Czasopismo
Rocznik
Tom
Strony
113--121
Opis fizyczny
Bibliogr. 19 poz.
Twórcy
- Wroclaw University of Technology, Wroclaw, Poland
Bibliografia
- [1] Akbarov A., Christer A. H., Wang W., Problem identification in maintenance modelling: a case study, International Journal of Production Research, Vol. 46, No. 4, 1031-1046, 2008.
- [2] Bogataj L., Bogataj M., The study of optimal additional investments in capabilities for reduction of delays in value chain, International Journal of Production Economics, 108, 281-290, 2007.
- [3] Box G. E. P., Jenkins G. M., Time Series Analysis Forecasting and Control, Holden-Day, California, 1976.
- [4] Christer A. H., Developments in delay time analysis for modelling plant maintenance, Journal of the Operational Research Society, 50, 1120-1137, 1999.
- [5] Christer A. H., Wang W., Baker R. D., Modelling maintenance practice of production plant using the delay-time concept, IMA Journal of Mathematics applied in Business and Industry, 6, 67-83, 1995.
- [6] Christer A. H., Wang W., A model of condition monitoring of a production plant, International Jorunal od Prod. Res., Vol. 30, No. 9, 2199- 2211, 1992.
- [7] Christer A. H., Waller W. M., Delay-time models of industrial inspection maintenance problems, Journal of the Operational Research Society, 33, 401-406, 1984.
- [8] Christer A. H., Modelling inspection policies for building maintenance, Journal of the Operational Research Society, 33, 723-732, 1982.
- [9] Desa M. I., Christer A. H., Modelling in the absence of data: a case study of fleet maintenance in a developing country, Journal of the Operational Research Society, 52, 247-260, 2001.
- [10] Hennet J-C., Tarbouriech S., Stability conditions of constrained delay systems via positive invariance, International Journal of Robust and Nonlinear Control, Vol. 8, 265-278, 1998.
- [11] Kennedy W.J., Patterson J.W., Fredendall L.D, An overview of recent literature on spare parts inventories, International Journal of Production Economics, Vol. 76, Issue 2, 201-215, 2002.
- [12] Mabini M. C., Christer A. H., Controlling multiindenture repairable inventories of multiple aircraft parts, Journal of the Operational Research Society, 53, 1297-1307, 2002.
- [13] Nowakowski T., Werbińska-Wojciechowska S., Maintenance processes modelling. (w przygotowaniu).
- [14] Nowakowski T., Werbińska S., Wybrane problemy oceny łańcucha logistycznego, w: Wybrane zagadnienia logistyki stosowanej, Bukowski L. (red.), Wyd. AGH, Kraków, 2009.
- [15] Pillay A., Wang J., Wall A. D., A maintenance study of fishing vessel equipment using delay-time analysis, Journal of Quality in Maintenance Engineering, Vol. 7, No. 2, 118-127, 2001.
- [16] Sadananda Upadhya K., Srinivasan N. K., Availability of weapon systems with multiple failures and logistic delays, International Journals of Quality and Reliability Management, Vol. 20, No. 7, 836-846, 2003.
- [17] Wang W., Christer A. H., Towards a general condition based maintenance model for a stochastic dynamic system, Journal of the Operational Research Society, 51, 145-155, 2000.
- [18] Werbińska S., Model logistycznego wsparcia systemu eksploatacji środków transportu. Rozprawa doktorska Wydziału Mechanicznego PWr., Wrocław, 2008.
- [19] Wojnar A. Analiza funkcjonowania systemu dystrybucji dla wybranego przedsiębiorstwa. Praca dyplomowa PWr. (niepublikowana), Wrocław 2008.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BPW6-0018-0106