Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
The article presents an overview of some recent developments in the area of mathematical modelling of maintenance decisions with the use of time-delay and time-delay analysis. Thus, the literature overview in the investigated area is provided. The problem of time relations occurred in supply chain performance process is investigated. Later, there are presented obtained reliability analysis results in comparison with the knowledge about the case company present condition. The article investigates the possibilities of basic time delay model implementation in the area of logistic system of sixteen forklifts performance analysis.
Czasopismo
Rocznik
Tom
Strony
63--74
Opis fizyczny
Bibliogr. 65 poz., rys., tab.
Twórcy
- Wroclaw University of Technology, Wroclaw, Poland, sylwia.werbinska@pwr.wroc.pl
Bibliografia
- [1] Agrafiotis G. K., Tsoukalas M. Z., Reliability analysis and optimization applications of a two-unit standby redundant system with spare units, Microelectron. Reliability, 1994, Vol. 34, No. 9.
- [2] Akbarov A., Christer A. H., Wang W., Problem identification in maintenance modelling: a case study, International Journal of Production Research, 2008, Vol. 46, No. 4, pp. 1031-1046.
- [3] Alzubaidi H J., Maintenance modelling of a major hospital complex, PhD thesis, University of Salford, Salford, 1993.
- [4] Andrawus J. A., Watson J., Kishk M., Wind turbine maintenance optimisation: principles of quantitative maintenance optimization, International Journal of Wind Engineering, 2007, 31(2), pp. 101-110.
- [5] Baker R. D., Christer A. H., Review of time-delay OR modelling of engineering aspects of maintenance, European Journal of Operational Research, 1994, 73, pp. 407-422.
- [6] Baker R. D., Wang W., Developing and testing the time-delay model, Journal of the Operational Research Society, 1993, Vol. 44, pp. 361-374.
- [7] Baker R. D., Wang W., Estimating the time-delay distribution of faults in repairable machinery from failure data, IMA Journal of Mathematics Applied in Business & Industry, 1992, 3, pp. 259-281.
- [8] Ballou R. H. Business logistics/supply chain management. Pearson Education Inc., New Jersey, 2004.
- [9] Barron Y., Frostig E., Levikson B., Analysis of R out of N systems with several repairmen, exponential life times & phase type repair times: An algorithmic approach, European Journal of Operational Research, 2006, 169.
- [10] Blanchard, B. S. Logistics Engineering and Management (5th Ed). Upper Saddle River: Pearson Prentice Hall, 2004.
- [11] Caban D, Maciejewski H., Time redundancy in a transportation logistics system, Advances in safety and reliability. Proceedings of the European Safety and Reliability Conference (ESREL 2005), Tri City, Vol.1/ed. Kołowrocki K., Leigden: A. A. Balkema, 2005, pp. 293-296.
- [12] Caban D., Maciejewski H., Reliability of systems with cumulative time resource (in Polish), Materials of XXXI Winter School of Reliability, Szczyrk, 2004.
- [13] Catuneanu V. M., Moldovan C., Popentin, Fl., Gheorghin M., Optimum system availability and spare allocation, Microelectronic Reliability, 1988,Vol. 28, No. 3.
- [14] Chilcott J. B., Christer A. H., Modelling of condition based maintenance at the coal face, International Journal of Production Economics, 1991, 22, pp. 1-11.
- [15] Choi K-M., Semi-Markov and Time delay Models of Maintenance, PhD thesis. University of Salford, Salford, 1997.
- [16] Christer A. H., Developments in time delay analysis for modelling plant maintenance, Journal of the Operational Research Society, 1999, 50, pp. 1120-1137.
- [17] Christer A. H., Prototype modelling of irregular condition monitoring of production plant, IMA Journal of Mathematics Applied in Business & Industry, 1992, 3, pp.219-232.
- [18] Christer A. H., Time-delay model of reliability of equipment subject to inspection monitoring, Journal of the Operational Research Society, 1987, Vol. 38, No. 4, pp. 329-334.
- [19] Christer A H. Modelling inspection policies for building maintenance, Journal of the Operational Research Society, 1982, Vol. 33, pp. 723-732.
- [20] Christer A. H., Lee C., Modelling ship operational reliability over a mission under regular inspections, Journal of the Operational Research Society, 1997, 48, pp. 688-699.
