. Bricault P, Dombsky M (2001) The production target at ISAC. In: Proc of the 16th Int Conf on Cyclotrons and their Applications held at NSCL/MSU, 13−17 May 2001, East Lansing, USA. AIP 600:241−245
  • 2. Craddock MK, Dutto G, Kost C (1972) Effects of axial misalignment of the dees and their correction. AIP Conf Proc 9:329−339
  • 3. Dutto G, Baartman R, Blackmore EW et al. (1988) The upgrading of the TRIUMF facility to 500 µA operation. In: Tazzari S (ed.) Proc of the 1st European Particle Accelerator Conf: EPAC-1, 7−11 June 1988, Rome, Italy. Vols 1−2. World Scientific, Teaneck, pp 326−328
  • 4. Dutto G, Fong K, Laxdal RE et al. (2001) Impact of the cyclotron RF booster on the 500 MeV beam production. In: Proc of the 16th Int Conf on Cyclotrons and their Applications held at NSCL/MSU, 13−17 May 2001, East Lansing, USA. AIP 600:288−292
  • 5. Laxdal R (2001) Completion and operation of ISAC-I and extension to ISAC-II. In: Proc of the PAC, 2001: Particle Accelerator Conf, 6−18 June 2001, Chicago, USA, pp 556−560
  • 6. Laxdal R (2002) ISAC-I and ISAC-II at TRIUMF: achieved performance and new construction. In: Proc of the 21st Int Linear Accelerator Conf, 19−23 August 2002, Gyeongju, Korea, pp 296−360
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BUJ5-0004-0088
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.