Planning order release dates for multilevel linear supply chain with random lead times

Identyfikatory
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
A multilevel linear supply chain is considered in this paper. The lead times at each level are random discrete variables, and the finished product demand is fixed and known. The objective is to minimize the sum of holding and backlogging costs for the finished product. We propose a novel mathematical model which gives the optimal order release dates for the components. From a theoretical point of view, this formulation is equivalent to the discrete Newsboy model. Numerical tests are reported.
Czasopismo
Rocznik
Strony
19--25
Opis fizyczny
Bibliogr. 15 poz., wykr.
Twórcy
autor
autor
autor
autor
  • Division for Industrial Engineering and Computer Sciences, Ecole des Mines de Saint Etinne, 158, 42023 Saint Etienne cedex, France, hnaien@emse.fr
Bibliografia
  • [1] Buzacott J.A., Shanthikumar J.G., Safely stock versus safety time in MRP controlled production systems. Management Science, 40, 1994, pp. 1678-1689.
  • [2] Chu C., Proth J.M., Xie X., Supply management in assembly systems. Naval Research Logistics, 40, 1993. pp. 933-949.
  • [3] Dolgui A.. Ould Louly M.-A., A model for supply planning under lead lime uncertainty. International Journal of Production Economics, No. 78. 2002, pp. 145-152.
  • [4] Dolgui A., Louly M.-A., Prodhon C., A survey on supply planning under uncertainties in MRP environments, [in:] P. Horacek, M. Simandl, P. Zitek (eds.). Selected Plenaries, Milestones and Surveys. 16th IFAC World Congress, July 3-8, 2005, Prague, Czech Republic, 2005. pp. 228-239.
  • [5] Elhafsi M.. Optimal leadtimes planning in serial production systems with earliness and tardiness costs. IIE Trans.. 34, 2002, pp. 233-243.
  • [6] Grasso E.T., Taylor B.W., A Simulation-Based Experimental Investigation of Supply/Timing Uncertainty in MRP Svstems, International Journal of Production Research, 22 (3). 1984, pp. 485-497.
  • [7] Mula J., Poler R., Garcia-Sabater J.P., Lario F.C., Models for production planning under uncertainty: A review. International Journal Production Economics, 103. 2006, pp. 271-285.
  • [8] Ould Louly M.A., Dolgui A., Generalized newsboy model to compute the optimal planned lead times in assembly systems, International Journal of Production Research, 40(17), 2002, pp. 4401-4414.
  • [9] Ould Louly M.A., Dolgui A., The MPS parameterization under lead time uncertainly. International Journal Production Economics, 90, 2004, pp. 369-376.
  • [10] Porteus E.L., Stochastic inventory theory, [in:] D.P. Heyman, M.J. Sohel (eds.), Handbook in OR and MS, Vol. 2, Elsevier Science, 1990, pp. 605-652.
  • [11] Whybark D.C., Williams J.G., Material Requirements Planning under uncertainly. Decision Science, 7, 1976, pp. 595-606.
  • [12] Weeks J.K., Optimizing Planned Lead Times and Delivery Dales, 21st Ann. Conf. Proc.. American Production and Inventory Control Society. 1981. pp. 177-188.
  • [13] Yano C.A., Setting planned leadlimes in serial production systems with tardiness costs. Management Science, 33(1). 1987a. pp. 95-106.
  • [14] Yano C.A., Planned leadlimes for serial production systems, IIE Trans., 19(3), 1987b, pp. 300-307.
  • [15] Yano C.A., Stochastic leadtimes in two-level assembly systems, IIE Trans.. 19(4), 1987c. pp. 95-106.
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-BAT5-0027-0090
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.