PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Niecodzienne problemy technologiczne realizacji przebudowy tymczasowego mostu drogowego na most stały na rzece Bug

Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
Języki publikacji
PL
Abstrakty
EN
In the paper authors presented very generally scope of reconstruction and strengthening of temporary road bridge over Bug river in Frankopol and focused in details on description of unusual technological aspects, which were design and applied at stage of bridge construction works. In particular authors shown technology of strengthening of supports and their foundations by means of micropiles, strengthening of spans by composite reinforced concrete slab, steel overlays, additional oblique trusses (struts) and external prestressing of lower chord of main girders as well as technology of all bridge lifting of 28 cm for the period of couple of month and technology of slab concreting. Reconstruction deserves for big attention because all works were carried out while keeping constant possibility for traffic flow across the bridge with token only weight limitation to 24 t.
Rocznik
Tom
Strony
25--37
Opis fizyczny
.
Twórcy
autor
autor
autor
autor
autor
  • Grupa Promost Wrocław
Bibliografia
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BPP2-0016-0074
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.