PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Evaluation and verification of time and costs of production activities in foundry industry

Autorzy
Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
This work presents the possibility of using technology of modelling and simulation of productive systems in the management of cast iron production by means of automated foundry lines to maximize assembly line structure. The computer model of foundry has been planed and conducted in order to compile the schedule of cast production. The variants of solution have been estimated talking into account time limitations imposed by clients and the criterion for prime costs appointed on the basis of the ZAR by means of aided detailed calculation according to planes of their formation. In the research, problem connected with exploitation of automatic foundry lines have been taken into consideration. Moreover, the analysis of line work stoppage has been conducted and construction of schedule of the planned service of line device has been undertaken on the basis of the knowledge of timetables of correct work of these devices. Furthermore, the operational database has been prepared so as to assemble and process data about the damaged and other line work stoppage. It should be noted that the database will give the possibility of working out the schedule of planned service. The problems has been presented by using the pocket for modelling and the simulation of productive systems – ARENA.
Rocznik
Strony
79--82
Opis fizyczny
Bibliogr. 19 poz., rys.
Twórcy
autor
  • Department of Industrial Engineering, Bielsko-Biała University, Willowa 2 Str., 43-309 Bielsko-Biała, Poland, skukla@ath.bielsko.pl
Bibliografia
  • [1] D. Cleland, L. Ireland, Project management - strategies and implementation, McGraw - Hill, New York 2002.
  • [2] J. Gibson, J. Donnelly, J. Ivancevich, Organizations, behavior, structure and processes, McGraw - Hill, New York 2003.
  • [3] J. Matuszek, J. Košturiak, M. Gregor, J. Chal, J. Krištàk, Lean Company, Wydawnictwo Akademii Techniczno - Humanistycznej w Bielsku - Białej, Bielsko - Biała 2003.
  • [4] P. Willmott, Total Productive Maintenance, The Western Way, Butterworth - Heinemann, Oxford 1994.
  • [5] F.T. Chan, H.C. Lau, R.W. Ip, H.K. Chan., S. Kong, Implementation of total productive maintenance - A case study, International Journal of Production Economics, Vol. 95, 2005, 71-94.
  • [6] B. Pisarek, Cause and effect analysis of failure of machines and characteristic of TPM-fv02 database for analysis in precision foundry and control of realization of program TPM, Archives of Foundry vol. 5, No. 17 (2005) 405-416 (in Polish).
  • [7] M. Gregor, M. Haluškova, J. Hromada, J. Košturiak, J. Matuszek, Simulation of manufacturing system, Wydawnictwo Politechniki Łódzkiej Filii w Bielsku - Białej, Bielsko - Biała 1998.
  • [8] R. N. Callahan, K. M. Hubbard, N. M. Bacoski, The use of simulation modelling and factorial analysis as a method for process flow improvement, International Journal of Advanced Manufacturing Technology Vol. 29, No. 1-2 (2006) 202- 208.
  • [9] W. Kelton, R. Sadowski, D. Sadowski, Simulation with Arena, WCB/McGraw-Hill, Sewickley 1998.
  • [10] A. Law, D. Kelton, Simulation modelling and analysis, McGraw - Hill, New York 2000.
  • [11] D. Montgomery, Design and analysis of experiments. Wiley, New York 1997.
  • [12] C. Chung, Simulation modelling handbook: a practical Approach, CRC Press, London 2004.
  • [13] V. Hlupic, Z. Irani, R. J. Paul, Evaluation framework for simulation software, International Journal of Advanced Manufacturing Technology, Vol. 15, 1999, 366-382.
  • [14] M. Wrona, Methodics of computer simulation construction in production process management, Archives of Foundry vol. 5, No. 17 (2005) 385-392 (in Polish).
  • [15] M. Perzyk, S. Waszkiewicz, M. Kaczorowski, A. Jopkiewicz, Foundry, WNT, Warszawa 2000, (in Polish).
  • [16] J. C. Hernandez-Matias, A. Vizan, A. Hidalgo, J. Rios, Evaluation of techniques for manufacturing process analysis, International Journal of Advanced Manufacturing Technology Vol. 17, No. 5 (2006) 571 - 583.
  • [17] D. Plinta, S. Kukla, Optimisation methods in the modelling and simulation of production systems, 7th IFAC Symposium on Cost Oriented Automation, June 7-9, 2004, Gatineau (Quebec), Canada, International Federation of Automatic Control, 291-294.
  • [18] J. Matuszek, S. Kukla, Management of the casting production aided by modelling and simulation technique of the foundry lines working, Archives of Foundry vol. 5, No. 17 (2005) 169-174 (in Polish).
  • [19] S. Kukla, Modelling and simulation of the foundry production systems, Doctor's thesis, 2006 (in Polish).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BPZ3-0032-0016
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.