PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

The benefits of the thru-tubing sand control

Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
PL
Korzyści z kontroli zapiaszczenia przez przewód wydobywczy
Języki publikacji
EN
Abstrakty
EN
Problems connected to the sand control in completed production wells usually result because of wrong primary completion design. Marginal wells that are producing sand and have poor reserves do not support the cost of a major work over program. In such cases it is not economical to re-complete the well by the use of classical tubing and packer system and standard completion rigs. Some remedial works include sand bailing with wire line (obsolete, time consuming, small volumes) and sand washing with coiled tubing. Unfortunately such services are only a temporary solution and do not solve the problem of sand production. Today there are a number of products and services available to the industry which increases the success of thru-tubing sand control. Thorough planning and training have arisen as the primary solution of the sand control problems.
PL
Problemy związane z kontrolą zapiaszczenia w otworze wydobywczym zwykle wynikają ze złego projektu wykończenia i opróbowania. Otwory na granicy opłacalności produkujące piasek mają niewielkie zasoby i nie pokrywają kosztu rekonstrukcji otworu. W tego typu przypadkach pogłębianie otworu za pomocą klasycznego orurowania i pakera oraz standardowego urządzenia do pogłębiania nie jest opłacalne. Do walki z zapiaszczeniem stosuje się łyżkowanie piasku na przewodzie (przestarzałe, czasochłonne, małe objętości) oraz wypłukiwanie piasku spiralnym przewodem wydobywczym. Niestety jest to jedynie czasowe rozwiązanie, nie likwidujące problemu zapiaszczenia. Obecnie istnieje wiele produktów i usług dostępnych dla przemysłu, które zwiększają skuteczność kontroli zapiaszczenia przez przewód wydobywczy. Dokładne planowanie i praktyka okazują się najlepszym sposobem na kontrolę zapiaszczenia.
Wydawca
Rocznik
Strony
297--308
Opis fizyczny
Bibliogr. 7 poz., rys., wykr.
Twórcy
autor
  • Faculty of Mining, Geology and Petroleum Engineering, University of Zagreb, Croatia
autor
  • Faculty of Mining, Geology and Petroleum Engineering, University of Zagreb, Croatia
Bibliografia
  • [1] Engel S.P., Kackey P.: Opportunities To Improve the Success Rate of Coiled-Tubing Operations. SPE 68429, SPE/ICoTA Coiled Tubing Roundtable, Houston, 7-8 March 2001, 1-4
  • [2] Lee C.C., Darby M.C., Popp T.R.: Effective Thru Tubing Gravel Pack Methods in Attaka Field. SPE 72132, SPE Asia Pacific Improved Oil Recovery, Kuala Lumpur, 8-9 October 2001, 1-15
  • [3] Matanovic D., Kristafor Z.: Sand washing out with coiled tubing. Nafta 45, 1994, 8
  • [4] Murphey J.R., Bila V.J., Totty K.: Sand Consolidation System Placed with Water. SPE 5031, 49th Annual Fall meeting of the SPE of AIME, Dallas, October 6-9, 1974
  • [5] Rectarick H.L., Fowler S.H., Sedotal W.P.: Thru-Tubing Sand Control Techniques Reduce Completion Costs. SPE 23130, Offshore Europe Conference, Aberdeen, 3-6 September 1991, 253-267
  • [6] Shurtz G.C., Breiner W.C., Comex B.G., Jackson B.: New Thru-Tubing Gravel Pack Techniques. SPE 5660, 50th Annual Fall Meeting of the SPE of AIME, Dallas, Sept. 28-Oct- 1, 1975, 1-13
  • [7] Yahaya I.O., Opusunju A., Arjaogu B., Agbogu G., Uchendu C., Udeh M., Oyetade T., Bakare M.: Novel through tubing Sand control Solution for failed Gravel pack Alpha Well - 4L case study. SPE 128606, 33rd Annual SPE International Technical Conference and Exhibition, Abuja, Nigeria, August 3-5, 2009, 1-6
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-article-AGHM-0030-0025
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.