The NNM method (Numerical Network Modelling)

Autorzy
Identyfikatory
Warianty tytułu
PL
Metoda NMS (Numerycznego Modelowania Sieciowego)
Języki publikacji
EN
Abstrakty
EN
Using a "logic" of a vertex which, to some degree, imitates the concept of a biological neurone, the author developed a numerical network modelling method called NNM Method (in Polish - NMS). Conditions and functions of edges and vertices, in particular: of reception, activation state, and of emission were incorporated into a two-spot network (this special network is characterised by the fact that each individual process execution is bounded by a preceding and an ensuing event, and this feature makes that the said network belongs to a group of networks totally different from artificial neural networks). This manoeuvre made it possible to equivalently analyse models containing the following receptors and emitters: deterministic (CPM, PERT) and stochastic (GERT), as well as the introduced decisive ones; for all of them, executions conditions were specified. This NNM method was exemplified by a technological organisational system: this system was adequately represented in the example, and its execution was analysed, i.e. the accomplishment of all the processes contained within a building stru
PL
Przy "logice" wierzchołka wzorowanej w pewnym stopniu na koncepcji biologicznego neuronu opracowana została przez autora tzw. metoda NMS - numerycznego modelowania sieciowego. Do sieci z grupy absolutnie innej niż sztuczne sieci neuronowe) wprowadzone i opisane zostały warunki oraz funkcje krawędzi i wierzchołków - w szczególności recepcji, stanu aktywacji i emisji. Umożliwiło to jednorodną analizę modeli z receptorami i emiterami zarówno deterministycznymi (CPM, PERT), stochastycznymi (GERT) jak i wprowadzonymi - decyzyjnymi o deklarowanych warunkach realizacji. W przykładzie z wykorzystaniem metody NMS odwzorowano układ technologiczno-organizacyjny i przeanalizowano realizację procesów cyklu obiektu budowlanego (tj. procesów: preparacji, budowy, eksploatacji obiektu wraz z niezbędnym bieżącym serwisem i remontami, jego likwidacją fizyczną i epilogacją oraz kontrolą) i przepływy pieniężne w 100. letnim okresie. Obliczenia numeryczne umożliwiły uwzględnienie zmian charakterystyk i współzależności procesów w zmienionych warunkach, które występują w wieloletnich cyklach obiektów budowlanych.
Twórcy
  • Cracov University of Technology
Bibliografia
  • 1. H.N. AHUJA, Project management. Techniques in planing and controlling construction projects, John Wiley & Sons, New York 1984.
  • 2. J. BIERNACKI, B. CYUNEL, Network methods in civil engineering [in Polish], Arkady, Warszawa 1989.
  • 3. E.F. BRIGHMAN, Fundamentals of financial management, 6 Edition University of Florida, Dryden Press, 1992.
  • 4. H. EISNER, A generalised network approach to the planning and scheduling of a research project, Operations Research, 10, 1, 1962.
  • 5. O. KAPLIŃSKI, The harmonisation of cyclic building processes from the stochastic point of view [in Polish], Dissertations No. 91, Poznań University of Technology, Poznań 1978.
  • 6. O. KAPLIŃSKI, Modelling of construction processes [in Polish], KILiW PAN, Warszawa 1997.
  • 7. A. KOSECKI, Stochastic network models applied to plan building tasks [in Polish], Cracow University of Technology, ZN no. 2, Cracow 1989.
  • 8. Z. MICHNOWSKI, The base of integrated graphical modelling ZMG of investment projects accomplishment processes [in Polish], KN KILiW PAN i KN PZITB, Krynica 1978.
  • 9. B. PRADECKA, Economuical sciences against natural environment [in Polish], PWE, Warszawa 1989.
  • 10. A.A. PRITSKER, G.E. WHITEHOUSE, GERT: Graphical Evaluation and Review Technique, Part II, Probabilistic and industrial engineering application, The Journal of Industrial Engineering, 17, 6, 1966.
  • 11. B. ROY, Algebre moderne et theorie des graphes, Dunod, Paris 1970.
  • 12. R. TADEUSIEWICZ, Neural networks [in Polish], Academic Editing House RM, Warszawa 1993
  • 13. A. WIĘCKOWSKI, Produktionsystem Lieferung-Reserve-Montage, Bumaschine und Bautechnik, 3, 1982.
  • 14. A. WIĘCKOWSKI, Investment projects that are financially optimal, Vedecka Konferencia, Kosice 1997
  • 15. A. WIĘCKOWSKI, The base of a NMS method in analysing the processes execution [in Polish], KN KILiW PAN i KN PZITB, Krynica 1998.
  • 16. A. WIĘCKOWSKI, A sozoeconomic model of process realization a building structure cycle [in Polish], Cracow University of Technology, series Civil Engineering, Monography 246, Cracow 1999.
  • 17. J.T. WINPENNY, Values for the environment, British Crown Copyright, London 1993.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BTB3-0003-0094
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.