Tytuł artykułu
Autorzy
Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
Demolition of the old and building of the new railway bridge at railway line e 65 over narew river in modlin
Języki publikacji
Abstrakty
The elaboration discusses the demolition of the superstructure of the railway bridge and building new. The bridge has a length of about 250m. The existing bridge consists of three separate spans. The new design is the lattice bridge continuous. Installation of a new construction was made method of longitudinal shifting. To demolish were used temporary supports, which were required for longitudinal shifting
Słowa kluczowe
Czasopismo
Rocznik
Tom
Strony
47--57
Opis fizyczny
Twórcy
Bibliografia
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BPP2-0020-0075