- [21] Christer A. H., Redmond D. F., Revising models of maintenance and inspection, International Journal of Production Economics, 1992, 24, pp. 227-234.
- [22] Christer A. H., Redmond D. F., A recent mathematical development in maintenance theory, IMA Journal of Mathematics Applied in Business and Industry, 1990, 2, pp. 97-108.
- [23] Christer A. H., Waller W. M., Reducing production downtime using time-delay analysis, Journal of the Operational Research Society, 1984, Vol. 35, No. 6, pp. 499-512.
- [24] Christer A. H., Waller W. M., An operational research approach to planned maintenance: modelling P.M. for a vehicle fleet, Journal of the Operational Research Society, 1984, Vol. 35, No. 11, pp. 967-984.
- [25] Christer A. H., Waller W. M., Time delay models of industrial inspection maintenance problems, Journal of the Operational Research Society, 1984, Vol. 35, No. 3, pp. 401-406.
- [26] Christer A.H, Wang W., Baker R., Sharp J., Modelling maintenance practice of production plant using time-delay concept, IMA Journal of Mathematics Applied in Business and Industry, 1995, Vol. 6, pp. 67- 84.
- [27] Christer A.H, Wang W., Sharp J., Baker R., A case study of modelling preventive maintenance of production plant using subjective data, 1998, Journal of the Operational Research Society, Vol. 49, pp. 210-219.
- [28] Christer A. H., Whitelaw J., An operational research approach to breakdown maintenance: problem recognition, Journal of the Operational Research Society, 1983, Vol. 34, No. 11, pp. 1041-1052.
- [29] Cohen M. A., Lee H. L., Strategic analysis of integrated production-distribution systems: models and methods, Operational Research, 1988, 36, 2, pp. 216-228.
- [30] Coughlin R. J., Optimization for spares in a maintenance scenario, Annual Reliability and Maintainability Symposium, 1984.
- [31] Cui X., Time delay modeling and software development, 2002, PhD thesis, University of Salford, Salford.
- [32] Dekker R., Scarf P. A., On the impact of optimisation models in maintenance decision making: the state of the art, Reliability Engineering and System Safety, 1998, 60, pp. 111-119.
- [33] Desa M. I., Christer A. H., Modelling in the absence of data: a case study of fleet maintenance in a developing country, Journal of the Operational Research Society, 2001, Vol. 52, No. 3, pp. 247-260.
- [34] Dziurkowski P., Electric forklift trucks reliability analysis (in Polish), Ms. Thesis (unpublished) Wroclaw University of Technology, Wroclaw, 2009.
- [35] Gross D., Pinkus C. E., Designing a support system for repairable items, Computer & Ops. Res. 1979, Vol. 6.
- [36] Guo R., Ascher H., Love E., Towards practical and synthetical modelling of repairable systems, Economic Quality Control, 2001, Vol. 16, No. 2, pp. 147-182.
- [37] Guo R., Ascher H., Love E., Generalized models of repairable systems a survey via stochastic processes formalism, ORiON, 2000, Vol. 16, No. 2, pp. 87-128.
- [38] Jodejko-Pietruczuk A., Werbińska-Wojciechowska S. Economical effectiveness of Time delay approach using in Time-Based maintenance modelling, In: Proceedings of PSAM 11 & ESREL 2012 Conference, 25-29 June 2012, Helsinki, Finland.
- [39] Jodejko-Pietruczuk A., Werbińska-Wojciechowska S., Analysis of Block-Inspection Policy parameters from economical and availability point of view, In: Proceedings of PSAM 11 & ESREL 2012 Conference, 25-29 June 2012, Helsinki, Finland.
- [40] Jodejko-Pietruczuk A. Werbińska-Wojciechowska S., Influence of TD parameter estimation on BIP models results, article in prep.
- [41] Langer Y., System with time-redundancy, In proc. symp. Annual Reliability and Maintainability Symposium, 2001.
- [42] Lee Ch., Applications of Time delay Theory to Maintenance Practice of Complex Plant, PhD thesis, University of Salford, Salford, 1999.
- [43] Leung F., Kitleung M., Using time-delay analysis to study the maintenance problem of gearboxes, International Journal of Operations and Production Management, 1996, Vol. 16, No. 12, pp. 98-105.
