PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Optimized planning and scheduling of pressure equipment inspections at comah establishments

Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
In a process establishment, where the legislation on the control of major accidents hazard (COMAH) is enforced, the operator's duties include the implementation of a Safety Management System, which addresses all the procedures significant for safety. A critical issue of the SMS is the planning and the scheduling of mechanical integrity inspections on pressure equipment. This is due to high number of components - including pipes, unfired and fired vessels, pumps and valves, - which could require different technical and organization procedures for testing or inspection. Usually, mechanical integrity inspections may request higher resource use than other safety related activities. The paper presents a model for inspection planning and scheduling, in order to integrate safety issues with other technical and economical issues.
Czasopismo
Rocznik
Tom
Strony
127--136
Opis fizyczny
Bibliogr. 10 poz.
Twórcy
autor
  • ISPESL, National Institute for Prevenzione e Safety at Work Research Center I- 00040 Monteporzio C. (Roma) ITALY
Bibliografia
  • 1. ASME. 1991. Risk-Based Inspection-Development Of Guidelines- General Document, Centre for Research and Technology Development, CTRD, Vol. 20-1, American Society of Mechanical Engineers.
  • 2. API. 2002. API Recommended Practice 580 Risk Based Inspection, American Petroleum Institute, Washington DC First Edition.
  • 3. Ablitt, C., Speck, J. Experiences in implementing Risk-based Inspection, in 3rd MENDT- Middle East Nondesctructive Testing Conference, (November 2005), Bahrain.
  • 4. Bragatto, P. Pittiglio, P. Geraci, D. Pichini, E. 2006 Inspections on Safety Management Systems and Integrity Controls at "Seveso" Facilities Safety and Reliability for Managing Risk ISBN 0-415-41620-5 Taylor & Francis Group, London, UK pp. 1163-1169
  • 5. Chang, M., Chang, R., Shu, C., Lin, K. 2005. "Application of risk based inspection in refinery and processing piping", Journal of Loss Prevention in the Process Industries, Vol. 18, pp. 397-402.
  • 6. Dey, P. K., 2001. "A risk-based model for inspection and maintenance of crosscountry petroleum pipeline", Journal of Quality in Maintenance Engineering, Vol. 7, N°1, pp. 25-41.
  • 7. Kallen, M. J., van NoortWijk, J. M., 2005. "Optimal maintenece decisions under imperfect inspection", Reliability engineering and System safety, Vol.90, pp177-185
  • 8. Khan, F. I., Haddara, M. H., "Risk-basd maintenacnce of ethylene oxide production facilities", Journal of Hazardous Materials, Vol.108, 2004, pp. 147-159.
  • 9. Higgs, P. A., Parkin, R. Jackson, M. AlHabaibeh, A. Zorriassatine, F. Coy, J., 2004. A Survey On Condition Monitoring Systems In Industry Proceedings of ESDA Manchester, UK, pp 19-22.
  • 10. Italian Ministerial Decree n. 329 — 1th December 2004, Regolamento recante norme per la messa in servizio ed utilizzazione delle attrezzature a pressione e degli insiemi. In Italian
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BPW6-0015-0007
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.