PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Tytuł artykułu

BIM in the construction process - selected problems at the stage of implementation in Polish road engineering

Autorzy
Treść / Zawartość
Identyfikatory
Warianty tytułu
PL
BIM w procesie budowlanym - wybrane problemy na etapie wdrożenia w polskim drogownictwie
Języki publikacji
EN
Abstrakty
EN
The digitalisation of the construction process is a phenomenon that has been significantly accelerated in recent years. BIM (Building Information Modeling) technology is becoming increasingly popular with designers, contractors and investors and is being used, mainly in relation to buildings. In communication objects, the application of BIM is much more difficult, as confirmed by the shifting schedules during implementation trials in road design. And yet, BIM is not only about the design or execution of construction works, it is worth taking advantage of the new possibilities especially at the stage of using the facility. BIM in transportation infrastructure is already used in other countries, mainly in Scandinavia, where work on its implementation began at the beginning of this century. The preparation of appropriate procedures and standards, adjusted to national realities, requires gathering experience on pilot investments. The paper presents an analysis of the necessary initial data which will make it possible to apply BIM in the Polish road construction industry. Moreover, the main risks occurring at various stages of the construction process are presented. The aim of the article is to indicate the necessary actions that will allow the advantages of BIM technology to be used more fully in road investments. The implementation of BIM in Polish road construction is not a distant future but rather "tomorrow", so it is worth knowing the limitations and preparing for the upcoming changes.
PL
Cyfryzacja procesu budowlanego to zjawisko, które w ostatnich latach zostało znacząco przyśpieszone. Technologia BIM (Building Information Modeling) cieszy się coraz większym zainteresowaniem ze strony projektantów, wykonawców oraz inwestorów i jest stosowana, głównie w odniesieniu do obiektów kubaturowych. W obiektach komunikacyjnych zastosowanie BIM jest znacznie trudniejsze, co potwierdzają przesunięcia harmonogramów podczas prób wdrożeniowych w projektowaniu dróg. A przecież BIM to nie tylko etap projektowania czy realizacji robót budowlanych, warto korzystać z nowych możliwości szczególnie na etapie użytkowania obiektu. BIM w infrastrukturze komunikacyjnej jest już stosowany w innych krajach, głównie skandynawskich, gdzie rozpoczęły się prace nad jego wdrożeniem na początku obecnego stulecia. Ministerstwo Infrastruktury przygotowało zalecenia dotyczace BIM w polskim budownictwie drogowym. W marcu 2021 r. rekomendowano do stosowania wzorce i standardy dotyczące modelowania informacji o drogowych obiektów inżynierskich (BIM-M). Analogiczne opracowanie dotyczace dróg (BIM-D) zostanie prawdopodobnie opublikowane w najbliższym czasie. Przygotowanie odpowiednich procedur oraz standardów, dostosowanych do krajowych realiów, wymaga zebrania doświadczeń na inwestycjach pilotażowych. Celem artykułu jest wskazanie koniecznych działań, które pozwolą na pełniejsze wykorzystanie zalet technologii BIM w inwestycjach drogowych.
Rocznik
Strony
623--633
Opis fizyczny
Bibliogr. 30 poz., il., tab.
Twórcy
  • University of Zielona Góra, Institute of Civil Engineering, Zielona Góra, Poland
Bibliografia
  • [1] “BIM Standard PL”, [Online]. Available: https://www.gov.pl/attachment/9a5b41e7-dcc1-4d1c-aa9e-4174c008df82. [Accessed: 21.03.2021].
  • [2] Ustawa z dnia 7 lipca 1994 r. - Prawo budowlane Dz.U. 2020 poz. 1333 z późniejszymi zmianami.
  • [3] EN ISO 16739:2016 Industry Foundation Classes (IFC) for data sharing in the construction and facility management industries - Part 1: Data schema.
  • [4] EN ISO 16739:2020 Industry Foundation Classes (IFC) for data sharing in the construction and facility management industries - Part 1: Data schema.
  • [5] https://technical.buildingsmart.org/standards/ifc/ifc-schema-specifications/. [Accessed: 22.05.2021].
  • [6] “Common InfraBIM Requirements 2019 (YIV2019)”. [Online]. Available: https://buildingsmart.fi/wp-content/uploads/2019/08/YIV_main_document_ENG_DRAFT1.pdf. [Accessed: 22.05.2021].
  • [7] A. Anger, B. Lisowski, W. Piwkowski, P. Wierzowiecki, “Ogólne założenia procesu wdrażania BIM w realizacji zamówień publicznych na roboty budowlane w Polsce”, Przegląd Budowlany, 2015, no. 10, pp. 6-9.
  • [8] D. Kasznia, J. Magiera, P. Wierzowiecki, BIM w praktyce. Standardy. Wdrożenie. Case Study. Warszawa, 2018.
  • [9] A. Tomana, BIM. Innowacyjna technologia w budownictwie. Podstawy, standardy, narzędzia. Kraków, 2015.
  • [10] Umsetzung des Stufenplans Digitales Planen und Bauen. Erster Fortschrittsbericht. Berlin: Bundesministerium für Verkehr und digitale Infrastruktur, 2017.
  • [11] https://bim4infra.de/ [Accessed: 22.05.2021].
  • [12] S. Džumhur, Ž. Ljevo, J. Marić. “BIM Project Execution Planning Suited for Road Infrastructure Pilot Project in Bosnia and Herzegovina”, in: M. Hadžikadić, S. Avdaković, Eds., Advanced Technologies, Systems, and Applications II. IAT 2017. Lecture Notes in Networks and Systems, Vol. 28. Springer, 2018, DOI: 10.1007/978-3-319-71321-2_50.
