Identyfikatory
Warianty tytułu
Języki publikacji
Abstrakty
The traditional (e.g. Gantt chart) and modern (network modeling) scheduling techniques reach their limits quite soon in case of large projects. In case of thousands of activities, the current methods do not provide an effective evaluation. This paper would like to show tools that can solve the above-mentioned problem. We have several options for handling these matters effectively. For example: fine scheduling based on resource and cost use, innovative solutions for printing of complex schedules. The latter includes the poster-like presentation of several plan details. These applications can be considered novelties in project planning methodology
Czasopismo
Rocznik
Tom
Strony
214--221
Opis fizyczny
Bibliogr. 8 poz., wykr.
Bibliografia
- 1. Hajdu M. (1996a). Network Scheduling Techniques for Construction Project Management. Kluwer Academic Publisher, ISBN 0-7923-4309-3.
- 2. Hajdu M. (1996b). PDM Time Cost Trade Off: Activities Are Splittable or Non-Spittable. Optimization, Vol. 38, 155-171.
- 3. Kelley J.E., Walker M.R. (1959). Critical Path Planning and Scheduling, In: Proc. the Eastern Joint Computer Conference, Boston.
- 4. Roy B. (1959). Theorie des graphes: Contribution de la theorie desígraphes a l’etudede certains problemes linearies. Comptes rendus des Seances de l’Acedemiedes Sciences, seence du Avril 1959, 2437-2449.
- 5. Craig J. (1964). IBM Users Manual for IBM 1440 ProjectControl System.
- 6. Görög M. (2003). A projekttervezés mestersége. AULA, Budapest,
- 7. Hajdu M., Klafszky E. (2002). Hálós tervezési technikák az építések tervezésében és irányításában. Műegyetemi Kiadó, Budapest.
- 8. PMI (2006). Projektmenedzsment útmutató - PMBOK Guide. Akadémiai Kiadó, Budapest.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BPB2-0054-0002