PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

Linie napowietrzne

Autorzy
Identyfikatory
Warianty tytułu
EN
Overhead power lines
Języki publikacji
PL
Abstrakty
Czasopismo
Rocznik
Tom
Strony
379--386
Opis fizyczny
Bibliogr. 20 poz.
Twórcy
  • Energoprojekt - Kraków SA
Bibliografia
  • [1] 22-101. Reliability and upgrading studies of the 765 kV Itaipu transmission system - De Oliveira E., Silva A. i inni (Brazil).
  • [2] 22-102. Assessment and upgrading of transmission towers - Kitipornchai S., Albermani F. (Australia).
  • [3] 22-103. Probabilistic based condition assessment of overhead transmission lines - Ross A.A.H.J. i inni (The Netherlands).
  • [4] 22-104. Risk assessment to improve reliability of transmission facilities exposed to subtropical high wind storm events - Letchford C. W. i inni (Australia).
  • [5] 22-105. Practical steps for increasing availability of existing overhead transmission lines - Pohlman J.C. i inni (United States).
  • [6] 22-106. Increasing the reliability of transmission lines rebuilt after the January 1998 ice storm - Bell N., Binette L., Lemieux N., Sabourin G. (Canada).
  • [7] 22-107. Working Group preliminary report: Management of existing overhead transmission lines. On behalf of Working Group 22.13.
  • [8] 22-201. Assessment of existing overhead transmission lines and solutions for extending their residual lifetimes - Chone F., Gaudry M. i inni (France).
  • [9] 22-202. Maximising the ratings of National Grid's existing transmission lines using high termperature, low sag conductor - Tunstal M.J., Hoffmann S.P. i inni (United Kingdom)
  • [10] 22-203. Working in a market-driven electricity supply industry modifications to UK overhead transmission line working practice - Carter C.N., Deas J.N., Gilbert G.R., Neve S.H., Maddocks D.G. (United Kingdom).
  • [11] 22-204. Use of an airborne laser locator to improve availability and quality of maintenance of overhead lines - Mekhanoshin B.I., Medvedev Ye.M., Rivkin L.Yu., Shkaptsov V.A., Yavorsky Ye.A., Dementyev Y.A. (Russia), Urwin R. (United Kingdom).
  • [12] 22-205. Reduction of maintenance cost for overheated compression clemps through newly developed counter-measure and improved control method - Nakamura K., Hase V. i inni (Japan).
  • [13] 22-206. Belgian experience on initiatives to improve the capability of existing overhead lines - Lamsoul S., Rogier J. i inni (Belgium).
  • [14] 22-207. Diagnostic methods of non-ceramic insulators for HV lines - De Nigris M., Tavano F, Zagliani F., Rendina R. (Italy).
  • [15] 22-208. Methodology and results of 330-500 kV overhead line ageing assessment for their maintenance planning and reliability assurance - Dikoy V.P., Lavrentiev V.M., Krylov S.V., Timashova L.V., Nikiforov E.P, Fedosenko R.Ya. (Russia).
  • [16] 22-301. Application of real time thermal ratings for optimizing transmission line investment and operating decisions - Seppa T.O., Clements M., Damsgaard-Mikkelsen S. (USA, Denmark, New Zealand).
  • [17] 22-302. IEEE'S approach for increasing transmission line ratings in North America - Douglass D.A., Seppa T.O., Motlis Y. (USA, Canada).
  • [18] 22-303. Working Group 37.27. Ageing of the system - impact on planning.
  • [19] 22-304. Working Group 22.12. Description of state of the art methods to determine thermal rating of lines in real-time and their application in optimising power flowI.
  • [20] 22-305. Determination of the thermal rating and uprating methods for existing lines - Stephen R., Muftic D. (South Africa).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BPOA-0004-0025
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.