Tytuł artykułu
Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
The paper concerns an existing flexible manufacturing system containing two dedicated machines with three magazines of raw material and the transportation system in the form of the robot with a linear routing. Firstly, a mathematical model of the system has been developed. In general, there are batches of identical parts to be produced in the system for which the technological routes are defined and which constitute a job-shop environment. Additionally, the set-up times for batches and particular operations are taken into account. For this model a heuristic scheduling algorithm has been constructed. Computational experiments and simulation studies validated the model and the algorithm proposed.
Rocznik
Tom
Strony
189--207
Opis fizyczny
Bibliogr. 13 poz.
Twórcy
autor
autor
autor
autor
autor
- Institute of Computing Science, Poznań University of Technology, ul. Piotrowo 3a, 60-965 Poznań, Poland. tel. +48 61 8790790, fax: +48 61 8771525
Bibliografia
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BPP1-0011-0093