- [44] Mazzuchi T. A., van Noortwijk J. M., Kallen M. J., Maintenance optimization, Technical Report, 2007, TR-2007-9.
- [45] Nowakowski T., Werbińska-Wojciechowska S., Developments of time dependencies modeling concepts, Advances in safety, reliability and risk management. Proceedings of the European Safety and Reliability Conference, ESREL 2011, Troyes, France, 18-22 September 2011/ eds. Bérenguer Ch., Gral A.l, Guedes Soares C., Leiden: CRC Press/Balkema, cop. 2012. pp. 832-838.
- [46] Pillay A., Wang J., Wall A. D., Ruxton T., A maintenance study of fishing vessel equipment using time-delay analysis, Journal of Quality in Maintenance Engineering, 2001, Vol. 7, No. 2, pp. 118-127.
- [47] Redmond D F., Time delay Analysis in Maintenance, PhD thesis, University of Salford, Salford, 1997.
- [48] Redmond D. F., Christer A. H., Ridgen S. R., Burley E., Tajelli A., Abu-Tair A., OR modelling of the deterioration and maintenance of concrete structures, European Journal of Operational Research, 1997, Vol. 99, pp. 619-631.
- [49] Sadananda Upadhya K., Srinivasan N. K., Availability of weapon systems with multiple failures and logistic delays, International Journals of Quality and Reliability Management, 2003, Vol. 20, No. 7, pp. 836-846.
- [50] Sarkar J., Li F., Limiting average availability of a system supported by several spares and several repair facilities, Statistics and Probability Letters, 2006, Vol. 76, Issue 18, pp. 1965-1974.
- [51] Subramanian R., Natarajan R., An n-unit standby redundant system with r repair facilities and preventive maintenance, Microelectron. Reliability, 1982, Vol. 22, No. 3.
- [52] Szozda N., Werbińska-Wojciechowska S., Influence of the demand planning process on logistic system reliability. Case study, Logistics and Transport, 2011, No. 2(13), pp. 79-92.
- [53] Thomas, L.C., Gaver D.P., Jacobs P.A., Inspection models and their application, IMA Journal of Mathematics Applied in Business & Industry, 1991, 3, pp. 283-303.
- [54] Ushakow I., Handbook of reliability engineering, New York: Wiley, 1994.
- [55] Valdez-Flores C., Feldman R., A survey of preventive maintenance models for stochastically deteriorating single-unit systems, Naval Research Logistics, 1989, Vol. 36, pp. 419-446.
- [56] Vlajic J. V., van der Vorst J. G. A. J. , Hendrix E. M. T., Food supply chain network robustness – A literature review and research agenda, Proceedings of the International Conference on Management in Agrifood Chains and Networks, 2008, Wageningen, the Netherlands.
- [57] Wang W., Subjective estimation of time-delay distribution in maintenance modelling, European Journal of Operational Research, 1997, Vol. 99, pp. 511-529.
- [58] Wang K-H., Hsieh Y., Reliability of a repairable system with spares and a removable repairman, Microelectronic. Reliability, 1995, Vol. 35, No. 2.
- [59] Wang K-H., Sivazlian B. D., Reliability of a system with warm standbys and repairmen, Microelectronic. Reliability, 1989, Vol. 29, No. 5.
- [60] Ważyńska-Fiok K., Jaźwiński J., Dependability of technical systems (in Polish), PWN, Warszawa, 1990.
- [61] Werbińska-Wojciechowska S., Model of logistic support system for means of transport exploitation process, PhD. Thesis, Wroclaw University of Technology, Wroclaw, 2008.
- [62] Werbińska-Wojciechowska S., Interactions between logistic and operational system – an availability model, Risk, reliability and societal safety. Eds Aven T., Vinnem J. E., Vol. 2, Leiden: Taylor and Francis, 2007, pp. 2045-2052.
- [63] Werbińska S., The reliability model of logistic support system with Time Dependency (in Polish), Logistics, 2007, No. 3.
- [64] Werbińska S., Problems of designing logistic support system with time dependency, SYSTEMS Journal of Transdisciplinary Systems Science, 2007, Vol. 12, No. 2.
- [65] Wu T., Blackhurst J., O’Grady P., Methodology for supply chain disruption analysis, International Journal of Production Research, 2007, Vol. 45, No. 7, pp. 1665-1682.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BPW6-0027-0021