Assessment of the phase-by-phase transmission line effect asymmetry on power transfer capability in open phase mode

Wybrane pełne teksty z tego czasopisma
Identyfikatory
Warianty tytułu
PL
Ocena wpływu asymetrii międzyfazowej linii przesyłowej na zdolność przesyłu mocy przy braku jednej fazy
Języki publikacji
EN
Abstrakty
EN
During the operation of EHV lines, the overwhelming proportions of single-phase short circuits can be eliminated in the cycle of a shortterm no-current pause, followed by the restoration of the normal circuit. Thus, SPAR refers to the most important measure that increases the reliability of EHV power transmission. The success of elimination of arc short circuits in the SPAR cycle on the one hand, are determined by the characteristics of the secondary arc arising in long air gaps, and on the other hand - the effectiveness of used on lines of methods for reducing secondary arc currents and recovering stresses in the place of arc burning after its extinction. Implementation of SPAR is difficult the presence of recharge of the short circuit from the side of the non-disconnected phases. The paper shows how by proper adjustment of the operating parameters that determine the conditions for extinguishing the secondary arc we get an additional reduction in losses in the transmission line due to more accurate compensation of charging power.
PL
Podczas eksploatacji linii najwyższych napięć, przeważająca część zwarć jednofazowych może być wyeliminowana w cyklu krótkotrwałej przerwy bezprądowej, po której następuje przywrócenie normalnej pracy. JSPZ jest więc najważniejszym środkiem zwiększającym niezawodność przesyłu energii elektrycznej w sieci najwyższych napięć. O powodzeniu likwidacji zwarć łukowych w cyklu JSPZ z jednej strony decydują charakterystyki łuku wtórnego powstającego w długich przerwach powietrznych, a z drugiej strony skuteczność stosowanych na liniach metod ograniczania prądów łuku wtórnego i odtwarzania napięć w miejscu wystąpienia łuku po jego zgaśnięciu. Realizację JSPZ utrudnia obecność wyładowań zwarciowych od strony faz nie rozłączonych. W artykule pokazano jak poprzez odpowiednie dobranie parametrów pracy określających warunki gaszenia łuku wtórnego uzyskujemy dodatkowe zmniejszenie strat w linii przesyłowej dzięki dokładniejszej kompensacji mocy obciążającej.
Rocznik
Strony
50--53
Opis fizyczny
Bibliogr. 13 poz., rys.
Twórcy
  • Institute of Electrodynamics of NAS of Ukraine, Kiev, Ukraine
  • Institute of Electrodynamics of NAS of Ukraine, Kiev, Ukraine
  • Vinnitsa State Pedagogical University named after M. Kotsyubynsky
  • Lublin University of Technology, Lublin, Poland
  • East Kazakhstan State Technical University named after D.Serikbayev, Kazakhstan
  • M.Kh.Dulaty Taraz Regional University, Taraz, Kazakhstan
Bibliografia
  • [1] Sili Y.; Gang L.; PeiRen W.; Duifeng Y. ; Xiangxiang G. ; Yuan Y., Discussion on the Problem About Capacitive Current Switching of EHV and UHV AC Circuit Breaker, 2017 4th International Conference on Electric Power Equipment - Switching Technology (ICEPE-ST) , 22-25
  • [2] Kachesov V., Kachesov D., Requirements for switching algorithms of EHV shunt compensated OHL by SF6 circuit breakers, Proceedings of International Conference on power systems Transients (IPST 2011) , Delft, Netherlands, 2011, 15-18
  • [3] Naumkin I., Balabin M., Lavrushenko N., Naumkin R. Simulation of the 500 kV SF6 circuit breaker cutoff process during the unsuccessful three-phase autoreclosing, Proceedings of International Conference on power systems Transients (IPST 2011), Delft, Netherlands, 2011, 5-11
  • [4] Jian H., Xiaofeng J., Xiaoguang H., Automated monitoring and analysis for high voltage circuit breaker, 2010 5th IEEE Conference on Industrial Electronics and Applications, Taichung, 2010, 560-564
  • [5] Gong R., Wang S., Luo X., Analysis and Design in Extra High Voltage Circuit Breakers Employing Shunted Capacitors, 2012 Sixth International Conference on Electromagnetic Field Problems and Applications, Dalian, Liaoning, 2012, 1-4
  • [6] Lazimov T., Saafan E., Babayeva N., Transitional processes at switching-off capacitor banks by circuit-breakers with preinsertion resistors, 2015 Modern Electric Power Systems (MEPS), Wroclaw, 2015, 1-4
  • [7] Lazimov T., Imanov S., Saafan E., Transitional recovery voltages at capacitive currents switching-offs by vacuum and SF6 circuit-breakers, 2010 Modern Electric Power Systems, Wroclaw, 2010, 1-5
  • [8] Abdulsalam S., Xu W., A sequential phase energization method for transformer inrush current reduction-transient performance and practical considerations, IEEE Transactions on Power Delivery, 2007, vol. 22(1), 208-216
  • [9] V. Kuznetsov, Y. Tugay and V. Kuchanskyy, "Investigation of transposition EHV transmission lines on abnormal overvoltages", Technical electrodynamics, pp. 51-56, Nov. 2013.
  • [10] V. Kuznetsov, Y. Tugay and V. Kuchanskyy, " Influence of corona discharge onthe internal ovevoltages in high way electrical networks", Technical electrodynamics, pp. 55-60, Nov. 2017.
  • [11] Kuznetsov V., Tugay Y., Kuchanskyy V.Overvoltages in open-phase mode. Tekhnichna Elektrodynamika..No 2.pp.40–41.2012
  • [12] Vladislav Kuchanskyy , Paul Satyam , Olena Rubanenko , Iryna Hunko Measures and technical means for increasing efficiency and reliability of extra high voltage transmission lines PRZEGLĄD ELEKTROTECHNICZNY Vol 2020, No 11. – 2020. – P. 135–141 doi:10.15199/48.2020.03.27
  • [13] Liang Ji, Booth C., Dyśko A., Kawano F., Beaumont P., Improved Fault Location Through Analysis of System Parameters During Autoreclose Operations on Transmission Lines, Power Delivery IEEE Transactions on, vol. 29 (2014), No. 6, 2430-2438
Uwagi
Opracowanie rekordu ze środków MNiSW, umowa Nr 461252 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2021).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-ae514acd-5e1e-41bf-abf6-696587244847
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.