  • [13] H. Chong, R. Lopez, J. Wang, X. Wang, Z. Zhao, “Comparative Analysis on the Adoption and Use of BIM in Road Infrastructure Projects”, Journal of Management in Engineering, 2016, vol. 32, no. 6, DOI: 10.1061/(ASCE)ME.1943-5479.0000460.
  • [14] M. Karolak, et al., “Projekt pilotażowy zastosowania technologii BIM w GDDKiA przy projektowaniu i budowie obwodnicy Zatoru”, (A pilot project for the application of BIM technology in GDDKiA in the design and construction of the Zator bypass), Magazyn Autostrady, 2018, vol. 10, pp. 83-89.
  • [15] P. Szabłowska, M. Rochel, “Wykorzystanie technologii BIM w projektach infrastruktury transportowej”, (Use of BIM technology in transport infrastructure projects), Przegląd Komunikacyjny, 2020, vol. 75, no. 6/7/8, pp. 14-19.
  • [16] “Cyfryzacja procesu budowlanego w Polsce. Mapa drogowa dla wdrożenia metodyki BIM w zamówieniach publicznych”, [Online]. Available: https://www.gov.pl/attachment/2552e46d-991f-4bda-849e-1a61ce4b3e76. [Accessed: 26.11.2020].
  • [17] “B/555 Roadmap (June 2013 Update)”, [Online].Available: https://www.scribd.com/document/386483725/B555-Roadmap. [Accessed: 22.05.2021].
  • [18] BS 8541-1:2012 Library objects for architecture, engineering and construction. Identification and classification. Code of practice.
  • [19] M. Salamak, D. Kasznia, “Technologia BIM w projektach mostowych jako element rewolucji przemysłowej 4.0”, Mosty, 2017, no. 6, pp. 34-40.
  • [20] BIM-M-01 Powiązanie wymagań technicznych dotyczących drogowych obiektów inżynierskich z technologią BIM. [Online].Available: http://www.gov.pl/attachment/3ce9ead6-08d8-4e11-80a8-5d22124 eddff. [Accessed: 15.04.2021].
  • [21] BIM-D-01 Powiązanie wymagań technicznych dotyczacych dróg publicznych z technologią BIM, projekt. [Online]. Available: http://www.gov.pl/attachment/bf11612a-6a5c-4f70-8fcf-a73b8cfc879e. [Accessed: 01.12.2020].
  • [22] M. Previtali, R. Brumana, F. Banfi, “Existing infrastructure cost effective informative modelling with multisource sensed data: TLS, MMS and photogrammetry”, Applied Geomatics, 2020, vol. 275, DOI: 10.1007/s12518-020-00326-3.
  • [23] M. Shafiq, J. Matthews, S. Lockley, “A study of BIM collaboration requirements and avaliable feature in existing model collaboration systems”, Journal of Information Technology in Construction, 2013, vol. 18, pp. 148-161.
  • [24] M. Gürtler, K. Baumgärtel, R. J. Scherer, “Towards a Workflow-Driven Multi-model BIM Collaboration Platform”, in L. Camarinha-Matos, F. Bénaben, W. Picard, Eds., Risks and Resilience of Collaborative Networks. PRO-VE 2015. IFIP Advances in Information and Communication Technology, vol. 463. Cham: Springer, 2015, DOI: 10.1007/978-3-319-24141-8_21.
  • [25] K. Zima, “Impact of information included in the BIM on preparation of Bill of Quantities”, Procedia Engineering, 2017, vol. 208, pp. 203-210, DOI: 10.1016/j.proeng.2017.11.039.
  • [26] M. Gołaszewska, M. Salamak, “Challenges in takeoffs and cost estimating in the BIM technology, based on the example of a road bridge model”, Technical Transactions, 2017, vol. 4, pp. 71-79.
  • [27] B. Hoła, “Identification and evaluation of processes in a construction enterprise”, Archives of Civil and Mechanical Engineering, 2015, vol. 15, no. 2, pp. 419-426, DOI: 10.1016/j.acme.2014.11.001.
  • [28] G. Bosurgi, C. Celauro, O. Pellegrino, N. Rustica, S. Giuseppe, “The BIM (Building Information Modeling)- Based Approach for Road Pavement Maintenance”, in M. Pasetto, M. Partl, G. Tebaldi, Eds., Proceedings of the 5th International Symposium on Asphalt Pavements & Environment (APE). ISAP APE 2019. Lecture Notes in Civil Engineering, vol. 48. Cham: Springer, 2020, DOI: 10.1007/978-3-030-29779-4_47.
  • [29] T. Płaszczyk, M. Salamak, “Proces inspekcji mostu z użyciem metodyki BIM – cz. I”, (Bridge inspection process using the BIM methodology), Mosty, 2020, no. 1, pp. 46-50.
  • [30] R. Sacks, et. al., “SeeBridge as next generation bridge inspection: overview, information delivery manual and model view definition”, Automation in Construction, 2018, vol. 90, pp. 134-145.
Uwagi
Opracowanie rekordu ze środków MEiN, umowa nr SONP/SP/546092/2022 w ramach programu "Społeczna odpowiedzialność nauki" - moduł: Popularyzacja nauki i promocja sportu (2022-2023).
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-97eb601a-e129-45af-92b1-03ab3d472b94
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.