Cogeneration units, which generate heat and electricity using the same technological process, and which transmit their surplus electricity to theelectricity grid, are subject to the provisions of Commission Regulation (EU) 2016/631 of April 14, 2016 establishing a network code on requirements for grid connection of generators(NC RfG). Thearticle discusses the legal and technical conditions for cogeneration units, which were established in particular to ensure the safety of electricity supply. It also presents the procedure and rules for confirming the compliance of cogeneration units with the technical requirements of the Network Code mentioned above on the basis of tests and certification carried out at the KOMAG Institute.
Czasopismo
Rocznik
Tom
Strony
231--238
Opis fizyczny
Bibliogr. 8 poz., rys., ta., wykr., zdj.
Twórcy
autor
- KOMAG Institute of Mining Technology, Pszczyńska37, 44-101 Gliwice, Poland
autor
- KOMAG Institute of Mining Technology, Pszczyńska37, 44-101 Gliwice, Poland
Bibliografia
- [1]Reduction of greenhouse gas emissions:European Parliament. Article dated 31.10.2023. 20180305STO99003
- [2]Modern district heating. Cogeneration: more energy without increased emissions. https://nowoczesnecieplownictwo.pl/kogeneracja/[accessed:31.10.2023]
- [3]Commision Regulation (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of generators -Official Journal of the European Union 27.4.2016 L 112/4
- [4]Decision of thePresident of the Energy Regulatory Office DRE.WOSE.7128.184.3.2018.ZJdated July 16, 2018, approved by the President of the Energy Regulatory Office (ERO)https://www.pse.pl/documents/20182/31216853/20180806_decyzja_ure/717e22be-85b2-4aa3-b006-c365ae577f05?safeargs=646f776e6c6f61643d74727565[accessed:31.10.2023]
- [5]Requirements and procedures for the use of certificates in the process of connection of power generating modules to power grids, version 1.2 effective from 21.04.2021. -A study by the Polish Power Transmission and Distribution Association
- [6]General Application Requirements resulting from the Commission Regulation (EU) 2016/631 of April 14, 2016 establishing a networkcode on requirements for grid connection of generators -approved by the decision of the President of the Energy Regulatory Authority DRE.WOSE.7128.550.2.2018.ZJ dated 2 January,2019https://www.pse.pl/documents/20182/31216853/20190102_decyzja_wymogi_RfG.pdf/1edc511f-14f3-4280-aaba-f6d9cf36c8f6[accessed:31.10.2023]
- [7]Polish Standard PN-EN50549-1:2019-02Requirements for generating plants to be connected in parallel with distribution networks -Part 1: Connection to a LV distribution network -Generating plants up to and including Type B
- [8]http://ptpiree.pl/documents/opracowania/kodeksy_sieci/lista/2023-10-31-wykaz-urzadzen-akceptowanych-po-01.05.2022.pdf[accessed:31.10.2023]
Uwagi
Opracowanie rekordu ze środków MEiN, umowa nr SONP/SP/546092/2022 w ramach programu „Społeczna odpowiedzialność nauki” - moduł: Popularyzacja nauki i promocja sportu (2022-2023)
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.baztech-93706522-dfa8-48d5-ba3e-d8d31f3cb45e